Diodes Incorporated (DIOD) | The Buildout — AI Infrastructure

——Mkt cap — · 52-wk —–— · YTD — · delayed
Updated Oct 19, 2026Q2 FY2026 reviewed
Diodes Incorporated makes analog, discrete, power and timing chips that go inside AI servers and networking gear.
Revenue +22% YoY
Q2 2026 revenue above the $435M guide midpoint, +10% QoQ.
GM guide 35%
Q3 GAAP gross margin guided to 35% ±1%, up 190 bps sequentially.
AI content $267
Estimated content vs $109 for AI server platforms (no unit stated).
Comms −7% QoQ
Only end market down both QoQ and YoY; China smartphone softness.
The Buildout Takeaway
Two straight quarters of beating its own guide, with each new guide set higher on revenue, margin and earnings. Management also moved from deflecting the AI sizing question on the Q1 call to publishing a content estimate on the Q2 call — a disclosure upgrade, but still not a revenue line. The open question is how much of the above-seasonal demand is AI content converting versus a supply-disruption benefit the company says it is still collecting.
13 analysts·9 Buy4 Hold0 Sell
Coverage is thin — only 1 price estimate, so no target is shown

Q3 2026: revenue ~$510M ±3% · GAAP gross margin 35% ±1% · non-GAAP EPS $1.05 ±$0.10 · FY2026 tax rate ~18% ±3% · capex 5–9% of revenue
Important: The Buildout is a data analytics platform. Content is generated by algorithms and AI agents using public filings, earnings transcripts, and market data. This is not personalized investment advice.
Our View

The Verdict

Diodes is a broad-line semiconductor manufacturer. It sells analog, discrete, power, mixed-signal, logic, timing and sensor products, and its AI exposure is spread across the whole system rather than concentrated in one socket. In an AI platform, management says its parts can attach to the server motherboard, the power network that supports a full power life cycle, networking switches, storage and high-speed optical interconnect. That makes Diodes a component supplier riding platform content, not a platform vendor and not a bottleneck owner. It reports as a single segment, so end-market mix on the calls is the only view into where the growth is coming from.

Market Cap—
Revenue (TTM)$1.6B
Revenue Growth+17.8%
EBITDA Margin (TTM)13.5%
Net Cash$418M
Earnings Beats5 of 7
P/E (TTM)—
EV/EBITDA (TTM)—

What We Like

  • Two consecutive quarters beat the prior guide's midpoint: Q2 2026 revenue of $445.5M against a $435M guide, gross margin of 33.1% against 32.8% guided, and non-GAAP EPS of $0.70 against a $0.60 guide top end.
  • Gross margin has risen three quarters straight: 31.1% (Q4 2025), 31.8% (Q1 2026), 33.1% (Q2 2026), with 35% ±1% guided for Q3 2026.
  • Automotive reached a record 21% of product revenue, up 15% QoQ and 37% YoY; computing, the largest end market at 28%, grew 18% QoQ and 33% YoY.
  • Management put a figure on AI for the first time: an estimated ~$267 total content opportunity across the combined AI application areas versus $109 for AI server platforms alone, with no unit stated in the transcript.
  • The balance sheet was net cash at 6/30/26 — $430.4M of cash plus $9.5M of short-term investments against $70.4M of total debt — before the August convertible notes and the ElevATE payment.

What We’re Watching

  • Whether Q3 2026 lands at the guide: guided revenue, 35% ±1% gross margin and $1.05 non-GAAP EPS, given on the Aug 5, 2026 call.
  • Pricing commentary went silent on the Q2 call after management called pricing "really, really stabilized" in Q1 — leaving the gross-margin bridge with one unquantified driver.
  • Communications fell to 11% of product revenue and was the only end market down both QoQ (−7%) and YoY (~−3%), on China smartphone softness; consumer is "challenged by memory shortage and slower demand."
  • The $700M gross-profit element of the three-year target set was released on the Q1 2026 call and not restated on the Q2 2026 call.
Bottom Line

The thesis is strengthening. Two quarters of beat-and-raise, a gross-margin stair-step toward a 35% guide, record automotive share and the first quantified AI content figure all point the same way, and the company is funding capacity expansion and a $250M acquisition from a net-cash balance sheet. The offsets are structural rather than new: fixed-price contracts of days to several months, no backlog disclosure, two distributor customers above 10% of net sales, and a communications segment still shrinking. The open question is whether the above-seasonal growth is AI content converting into revenue or share taken while competitors were supply-constrained — and whether the 35% gross-margin guide holds now that pricing commentary has gone quiet.

