Howmet Aerospace Inc. earnings recap

Q3 FY2026, reported October 29, 2026 · Beat 7 of last 7 quarters

Howmet Aerospace Inc. reported Q3 FY2026 revenue of $2.70B, a beat of 4.3% against consensus, and EPS of $1.46, a beat of 6.6%.

The Buildout is a website built by one person using AI agents, and could have factual errors.

Go to the full Howmet Aerospace Inc. company page →See the earnings preview →Howmet Aerospace Inc. is in the Power Generation layer →
What this means for the buildout

Howmet's results give a direct read on the power constraint behind AI buildouts: gas turbine revenue accelerated to +45% and customers are now calling 2031 sold out with 2032 likely to follow, which frames turbine blade casting capacity as a gating factor for behind-the-meter and utility-scale generation. The step-up in capex in 2027 and likely 2028 — funded without adding debt and backed by long-term customer contracts — is capacity being added specifically into that bottleneck. On the aerospace side, management's expectation of very robust spares demand tied to time-on-wing issues on new narrow-body engines points to a sustained aftermarket load across engine overhaul capacity.

Results vs consensus
EstimateActualvs est
Revenue$2.59B$2.70B+4.3%beat
EPS$1.37$1.46+6.6%beat
What was said

Revenue of $2.703B rose 29% reported and 25% organically, with all end markets growing: commercial aerospace +32% (27% organic), defense aerospace +10% (3% organic), commercial transportation +28%, gas turbines +45% and other +48% on the Brunner acquisition. Total spares revenue rose 30% to about $570M, roughly 21% of revenue. Engine Products revenue rose 33% to $1.45B with EBITDA up 57% to $567M and margin up 580 bps to 39.1%, absorbing about 520 net new employees; Fastening Systems revenue rose 41% to $630M (10% excluding acquisitions) with margin down 140 bps on CAM dilution; Engineered Structures revenue fell 4% to $295M on the Savannah divestiture but margin expanded 290 bps to 23.7%; Forged Wheels revenue rose 32% with EBITDA up 18% as aluminum pass-through diluted margin. Free cash flow was a quarterly record $562M after $147M of capex, $500M of shares were repurchased in the quarter ($1.1B year-to-date at an average $251), gross debt fell $60M and net debt to EBITDA ended at about 1.3x; the quarterly dividend was raised 17% to $0.14.

Key metrics
Revenue
$2.70B
+29% YoY, +25% organic — strongest quarterly growth rate on record for Howmet; accelerated from 21% organic in Q2 and 19% in Q1
Adjusted EBITDA
$879M
+43% YoY; 32.5% margin, up 310 bps YoY and 40 bps sequentially; 43% incremental flow-through after the CAM dilution
Adjusted EPS
$1.46
+54% YoY; exceeded the high end of guidance; diluted share count down to 399.5M
Gas turbine revenue growth
+45%
+44% within Engine Products; accelerated from 30%+ in both Q1 and Q2, attributed to added output and market share gains
Initial 2027 revenue outlook
~$11.5B
+12% ±0.5% versus the raised 2026 guide of $10.3B; first sighting, refinement due on the February 2027 call
Management outlook

Guidance was raised across the board again: full-year 2026 revenue to $10.3B ±$10M, EBITDA to $3.33B ±$5M, EPS to $5.50 ±$0.01 and free cash flow to $2.0B ±$50M, with Q4 framed at ~$2.75B revenue, $900M EBITDA and $1.50 EPS. Management gave a first look at 2027 at +12% ±0.5%, or roughly $11.5B, with detail to follow on the February 2027 call. The biggest revision was in industrial gas turbines: John Plant said the prior target of doubling IGT sales from a 2025 base over three to five years is now expected in three years, with 2.5x inside five years taking those sales to about $2.5B by the end of the decade, supported by customers describing 2031 as sold out and 2032 likely sold out within one or two quarters. Capex steps higher in 2027 and is likely to remain elevated into 2028, with Plant noting seven new manufacturing plants under way and three more under consideration, all to be funded without adding debt and with year-end leverage expected similar to the 2025 exit level; the board added $5B to the buyback authorization. Defense growth is expected in 2027, but management explicitly excluded any inventory replenishment from the forward look pending a settled budget after the midterms and definitization of missile contracts; the tone was confident but deliberately framed against over-capacitizing.

