ESAB Corporation earnings recap

Q3 FY2026, reported November 4, 2026 · Beat 5 of last 8 quarters

ESAB Corporation reported Q3 FY2026 revenue of $825M, a beat of 4.2% against consensus, and EPS of $1.30, a miss of 2.3%.

The Buildout is a website built by one person using AI agents, and could have factual errors.

Go to the full ESAB Corporation company page →See the earnings preview →ESAB Corporation is in the Construction layer →
What this means for the buildout

ESAB's read-through to the AI infrastructure buildout is indirect and mostly sits in the inspection and power-generation adjacencies: Eddyfi's nuclear inspection business is described as greater than $80 million in sales growing double digits and management frames a nuclear plant as welded once and inspected and repaired for 60 to 80 years, while EWM's TIG power source is called out as a route into the semiconductor space. The more general signal is that equipment and automation grew high single digits with every installed power source and automated cell described as pulling through recurring consumables, gas control and now inspection sensors — installed-base economics that could compound as equipment and automation (which management describes as double digits as a percent of sales) continue to grow high single digits. Higher freight and electronic component inflation forcing incremental price in Q4 may be a mild cost-side read for other industrial equipment buildouts.

Results vs consensus
EstimateActualvs est
Revenue$787M$825M+4.2%beat
EPS$1.33$1.30-2.3%miss
What was said

ESAB reported $787 million of total core sales, up 14% year over year, with core organic growth of 2.3% as price contributed 2.5 points and volume was roughly flat; acquisitions added 11 points and FX one point. Adjusted EBITDA rose 17% to $156 million at a 19.8% margin, up 40 bps, and core adjusted gross margin reached 40.2%, up 260 bps, helped by acquisitions and EBXai productivity. Core adjusted EPS was $1.30 versus $1.32 a year ago, reflecting the first full quarterly impact of Eddyfi acquisition financing, and adjusted free cash flow was $60 million versus $86 million as cash interest rose to $38 million from $8 million on bond payment timing, though cash from operations before interest grew 23% to $111 million. The Americas grew organically about 1% on high single digit US and Canada growth, offset by high single digit declines in the rest of the region from the Colombia earthquake and Brazilian elections; EMEA and APAC grew 3.4% organically with Europe returning to low single digit growth and APAC up double digits while the Middle East and Africa fell high single digits. By product, equipment and automation were up high single digits, gas control equipment up mid single digits organically, and consumables roughly flat; management said the regions that are growing are growing at nearly 5% in aggregate, with known headwinds dampening growth by approximately 250 bps.

Key metrics
Total core sales
$787M
Up 14% YoY; core organic +2.3% (price +2.5%, volume roughly flat), acquisitions +11 pts, FX +1 pt
Adjusted EBITDA
$156M
Up 17% YoY; margin 19.8%, up 40 bps YoY and up 80 bps since Q1 2026
Adjusted gross margin
40.2%
Up 260 bps YoY; core adjusted gross profit $316M; has expanded sequentially each quarter of 2026 from 38.0% in Q1
Eddyfi cross-sell funnel
~$465M
10-15 opportunities at late stage with samples placed; conversion rate not yet defined, targeted for disclosure in Q4/Q1
FY2026 adjusted EBITDA guidance
$603M-$607M
FY2026 adjusted EBITDA now expected at $603M-$607M (vs. prior guidance); reflects continued inflation, price/cost neutrality and higher freight costs to ensure product and component availability
Management outlook

Management narrowed full-year 2026 core sales to $3.055-$3.060 billion (about 2% organic at the high end, roughly 9.5 points of acquisition contribution and 2 points of FX) and updated adjusted EBITDA guidance to $603-$607 million, citing persistent inflation that keeps the company price/cost neutral plus higher freight costs to ensure product and component availability. Adjusted EPS is now guided to $5.28-$5.33 with approximately 80% adjusted free cash flow conversion. The company says it is holding, and in places accelerating, targeted investment in equipment growth and in strategic AI investments described as critical to 2027 growth and productivity. Management called Q4 the strongest quarter of the year for core growth, margins and cash flow, with October orders up mid single digits and sales close behind, another price action taken in Q4, and South America expected to improve. Balance sheet priorities are organic growth, margin expansion and deleveraging — net leverage fell sequentially to 3.4x, guided to the low threes exiting 2026 and mid twos by year-end 2027, with the next debt maturity not until 2029 and roughly 70% of the capital structure fixed.

From the call

“We expect the fourth quarter to be even stronger with improved organic growth, margins, and cash flow. Setting us up to enter 2027 with strong momentum.”

on Q4 and 2027 momentum

“Yes, we are off to a solid start in October. We sort of had orders grow mid single digits, and then we also had our sales come in very close to that number as well.”

on October order trend

“What I can tell you is there are about 10 to 15 opportunities out there at the late stage where we have provided samples and gone out and met with the customers specifically with the intent of converting the inspection and welding side to Eddyfi or converting a fabrication technology business that is in the.”

on Eddyfi cross-sell funnel

What analysts asked

Of the ~$465 million combined-funnel opportunity, how much do you expect to actually realize, and over what time frame?

Management said Eddyfi grew double digits with strong margins in the quarter and that the funnel is expanding, with roughly 10-15 late-stage opportunities where samples have been placed and customers engaged. It declined to define a conversion rate, calling it too early, and said it would prefer to report progress on the Q4 or Q1 call.

Incremental margins were still about 23% year over year despite the volume step back — what drove that, and could it get worse in Q4?

Management said Q4 should be the best quarter of the year, with growth approaching mid single digits, margin expansion and better cash, and that a similar incremental margin is a reasonable assumption with the team working to beat it. It noted another 50 bps of sequential price in Q3 and additional price actions taken for Q4 to offset inflation that escalated again, and said margin tailwinds arrive once those costs settle.

What has EWM meant to North American equipment growth so far, and how needle-moving should it be to North American growth and mix going forward?

The CFO said EWM was up high single digits in the quarter in North America, following a strong prior quarter. The CEO pointed to low double digit global equipment growth alongside Edge and Warrior, said ESAB is setting up an EWM center of excellence and an additive manufacturing center of excellence in North America, flagged TIG welding into the semiconductor space as a growth avenue, and noted EWM equipment appearing in other companies' FabTech booths, with payback expected in 2027 and beyond as ESAB pursues specification at OEMs in geographies EWM did not previously serve.

Potential supply chain impact
LECOESAB returned to positive organic growth for a second consecutive quarter and offset freight and electronic component inflation with targeted price to stay price/cost neutral, which may indicate similar pricing behavior across welding peers; EWM's push into North American specification and the one-stop workflow pitch could intensify competitive pressure on equipment share.