Next upThe next test is the Q3 2026 report against the guided revenue, 35% gross margin and $1.05 non-GAAP EPS guide given on Aug 5, 2026. It also carries the first read on management's Q4 language — "good momentum so far" — since no formal Q4 guidance was given.
Last Quarter — Q2 FY2026

Earnings Beat

Q2 2026 revenue was $445.5M, up 22% from $366.2M a year earlier and 10% from $405.5M in the prior quarter, above the $435M guide midpoint. GAAP gross margin was 33.1%, against 31.5% a year earlier and 31.8% in Q1 2026, and above the 32.8% guide. The standout in the earnings line is the GAAP-to-non-GAAP gap: GAAP EPS of $1.00 versus non-GAAP $0.70, largely because total other income of $24.7M included a $20M unrealized gain on investments.

MetricQ2 FY2026Q1 FY2026Q2 FY2025YoY
Revenue$446M$406M$366M+21.7%
Gross margin33.1%31.8%31.5%+160bps
EBITDA$68.5M$55.1M$45.3M+51.2%
EPS (GAAP)$1.00$0.33$0.99+1.3%
Automotive end-market share21% (record)20%n/aAutomotive revenue +37% YoY
Computing end-market share28%26%n/aComputing revenue +33% YoY
Table shows reported figures; the text may discuss adjusted or continuing-operations numbers.
Across this combined AI application areas, our estimated total content opportunity is approximately $267, representing a meaningful incremental increase compared to AI server platforms of $109.— Emily Yang, SVP Worldwide Sales and Marketing, Aug 5, 2026

Management tone: Tone on the Q2 2026 call was confident and noticeably more quantitative than the prior call. Management quantified AI content for the first time, gave unusually specific targets for the ElevATE acquisition and stepped the guide up on every line. It was direct on the internal-versus-outsourced split ("It's about 50-50 at this moment") and on channel demand quality, denying double-booking. It declined to give SPFAB profit-and-loss detail, reframed Q4 and 2027 to softer language, and went silent on pricing and LEO satellites after addressing both in Q1. One inconsistency: the streak count moved the wrong way, from "sixth consecutive quarter" in Q1 to "fifth" in Q2, even though both quarters grew 22% year over year.

Management Guidance

Management guided Q3 2026 to revenue of ~$510M (±3%), a 30% year-over-year and 14% sequential increase at the midpoint; GAAP gross margin of 35% (±1%), framed as another 190 basis points of sequential improvement; and non-GAAP EPS of $1.05 (±$0.10), alongside a 2.8x year-over-year improvement in non-GAAP earnings. The full-year 2026 effective tax rate was reaffirmed at ~18% ±3%, and capex stays within the 5–9% of revenue target range. No guidance was given for Q4 2026 or 2027 — management said it does not guide more than one quarter, that Q4 momentum is "good so far" and that 2027 "should be stronger than usual." The three-year goals of $2B annual revenue and over $4 in non-GAAP EPS were reaffirmed; the $700M gross-profit element released in Q1 was not restated.

Business Trajectory

Trajectory

Revenue has accelerated across four visible quarters: $391.6M (Q4 2025), $405.5M (Q1 2026, +3.5% QoQ), $445.5M (Q2 2026, +10% QoQ) and ~$510M guided for Q3 2026 (+14% QoQ at the midpoint). Year-over-year growth was +22% in both reported quarters and is guided to +30%. Gross margin followed the same direction: 31.5% (Q2 2025), 30.7% (Q3 2025), 31.1% (Q4 2025), 31.8% (Q1 2026), 33.1% (Q2 2026), with 35% guided. Management attributes the margin move to mix from automotive and industrial, improving utilization, and cost and operating initiatives put in place during the slowdown. The computed signals show operating margin expanding 230 basis points and EBITDA margin expanding 120 basis points, with trailing-twelve-month free cash flow at 150% of net income.

Revenue & Margin Trajectory
RevenueGross margin (42% to 33%)$0$200$400$521M$446M42%Q4'22Q2'23Q4'23Q2'24Q4'24Q2'25Q4'25Q2'26
RevenueGross margin (34% to 33%)$0$200$400$350M$446MQ4'24Q2'25Q4'25Q2'26
Most recent quarters shown (8 on phones, 16 on larger screens). Gross margin as reported; gaps mean the figure was not reported.
Share Price — 12 Months
$50$75$100$12552-wk high $126$86Oct '25Jan '26AprJulOct '26
YTD +73.3%. 52-week range $42–$126.
Share Price — 12 Months
$50$75$100$12552-wk high $126$86Oct '25Jan '26AprJulOct '26
YTD +73.3%. 52-week range $42–$126.
The Numbers

The Model

The model projects next fiscal year's revenue of $1.90B and EBITDA of $327M, a 17.2% EBITDA margin, then the following fiscal year's revenue of $2.31B and EBITDA of $466M, a 20.2% margin. The near-term anchor is the Q3 2026 revenue guide at a 35% gross margin, plus the ~$50M of first-12-month revenue management expects from ElevATE. The step up into the following fiscal year assumes content expansion converts — server timing design wins, 400V/800V power-architecture products and automotive design wins — and that internal fab utilization improves on management's 2027–2028 timetable.

