Explorer/Supply chain/Silicon Design
01

Silicon Design

The chips themselves — GPUs, ASICs, networking silicon, analog power ICs, memory, and the electronic design tools used to create them. This is where the compute starts.

How this layer works: Chapter 1, The Chip →

44companies
6chokepoints
5sub-roles
Chokepoints in this layer
6 positions here have no real alternative supplier. AMD (ai gpu and cpu designer), AVGO (custom ai accelerator chips), INTC (ai chips and foundry), MRVL (custom ai silicon designer), NVDA (ai gpu and systems) and ALAB (ai connectivity hardware). A disruption at any one ripples through the entire chain downstream.
Deep teardownComing soon
Inside the silicon design layer
A full physical decomposition of this layer of the buildout — what goes where, who makes it, and where the bottlenecks are. Links here when the teardown publishes under Learn.
← Start of the chainNext layer: Chip Making →