From the call

“So what I see now is that whereas our prior commentary had been around a doubling of IGT sales from 2025 as the base year within a three-to-five-year period, we now see this as being achieved in three years, so two years right at the front end of that. And maybe it will rise to 2.5 times inside five years, which would take those sales to about $2.5 billion by the end of the decade.”

on IGT growth target pulled forward

“More recently, we have seen major gas turbine customers state that 2031 is now also sold out, and indeed 2032 will likely be sold out in the next one or two quarters.”

on Gas turbine book visibility

“The most important growth vector as a percent of sales of the one sector of defense sales is that of missile parts. We are being asked to increase production significantly, albeit final agreements have yet to be concluded.”

on Defense / missile parts demand

What analysts asked

Blades and vanes remain a bottleneck and OEMs are vertically integrating — Pratt's Asheville investment and GE's acquisition of CPP. How does that reshape competitive dynamics in blades and vanes, what does it mean for Howmet's market share, and how do you think about pricing power?

Plant cited long-standing relationships with GE, Safran, Pratt & Whitney and Rolls-Royce and said Howmet is poised to further increase capacity for GE, which takes about two years to install with a multi-year runway after. As a sizing exercise, he said the expected increase in IGT spares revenue in a single year such as 2031 would exceed the total sales value of the first blade of Howmet's largest narrow-body engine blade to any customer. He characterized CPP as strong in structural castings — arguably the industry's main pain point — and said Howmet is already considering another plant build-out in that area, possibly affecting scale and location.

Beyond the CPP discussion on aero, how do you think about the role of potential insourcing at SpaceX and what that might mean for the IGT market?

Plant described SpaceX's Colossus data centers and its roughly 1-gigawatt power position, including 69 mobile gas turbines from the APR acquisition that must be relocated by mid-next year and replaced, with about 33 Titan turbines and 10 ProEnergy PE6000 units being installed — turbines whose blades Howmet supplies for Titan and the LM6000 aeroderivative series. He noted SpaceX's stated ambition to reach up to 20 gigawatts of power for 2027 and that blade availability, not turbine assembly, is the industry constraint, with one Asian turbine maker reportedly agreeing to supply bladeless turbines. He said Howmet expects the broader power scramble — including older E-series machines and repurposed aero engines — to persist until new turbine capacity arrives late this decade, and that current investment levels are probably not enough.

How do you get comfortable committing capital up front when the demand you're building for may be in 2030 and beyond?

Plant said the analysis spans data center construction and permitting, the space-datacenter question, future chip generations and their cooling and power needs, and the growth trajectories of the frontier AI labs, then layers on adjacent sources of demand such as LNG liquefaction and compression, pipelines and terminals, and European electricity and air-conditioning load growth where turbines are the realistic near-decade solution. He said the company wants customer contracts with volume corridors to underpin capacity, and that the picture has been emerging over the last couple of years. He added the board walked through the same risk case roughly ten months ago and coalesced on the investment; he noted capacity for future turbine generations, blade cooling sophistication and size are all part of the calculus.

Potential supply chain impact
ATIATI's High-Performance Materials & Components segment covers titanium and titanium-based alloys and precision forgings; Howmet's plan to consider a further structural castings plant, and the 8% underlying growth in Engineered Structures excluding the Savannah divestiture, could signal continued overlap in titanium and forging capacity, though no direct competitive commentary was offered on the call.
SWKHowmet previously completed the sale of its Aerospace Fasteners business to SWK; with Fastening Systems now shaped by CAM and Brunner, this quarter's 41% reported growth (10% excluding acquisitions) and CAM-related margin dilution may have limited read-across to SWK beyond that disclosed transaction.