Rankings

163 companies · 7 cuts · Refreshed daily

163 companies

Ranked by Structural Score (v3.2): Supply × 0.35 + Demand × 0.30 + Moat × 0.35. The primary ranking for long-horizon conviction.
#CompanyStructuralSupplyDemandMoatValuationMkt CapType
1
TSMTaiwan Semiconductor (TSMC)
1059/109/1010/10COMPELLING$2.21TCONSENSUS
2
ASMLASML Holding
999/108/1010/10ATTRACTIVE$674.1BCONSENSUS
3
NVDANVIDIA
936/109/1010/10COMPELLING$5.05TCONSENSUS
4
000660.KSSK Hynix (Korea)
918/108/109/10COMPELLING$1.08TESTABLISHED
5
AMATApplied Materials
899/108/108/10ATTRACTIVE$390.8BESTABLISHED
6
KLACKLA Corporation
899/108/108/10FAIR$275.4BESTABLISHED
7
EQIXEquinix
887/108/1010/10FAIR$104.8BESTABLISHED
8
BESIBE Semiconductor
888/108/108/10FAIR$22.6BEMERGING
9
LITELumentum Holdings
888/109/107/10FAIR$69.7BESTABLISHED
10
AVGOBroadcom
876/109/109/10FAIR$1.88TESTABLISHED
11
CEGConstellation Energy
878/108/1010/10ATTRACTIVE$90.5BEMERGING
12
COHRCoherent Corp
868/109/108/10ATTRACTIVE$63.7BEMERGING
13
AMKRAmkor Technology
858/108/107/10COMPELLING$16.9BEMERGING
14
LRCXLam Research
849/108/108/10FAIR$405.7BESTABLISHED
15
HWMHowmet Aerospace
848/108/109/10FAIR$98.6BCONSENSUS
16
RMBSRambus
838/108/107/10ATTRACTIVE$16.4BESTABLISHED
17
AEISAdvanced Energy Industries
839/108/107/10ATTRACTIVE$11.6BESTABLISHED
18
PLDPrologis
837/108/107/10ATTRACTIVE$133.1BEMERGING
19
MUMicron Technology
828/108/107/10COMPELLING$1.07TESTABLISHED
20
TERTeradyne
819/108/107/10PREMIUM$58.7BESTABLISHED
21
NOVTNovanta
819/108/107/10FAIR$5.9BEMERGING
22
BWXTBWX Technologies
808/108/108/10ATTRACTIVE$17.2BESTABLISHED
23
AEHRAehr Test Systems
808/108/107/10PREMIUM$3.0BEMERGING
24
TOELYTokyo Electron (OTC)
809/108/107/10COMPELLING$166.0BESTABLISHED
25
GEVGE Vernova
808/108/108/10FAIR$250.9BESTABLISHED
26
KEYSKeysight Technologies
809/108/107/10ATTRACTIVE$56.8BESTABLISHED
27
ETNEaton
808/107/108/10ATTRACTIVE$156.5BCONSENSUS
28
SITMSiTime Corp
798/107/107/10FAIR$17.5BEMERGING
29
VSTVistra Corp
798/108/107/10COMPELLING$49.5BESTABLISHED
30
AEPAmerican Electric Power
798/108/108/10ATTRACTIVE$69.0BESTABLISHED
31
FORMFormFactor
788/108/106/10FAIR$9.7BEMERGING
32
MKSIMKS Instruments
789/108/106/10COMPELLING$21.1BESTABLISHED
33
TLNTalen Energy
788/108/107/10COMPELLING$16.7BESTABLISHED
34
VRTVertiv Holdings
786/108/108/10FAIR$115.5BESTABLISHED
35
CDNSCadence Design Systems
775/107/1010/10ATTRACTIVE$108.7BCONSENSUS
36
FNFabrinet
778/109/106/10COMPELLING$22.3BESTABLISHED
37
005930.KSSamsung Electronics (Korea)
778/108/107/10ATTRACTIVE$1.46TESTABLISHED
38
MSFTMicrosoft
773/1010/109/10ATTRACTIVE$3.06TCONSENSUS
39
EMEEMCOR Group
777/108/108/10ATTRACTIVE$36.7BESTABLISHED
40
DLRDigital Realty
777/108/108/10ATTRACTIVE$64.0BESTABLISHED
41
ARMARM Holdings
766/109/108/10PREMIUM$368.6BESTABLISHED
42
AAOIApplied Optoelectronics
768/109/106/10ATTRACTIVE$15.8BSPECULATIVE
43
LEUCentrus Energy
768/108/107/10FAIR$3.1BSPECULATIVE
44
PWRQuanta Services
767/108/106/10FAIR$104.1BESTABLISHED
45
AMZNAmazon (AWS)
763/1010/1010/10ATTRACTIVE$2.64TCONSENSUS
46
GOOGLAlphabet (Google Cloud)
763/1010/1010/10ATTRACTIVE$4.39TCONSENSUS
47
