EnerSys earnings recap

Q2 FY2027, reported November 11, 2026 · Beat 7 of last 7 quarters

EnerSys reported Q2 FY2027 revenue of $950M, a miss of 1.9% against consensus, and EPS of $3.22, a beat of 0.9%.

The Buildout is a website built by one person using AI agents, and could have factual errors.

Go to the full EnerSys company page →See the earnings preview →EnerSys is in the Power Systems layer →
What this means for the buildout

EnerSys sits on the backup-power layer of the AI data center buildout, and this quarter's signal is that demand is broadening rather than slowing: data center backlog more than doubled, data center bookings rose mid-teens, and management described growth as concentrated in brownfield sites where TPPL lead-acid avoids new permitting and fire-suppression requirements. The lithium DataSafe Noir pipeline — nearly 80 opportunities and over 1,000 battery cabinets, with only six cabinets shipped — frames FY2028 as the incremental layer on top of that lead-acid base, while the Ultralife deal and the South Carolina defense lithium plant extend the FEOC-compliant, domestically sourced battery supply chain into drones, counter-drone and soldier power.

Results vs consensus
EstimateActualvs est
Revenue$969M$950M-1.9%miss
EPS$3.19$3.22+0.9%beat
What was said

Net sales were $950M, roughly flat year over year and at the low end of guidance before FX, as prolonged material handling delays pressured the top line more than expected. Adjusted gross margin ex-tariff refunds was 30.2%, up 110 bps, and adjusted operating earnings ex-refund rose 15% to $154M at a 16.2% margin; adjusted diluted EPS ex-refund was $3.26, up 23%. NIS revenue rose 3% to $449M with adjusted operating earnings up 38% to $50M (11.2% margin, +290 bps), PPS revenue rose 21% to $104M at a 21.9% margin, and IMS revenue fell 8% to $397M with adjusted operating earnings down 13% to $38M (9.5% margin, -60 bps) on material handling softness and unfavorable mix. Free cash flow was $130M with 146% conversion (275% ex-45X), net debt fell nearly $130M since fiscal year-end to $555M at 0.8x leverage, and the company repurchased 679,000 shares for $130M in the quarter plus ~239,000 shares for ~$40M after quarter-end. The company also announced a proposed $320M enterprise-value acquisition of Ultralife at 8.3x synergy-adjusted trailing twelve-month adjusted EBITDA, received a first DataSafe Noir order, and recognized initial revenue from its next-gen lithium material handling offering.

Key metrics
Orders / book-to-bill
+21% YoY
Book-to-bill of 1.09; orders up in every line of business, with PPS orders up 203% on program awards and transportation orders up 60% YoY / 45% sequentially
Backlog
+36% YoY
NIS backlog +26%, PPS +102%, IMS +3%; quarterly backlog coverage of 1.3x vs 1.1x last quarter and 1.0x a year ago; data center backlog more than doubled
Precision Power Solutions revenue
$104M
Up 21% YoY on defense volumes and favorable price/mix; adjusted operating margin 21.9%, up 340 bps
Adjusted operating earnings (ex-tariff refund)
$154M
16.2% margin, up 210 bps YoY; ex-45X and refund, $110M at 11.6% margin, up 170 bps
Adjusted diluted EPS (ex-tariff refund)
$3.26
Up 23% YoY; ex-45X and refund, $2.06, up 28%
Management outlook

