10
Natural Resources
The mining and metals companies that supply copper, aluminum, lithium, rare earths, and specialty alloys — raw materials that end up in everything from chips and cables to structural steel and battery cells.
How this layer works: Chapter 10, The Materials →
20companies
1sub-roles
Metals & Mining
20 companiesAAAlcoa CorporationAluminum productsALBAlbemarle CorporationLithium and specialty chemicalsATCXAtlas Critical Minerals CorporationCritical minerals producerATIATI Inc.Specialty alloy makerATLXAtlas Lithium CorporationLithium mining developerBHPBHP Group LimitedDiversified mining producerCENXCentury Aluminum CompanyAluminum smeltingCRMLCritical Metals Corp.Critical metals producerCRSCarpenter Technology CorporationSpecialty alloy makerFCXFreeport-McMoRan Inc.Copper and gold miningHBMHudbay Minerals Inc.Copper and zinc miningMPMP Materials Corp.Rare earth magnetsRIORio Tinto GroupDiversified mining producerSBSWSibanye Stillwater LimitedPrecious metals minerSCCOSouthern Copper CorporationCopper mining producerSQMSociedad Química y Minera de Chile S.A.Lithium and iodine producerTECKTeck Resources LimitedCopper and zinc miningUSARUSA Rare Earth IncRare earth magnet makerVALEVale S.A.Iron ore and nickelWWRWestwater Resources, Inc.Graphite and lithium producer
Deep teardownComing soon
Inside the natural resources layer
A full physical decomposition of this layer of the buildout — what goes where, who makes it, and where the bottlenecks are. Links here when the teardown publishes under Learn.