MRVLMarvell Technology
756/109/107/10ATTRACTIVE$252.7BEMERGING
48
IRENIris Energy
756/108/106/10COMPELLING$21.1BEMERGING
49
METAMeta Platforms
753/1010/108/10COMPELLING$1.49TCONSENSUS
50
CCJCameco
748/108/107/10FAIR$45.9BESTABLISHED
51
KMIKinder Morgan
746/106/1010/10COMPELLING$69.6BESTABLISHED
52
QCOMQualcomm
746/109/107/10COMPELLING$229.5BESTABLISHED
53
HUBBHubbell
748/107/107/10ATTRACTIVE$25.6BESTABLISHED
54
ONTOOnto Innovation
739/108/106/10FAIR$13.4BEMERGING
55
CIENCiena Corporation
738/109/106/10ATTRACTIVE$66.1BESTABLISHED
56
ASXASE Technology
738/108/106/10COMPELLING$77.9BESTABLISHED
57
NEENextEra Energy
738/108/106/10ATTRACTIVE$175.2BESTABLISHED
58
MODModine Manufacturing
736/108/107/10FAIR$14.5BEMERGING
59
ICHRIchor Holdings
739/108/105/10ATTRACTIVE$2.3BEMERGING
60
UCTTUltra Clean Holdings
739/108/105/10ATTRACTIVE$3.8BEMERGING
61
SNDKSanDisk
738/108/106/10PREMIUM$243.2BESTABLISHED
62
INTCIntel (Foundry Services)
739/109/104/10PREMIUM$554.2BSPECULATIVE
63
AMDAdvanced Micro Devices
736/109/107/10COMPELLING$799.5BCONSENSUS
64
AXTIAXT Inc
738/109/105/10PREMIUM$4.2BSPECULATIVE
65
ABBABB Ltd
728/107/107/10ATTRACTIVE$187.6BCONSENSUS
66
POWLPowell Industries
728/107/106/10FAIR$10.7BEMERGING
67
SNPSSynopsys
725/107/109/10COMPELLING$90.7BCONSENSUS
68
ALABAstera Labs
726/109/106/10ATTRACTIVE$59.4BEMERGING
69
GLWCorning
715/107/108/10FAIR$161.4BESTABLISHED
70
ACLSAxcelis Technologies
719/108/106/10ATTRACTIVE$4.8BEMERGING
71
ANETArista Networks
715/107/108/10ATTRACTIVE$196.9BESTABLISHED
72
GNRCGenerac
718/108/105/10ATTRACTIVE$15.7BEMERGING
73
APHAmphenol
705/107/107/10ATTRACTIVE$176.7BCONSENSUS
74
FIXComfort Systems USA
707/108/106/10FAIR$65.2BESTABLISHED
75
IESCIES Holdings
707/108/106/10FAIR$14.6BEMERGING
76
TTTrane Technologies
706/108/107/10ATTRACTIVE$101.4BESTABLISHED
77
IRMIron Mountain
707/108/106/10ATTRACTIVE$36.7BESTABLISHED
78
ECLEcolab
707/108/106/10ATTRACTIVE$72.4BESTABLISHED
79
COHUCohu
708/108/105/10ATTRACTIVE$2.5BEMERGING
80
DYDycom Industries
687/108/105/10COMPELLING$13.8BESTABLISHED
81
CRDOCredo Technology
686/109/105/10FAIR$41.0BEMERGING
82
AMTAmerican Tower
687/108/107/10COMPELLING$88.1BESTABLISHED
83
CMICummins
688/108/106/10COMPELLING$92.8BCONSENSUS
84
NVTnVent Electric
676/108/106/10ATTRACTIVE$26.5BEMERGING
85
SMTCSemtech
678/109/105/10COMPELLING$14.8BEMERGING
86
MTSIMACOM Technology
678/109/105/10ATTRACTIVE$27.6BEMERGING
87
WMBWilliams Companies
676/106/108/10ATTRACTIVE$87.6BESTABLISHED
88
CAMTCamtek
678/108/105/10ATTRACTIVE$7.7BEMERGING
89
TELTE Connectivity
675/107/108/10ATTRACTIVE$60.0BCONSENSUS
90
CRWVCoreWeave (IPO Mar 2025)
663/1010/106/10COMPELLING$55.9BEMERGING
91
BEBloom Energy
666/107/106/10FAIR$72.1BEMERGING
92
SHECYShin-Etsu Chemical (OTC)
666/105/108/10COMPELLING$81.3BESTABLISHED
93
STRLSterling Infrastructure
667/108/105/10ATTRACTIVE$27.4BEMERGING
94
MYRGMYR Group
667/108/105/10ATTRACTIVE$6.8BEMERGING
95
CARRCarrier Global
666/108/106/10COMPELLING$55.9BESTABLISHED
96
ASYSAmtech Systems
668/108/104/10COMPELLING$286MSPECULATIVE
97
THRThermon Group
667/108/105/10ATTRACTIVE$2.0BEMERGING
98
BWBabcock & Wilcox
