Company Explorer

524 companies across 13 layers of the buildout

The whole chain from silicon design to cloud operators — mapped in the order it actually gets built.

Mapped in build order — silicon first, cloud operators last. Tap any layer to see the companies inside it.
01Silicon Design44 companiesThe chips themselves — accelerators, memory, EDA tools, and the IP inside every AI processor.AMDAVGOCBRSINTCLSCCMRVLNVDAQCOMAIPARM+34 more›02Chip Making60 companiesThe machines, materials, and foundries that turn chip designs into physical silicon.GFSSKYTTSEMTSMUMCAACLSACMRAEHRAMAT+50 more›03Servers & Compute27 companiesServer OEMs, contract manufacturers, storage, and the components that go on every board.DELLHPEHPQSMCIBHECLSFLEXJBLPLXSSANM+17 more›04Networking24 companiesSwitches, optical transceivers, cables, and fiber that connect thousands of GPUs into one machine.ADTNANETATENCSCODGIIFFIVNOKAAOICIENCOHR+14 more›05Cooling35 companiesLiquid cooling, HVAC, and water systems that move heat from the chip to the sky.AMEAPCRDCIDOVECLFELEFLSGRCGTES+25 more›06Power Systems44 companiesSwitchgear, busway, UPS, batteries, and grid equipment that distribute power inside the building.ABBAEISALNTATKRBELFBETNHEIHUBBLFUSMEC+34 more›07Power Generation27 companiesGas turbines, nuclear reactors, fuel cells, solar, and the fuel that runs them.BWBWENFTEKGEVHWMMIRBWXTCCJIMSRLEU+17 more›08Utilities & Energy74 companiesUtilities that deliver electricity, and the oil, gas, and pipeline companies that fuel generation.AEEAEPAVABKHCMSCNPDDTEDUKEIX+64 more›09Construction76 companiesThe contractors, materials, equipment, and building products that physically build data centers.ACMAGXAPGBBCPBWMNCTRIDYECGEMEFIX+66 more›10Natural Resources20 companiesMetals, mining, and raw materials that go into chips, cables, buildings, and power systems.AAALBATCXATIATLXBHPCENXCRMLCRSFCX+10 more›11Operators34 companiesHyperscalers, data center REITs, NeoClouds, and the companies that run the compute.AMZNGOOGLMETAMSFTORCLCCOIDLREQIXGDSIRM+24 more›12Software & Design13 companiesDesign tools, infrastructure software, and cybersecurity for the buildout.ADSKBSYPCORPTCTRMBDDOGFTNTGRRRNTNXPANW+3 more›13Services & Investment46 companiesInfrastructure investors, industrial automation, distribution, telecom, and logistics.BAMBIPBXDBRGGLXYHASIKKRLBTPLCBRE+36 more›