Revenue & EBITDA Projections
REVENUE$1.5B$1.9B$2.3BFY25Next FY (E)FY after (E)EBITDA & MARGIN$179M$327M$466MFY25Next FY (E)FY after (E)
REVENUE$1.5B$1.9B$2.3BFY25Next FY (E)FY after (E)EBITDA & MARGIN$179M$327M$466MFY25Next FY (E)FY after (E)
Solid bars are reported actuals; outlined bars are model projections — not company guidance.
MetricFY2025Next FY (E)FY after (E)
Revenue$1.5B$1.9B$2.3B
YoY Growth—+28.3%+21.3%
EBITDA$179M$327M$466M
EBITDA Margin12.1%17.2%20.2%

Projections are the median of 5 independent model runs.

What Could Go Right — and Wrong

What good looks like
  • Q3 2026 lands at or above the revenue and 35% gross-margin guide, keeping year-over-year growth near 30%.
  • Gross margin holds at 35% or better as automotive and industrial mix stays rich and utilization improves.
  • ElevATE delivers the ~$50M of first-12-month revenue and above-corporate gross margin management expects, adding a higher-margin test-equipment business.
  • Internal fab loading at the two Western fabs improves ahead of the 2027–2028 timeline, adding capacity and a visible margin tailwind.
  • AI-content design wins in server timing, protection and 400V/800V power ramp, and management starts sizing AI as a share of revenue.
What could go wrong
  • The cyclical recovery stalls, and communications and consumer weakness is not large enough to offset a slower computing or industrial market.
  • Gross margin reverts if mix swings back toward consumer and communications, or if utilization improvements at the two Western fabs slip past 2027–2028.
  • Either of the two above-10% distributor customers reduces purchasing or destocks; one customer was ~15.1% of accounts receivable at 3/31/26.
  • The supply-disruption benefit ends and proves to have been the main driver of above-seasonal growth.
  • ElevATE integration slips, or its revenue and margin come in below the stated commitments, after a $250M all-cash price and $325M of convertible notes were already committed.
What’s Next

Looking Ahead

Over the next 12 months the read is the Q3 guide and whatever Q4 framing follows it. Management does not guide beyond one quarter, so each report is a fresh test of a short-cycle, fixed-price book. ElevATE's first reported quarter will be the first check on whether the ~$50M first-year revenue, >20% four-year CAGR and above-corporate margin commitments were real. Internal fab utilization is a 2027–2028 story rather than a 2026 one. Two items management deferred — LEO satellites and humanoid robotics — remain unsized, and AI is still a content estimate rather than a reported revenue line.

Catalysts
  • Q3 2026Q3 results vs guide — Tests the Q3 revenue and 35% gross-margin guide.
  • Q4 2026Q4 momentum read — Management said Q4 momentum 'good so far'; no formal guide.
  • 2027–2028Western fab utilization — Timeline for 'much more improvement' at the two fabs.
Numbers

Financials

Annual Summary

MetricFY2024FY2025TTMYoY
Revenue$1.3B$1.5B$1.6B+13.0%
Gross Margin33.2%31.2%31.7%205bps
EBITDA$188M$179M$220M-4.4%
EBITDA Margin14.3%12.1%13.5%221bps
Net Income$43.9M$66.2M$86.1M+50.8%
Free Cash Flow$46.5M$137M$142M—
Net Cash——$418M—

Net Cash = total debt minus cash and short-term investments at Jun 30, 2026. A company’s own leverage measure can differ.

Key Ratios (Trailing)

Valuation
  • P/E TTM—
  • EV/EBITDA TTM—
  • EV/Revenue TTM—
  • Price/FCF TTM—
Profitability
  • Gross Margin (TTM)31.7%
  • EBITDA Margin (TTM)13.5%
  • Net Margin (TTM)5.3%
  • ROIC4.0%
  • FCF Conversion64.6%
  • SBC / Revenue2.0%
Reference

The Company

Diodes Incorporated is a broad-line semiconductor manufacturer. It sells analog, discrete, power, mixed-signal, standard logic, timing and sensor products into automotive, industrial, computing, consumer electronics and communications markets, and it reports as a single segment, "standard semiconductor products." That breadth is the basis for management's argument that its parts attach at many points inside an AI platform rather than at one socket: clock generators and timing for server platforms, PCIe mux buffers, voltage level shifters, power switches and protection, SiC MOSFETs and diodes for 400V and 800V architectures, and super barrier rectifiers in networking equipment.

