Titan America S.A. earnings recap

Q3 FY2026, reported November 4, 2026 · Beat 0 of last 7 quarters

Titan America S.A. reported Q3 FY2026 revenue of $462M, a miss of 3.5% against consensus, and EPS of $0.22, a miss of 39.7%.

The Buildout is a website built by one person using AI agents, and could have factual errors.

Go to the full Titan America S.A. company page →See the earnings preview →Titan America S.A. is in the Construction layer →
What this means for the buildout

Titan America is a physical-inputs read on the buildout: management listed AI economy and data center investment among the nonresidential trends still supporting demand, even as the residential side of the same Florida and Mid-Atlantic markets deteriorated. The Roanoke outage and the inability to backfill with imports illustrate how concentrated single-plant cement supply is, a dynamic that could reinforce pricing leverage for producers with domestic capacity and import flexibility as data center and infrastructure work continues.

Results vs consensus
EstimateActualvs est
Revenue$478M$462M-3.5%miss
EPS$0.36$0.22-39.7%miss
What was said

Revenue rose 5.7% to $462 million with Keystone adding roughly $30 million, while adjusted EBITDA fell 18.6% to $95 million and margin compressed to 20.6% from 26.7% on higher material and energy costs, Florida labor constraints, the Roanoke outage and acquisition mix. Mid-Atlantic external revenue grew 22.5% to $213 million, but segment adjusted EBITDA was flat at $37 million (17.2% margin vs 21.1%) after the unplanned Roanoke outage cut about 60,000 tons of cement production and import supply disruptions prevented the usual offset. Florida external revenue declined to $249 million from $263 million and segment adjusted EBITDA fell to $61 million from $81 million, a 24.4% margin versus 30.8%, driven by weaker residential demand, lower cement and concrete block pricing, job-site labor shortages and record September rainfall in Southeast Florida. Like-for-like cement volumes fell 6.2% (reported +9.6% with Keystone), ready-mix volumes fell 5.2%, aggregates rose 1.2%, fly ash 2% and concrete block 0.7%; ready-mix pricing rose 5.4% and fly ash 6.6% while cement pricing fell 1.7% and block 3%. Nine-month operating cash flow was $220 million versus $215 million, free cash flow fell to $67 million from $94 million on higher growth investment, and leverage was 1.43x trailing adjusted EBITDA versus 0.64x at December 31, 2025 after the Keystone acquisition and new term loan.

Key metrics
Revenue
$462M
Up 5.7% YoY vs $437M; Keystone contributed approximately $30M of the increase
Adjusted EBITDA
$95M
Down 18.6% YoY vs $117M; net income $40M and EPS $0.22 vs $0.31
Adjusted EBITDA margin
20.6%
Down from 26.7% in Q3 2025; year-to-date 20.9% vs 23.5%
Like-for-like cement volumes
-6.2%
Reported cement volumes +9.6% including Keystone; Roanoke outage cut ~60,000 tons of production and a similar amount of sales
Project Cornerstone benefits
~$20M
Delivered in 2026 to date; targeting more than $50M annual run-rate by 2029
Management outlook

Management lowered its full-year 2026 outlook, now expecting mid-single-digit revenue growth including Keystone but adjusted EBITDA margin down approximately 250 to 300 basis points year-over-year, citing interest and mortgage rate levels, inflationary pressures and job-site labor challenges. Bill Zarkalis characterized the residential weakness as unlikely to reverse near term absent a reduction in mortgage rates, potentially pushing recovery into the second half of 2027, while infrastructure investment, nonresidential activity tied to the AI economy and data centers, manufacturing reshoring, healthcare and urbanization are expected to stay positive. The company has announced January 1 price increases — $12 per ton of cement, $15 per cubic yard of ready-mix, $3 per metric ton of aggregates and $0.10 per block — and expects some price-versus-cost catch-up in 2027 after costs outran pricing this year. Project Cornerstone has already produced roughly $20 million of benefits in 2026 against a target of more than $50 million annual run-rate by 2029, and Keystone is targeted at no less than $30 million of annual run-rate synergies by 2029, though its margins remain below normal until a planned outage allows reliability capex. Larry Wilt flagged annual maintenance outages at Roanoke and Keystone in Q1 2027, with Keystone's Pennsylvania winter intensity a swing factor, and no significant planned outages expected in Q4.

From the call

“While infrastructure demand remained resilient across our markets, deteriorating residential activity continued to weigh on our performance, particularly in Florida.”

on Florida demand mix

“We have already announced price increases as of January 1. We have announced $12 per ton of cement. $15 per cubic yard for our ready-mix concrete, $3 per metric ton for our prime aggregates and $0.10 price increase per block.”

on 2027 pricing actions

“The project has already delivered approximately $20 million in benefits during 2026, and we are targeting more than $50 million in annual run rate benefits by 2029.”

on Project Cornerstone

What analysts asked

Can you break down the roughly $20 million year-over-year Florida hit between labor shortages, weather and weaker residential demand, and what are you seeing in Florida from September into October?

Zarkalis cited three drivers: mortgage rates climbing from about 6.4% in early June to 7.4%, intensifying labor shortages as monthly arrests rose from roughly 25,000 to 50,000, and record September rainfall in Southeast Florida — with infrastructure still solid and parts of private nonresidential strong. Wilt added that the revenue decline flows to the bottom line, partially offset by avoided variable costs, with higher energy and raw material costs and the volume effect explaining the EBITDA gap.

With only a couple of months left in the year, what are the puts and takes for 2027 — cost savings flow-through, price versus cost, and the one-time items from this year?

Zarkalis pointed to continued infrastructure investment and bipartisan support for Build US 250, post-election pressure for housing affordability, and positive nonresidential trends including AI data centers, manufacturing reshoring, healthcare and urbanization, while housing headwinds likely persist until mortgage rates ease, possibly into the second half of 2027. He noted $20 million of savings already delivered with more to come over three years toward a $50 million-plus exit rate, and expected price/cost catch-up in 2027 supported by January 1 increases across all areas including the Northeast.

Can you size the inflation impact in Q3 versus the first half, given you have historically passed through freight surcharges and buy energy forward — and how do the outages look in Q4 and Q1?

Zarkalis said energy costs accelerated in Q3, with diesel around $6.29-$6.30 versus roughly $2 less a year earlier and larger natural gas increases in Florida than the Mid-Atlantic, partly mitigated by higher alternative fuel use, plus embedded energy in purchased raw materials and third-party aggregates. Wilt said Q4 has no significant planned outages and is comparable year-over-year, while Q1 2027 includes annual outages at Roanoke and Keystone, with Keystone's Pennsylvania winter intensity a difference versus Virginia and the Carolinas.

Potential supply chain impact
MLMMartin Marietta operates Titan America's Castle Hayne, North Carolina mining resources per SEC filings; TTAM's softer Florida cement and concrete block pricing alongside modest 1.2% aggregates growth and resilient infrastructure demand may point to a similarly mixed Southeast and Mid-Atlantic construction materials backdrop for MLM's regional aggregates exposure.