Guidance for Q3 FY2027 is net sales of $935M-$975M and adjusted diluted EPS of $3.05-$3.15, excluding tariff refunds, customer reimbursements of refunds, and any impact from the pending Ultralife acquisition. Management framed the quarter's earnings growth as margin- and cost-led, with top line contributing more meaningfully in the second half; Q3 assumes communications picks up and material handling shows early recovery sufficient to turn IMS segment revenue to year-over-year growth. They flagged three margin nuances: IMS mix pressure as transportation outpaces higher-margin material handling, tough project-driven comps in PPS and NIS after exceptionally strong margins in 3Q FY2026 and 2Q FY2027, and a step-up in freight and commodity inflation that may take a quarter to fully recapture. On capacity and capital, FY2027 CapEx is unchanged at roughly $70M, the South Carolina defense lithium plant is slated to begin construction in the first half of fiscal 2028 once the NEPA process concludes, and the ~$320M Ultralife deal is expected to close in the first calendar quarter of 2027 with $15M-$20M of run-rate cost synergies within 18 months. On policy, management said it does not anticipate a material change to its data center outlook from the U.S. midterm elections and does not expect major change to FEOC/45X support; it will continue to report results with and without 45X but will not separately guide it.

From the call

“We remain ready to capture pent-up demand and maintain a high degree of confidence that the material handling market will improve later this fiscal year with return to growth by fiscal year-end.”

on Material handling recovery timing

“And so all of our growth has been in brownfield. And even if the AI thing were to slow and without debating that point, we don't really see any cessation in brownfield expansion because even without AI, there's just this climbing need for data, data processing, data transport.”

on Data center demand durability

“I can't see any reason why when things normalize, this shouldn't be mid- to high teens business.”

on IMS normalized margin potential

What analysts asked

What drove price/mix in IMS this quarter — price versus mix — and what gives confidence in a material handling recovery in Q4, and how much recovery is needed before IMS margins improve?

Shawn attributed the price/mix hit primarily to mix — fewer TPPL sales and more flooded sales on customer timing — rather than price. Confidence rests on truck OEM order data (one public reporter cited bookings up 45% year over year) with EnerSys typically trailing that by up to about a quarter, plus share gains in flooded lead-acid and continued replacement demand. Andi added that transportation revenue growth in the mid-20s is a leading signal, and that Gen 2 lithium and Synova chargers — where charger attach rates are high and chargers are the highest-margin part of material handling — support a return to mid- to high-teens margins when the market normalizes.

Telecom isn't mentioned in the release or slides — what are you seeing in telecom, which has historically been a large part of sales, given carrier spending weakness elsewhere?

Shawn explained telecom and broadband are now reported collectively as communications, with individual color given when there are updates. Andi said communications is flat year over year and up about 6% sequentially, will be up year over year next quarter, but with lower revenue and higher margin because some lower-margin enclosure business pulled into Q2 last year. DOCSIS 4.0 demand remains robust, the XM Edge savings platform has awards with field trials starting this month and production next year, and Shawn noted the replacement/break-fix portion of the battery business adds resilience versus project deployments.

What's the genesis of the Ultralife acquisition, how does it scale you into aerospace and defense, and does it tie into the planned cell facility?

Shawn said EnerSys knows the business well, that Ultralife brings attractive chemistries — some similar to EnerSys' nine lithium chemistries, some new — that help in drone and counter-drone, and that its purpose-built liquid reserve battery facility with existing permitting and chemistry handling expertise accelerates EnerSys' own expansion plans in that space. A full integration plan will wait until closing after the first of the year, but he called the defense fit compelling, citing both the chemistry portfolio and the Ultralife team's operating expertise.

Potential supply chain impact
VRTEnerSys cited over 50% U.S. share of lead-acid batteries in UPS systems and a doubling of data center backlog, which could be a read on sustained UPS battery demand in the same facilities where Vertiv sells power and thermal infrastructure; the overlap is more adjacent than direct, so the read is on end-market strength rather than share shift.
APHEnerSys' communications segment was flat year over year with DOCSIS 4.0 power-electronics demand called robust and network powering refreshes continuing — commentary that may hint at similar connectivity-capex-driven demand trends for interconnect and power components.
ABBEnerSys' Fortix warehouse battery energy storage system, Synova chargers and next-gen lithium offering push it further into electrification and charging adjacencies; a material handling recovery plus these launches could sharpen competitive overlap, though Fortix volume is not expected until mid-next fiscal year.