The operating model is what management calls a flexible hybrid manufacturing model. Wafer fabrication runs in Shanghai, Wuxi and South Portland, Maine; assembly and test run in Shanghai, Chengdu, Wuxi and Neuhaus am Rennweg, Germany. Management puts internal versus outsourced wafer production at about 50-50 and internal assembly and test at roughly 75%. Sales run mainly through distribution: distributor sales were $254,951K of $405,467K of Q1 2026 net sales, about 63%. Q2 2026 revenue split Asia 79%, Europe 12% and North America 9%. One point to flag: management refers to two Western fabs, in Scotland and South Portland, but the 10-K plant list includes South Portland but not Scotland.

Business Segments

Analog
Power management, standard linear, LED drivers, audio amplifiers, sensors (10-K product listing)
Power management, LDOs, digital isolators, gate drivers, op-amps and Hall-effect sensors.
Growth driver: 400V/800V AI power architectures
Discrete
MOSFETs, SiC MOSFETs, protection devices, diodes, rectifiers, bipolar transistors (10-K product listing)
SiC MOSFETs and diodes plus protection and rectifier devices for automotive and industrial.
Growth driver: SiC and power-rail protection content
Mixed-signal and timing
Clock ICs, redrivers, level shifters, mux/demux, packet switches (10-K product listing)
Server timing and signal-integrity parts, including PCIe 6.0/7.0 mux buffers and clock generators.
Growth driver: Server platform timing design wins

Competitive Landscape

The FY2025 10-K names a set of larger competitors: Infineon Technologies A.G., Epson, Kyocera, Nexperia, NXP Semiconductors N.V., ON Semiconductor, Renesas Electronics and Texas Instruments, plus Vishay Intertechnology. Most of the named set is larger and better-capitalized. The evidence does not show Diodes holding a sole-sourced critical socket anywhere — it shows breadth across many sockets — so management's defensibility argument is breadth and content expansion rather than a monopoly position. Reciprocal references exist as well: SiTime lists Diodes among its primary competitors, Power Integrations lists it among controller-chip vendors, and AOSL lists it among power-discrete competitors.

  • Infineon Technologies A.G.
    Named in the FY2025 10-K list of larger competitors; not otherwise discussed.
  • Texas Instruments
    Named in the FY2025 10-K list of larger competitors; not otherwise discussed.
  • ON Semiconductor
    Named in the FY2025 10-K list of larger competitors; not otherwise discussed.
  • NXP Semiconductors N.V.
    Named in the FY2025 10-K list of larger competitors; not otherwise discussed.
  • Vishay Intertechnology
    Named in the FY2025 10-K list of larger competitors; not otherwise discussed.
Competitor names come from the FY2025 10-K list of larger competitors plus reciprocal references in SiTime, Power Integrations and AOSL filings; the 10-K does not discuss any competitor individually.

Supply Chain

Diodes sits in the middle of the semiconductor chain: it buys wafers and frequency-control material from named suppliers, fabs and assembles most of its own devices, and sells roughly two-thirds of net sales through broad-line distributors. We found no other company's earnings-call transcript that names the company by name.

Supplier
Nuvoton Technology Corporation
Wafers; 10-K states 'We purchase wafers from Nuvoton for use in our production process.'
Supplier
Jiyuan Crystal Photoelectric Frequency Technology Ltd. (JCP)
FCP material; 10-K states JCP is an FCP manufacturing company from which Diodes purchases material.
Supplier
Atlas Magnetics, Co
Fabless wafer design; also a majority-owned VIE.
Supplier
ATX Semiconductor SDN
Testing and packaging synergies; also a 43% joint venture.
Sole Source
Unnamed sole-source supplier
10-K says 'a supplier may be our sole-source supplier'; counterparty not disclosed.
→
Breadth and content expansion
DIOD
Hybrid model: about 50% internal wafer production and roughly 75% internal assembly and test.
→
Customer 1 (unnamed distributor)
$50,839K in Q1 2026
Broad-based distributor; up from $39,035K a year earlier.
Customer 2 (unnamed distributor)
$44,475K in Q1 2026
Broad-based distributor; up from $33,601K a year earlier.
Distributor channel
~63% of Q1 2026 net sales
$254,951K of $405,467K total net sales.
AI platform customers (inferred)
NVIDIA, Dell, HPE, Super Micro, Arista, Coherent, Marvell and Vertiv appear in the supply chain, but management did not name them.

Analysis updated Oct 19, 2026, reviewing Q2 FY2026. Prices delayed. Built with The Buildout’s published methodology. Not investment advice. No positions held. © The Buildout 2026.

More on DIOD: Earnings recap