668/108/104/10FAIR$1.8BSPECULATIVE
99
MPWRMonolithic Power Systems
655/106/107/10FAIR$76.6BCONSENSUS
100
WWDWoodward
658/107/106/10PREMIUM$21.4BESTABLISHED
101
ORCLOracle
653/1010/107/10FAIR$609.1BESTABLISHED
102
HUTHut 8
656/108/105/10FAIR$13.5BEMERGING
103
CCChemours
657/108/105/10ATTRACTIVE$3.1BEMERGING
104
CORZCore Scientific
656/108/105/10ATTRACTIVE$8.6BEMERGING
105
GFSGlobalFoundries
649/109/105/10ATTRACTIVE$42.4BEMERGING
106
KLICKulicke & Soffa
648/108/105/10ATTRACTIVE$5.4BEMERGING
107
ENTGEntegris
646/105/108/10PREMIUM$20.2BESTABLISHED
108
SMRNuScale Power
648/108/105/10PREMIUM$3.2BSPECULATIVE
109
TXNTexas Instruments
645/106/108/10ATTRACTIVE$264.7BCONSENSUS
110
VICRVicor Corp
645/106/107/10ATTRACTIVE$12.4BEMERGING
111
CSCOCisco Systems
635/107/107/10COMPELLING$489.3BCONSENSUS
112
OKLOOklo
638/108/104/10ATTRACTIVE$10.3BSPECULATIVE
113
JCIJohnson Controls
636/108/105/10ATTRACTIVE$87.9BCONSENSUS
114
PSTGPure Storage
625/106/107/10ATTRACTIVE$28.5BEMERGING
115
APLDApplied Digital
616/108/104/10ATTRACTIVE$11.7BEMERGING
116
LINLinde
616/105/107/10ATTRACTIVE$232.2BCONSENSUS
117
CLSCelestica
603/108/106/10FAIR$44.4BESTABLISHED
118
HONHoneywell
608/107/103/10COMPELLING$134.2BESTABLISHED
119
CBRECBRE Group
605/107/106/10ATTRACTIVE$38.6BESTABLISHED
120
NNBRNN Inc
597/108/103/10ATTRACTIVE$153MSPECULATIVE
121
DELLDell Technologies
593/108/106/10ATTRACTIVE$266.0BESTABLISHED
122
APDAir Products
596/105/107/10FAIR$61.6BESTABLISHED
123
ADIAnalog Devices
585/106/107/10ATTRACTIVE$196.7BESTABLISHED
124
UMCUnited Microelectronics (UMC)
579/109/103/10COMPELLING$49.9BCONSENSUS
125
QQnity Electronics
576/105/106/10COMPELLING$30.2BESTABLISHED
126
WULFTeraWulf
576/108/104/10FAIR$12.8BEMERGING
127
STEMStem Inc
566/107/104/10COMPELLING$70MSPECULATIVE
128
AZZAZZ Inc
568/107/102/10COMPELLING$4.1BEMERGING
129
CCICrown Castle
567/108/102/10ATTRACTIVE$40.1BEMERGING
130
FLNCFluence Energy
556/107/105/10ATTRACTIVE$4.4BEMERGING
131
ROGRogers Corporation
555/107/105/10FAIR$2.5BEMERGING
132
NTAPNetApp
555/106/106/10COMPELLING$33.7BCONSENSUS
133
PLUGPlug Power
558/108/103/10ATTRACTIVE$3.7BSPECULATIVE
134
JJacobs Solutions
555/107/104/10FAIR$14.2BEMERGING
135
POETPOET Technologies
558/109/103/10FAIR$1.6BSPECULATIVE
136
IRIngersoll Rand
556/108/104/10COMPELLING$28.4BESTABLISHED
137
MTRNMaterion
546/105/105/10ATTRACTIVE$4.7BEMERGING
138
STXSeagate Technology
535/106/105/10FAIR$196.6BESTABLISHED
139
LFUSLittelfuse
535/106/105/10COMPELLING$11.7BESTABLISHED
140
ACMAECOM
535/107/104/10COMPELLING$9.1BEMERGING
141
JLLJones Lang LaSalle
535/107/104/10COMPELLING$13.7BCONSENSUS
142
PRIMPrimoris Services
535/107/104/10ATTRACTIVE$6.7BEMERGING
143
BDCBelden
535/107/104/10COMPELLING$4.2BEMERGING
144
PLABPhotronics
526/105/105/10ATTRACTIVE$1.8BEMERGING
145
SANMSanmina Corporation
523/108/105/10FAIR$13.5BEMERGING
146
ONON Semiconductor
515/106/105/10COMPELLING$47.4BEMERGING
147
FLRFluor Corporation
505/107/104/10ATTRACTIVE$6.9BEMERGING
148
HPEHewlett Packard Enterprise
503/108/105/10ATTRACTIVE$66.0BEMERGING
149
WDCWestern Digital
505/106/104/10ATTRACTIVE$181.6BESTABLISHED
150
MTZMasTec
495/107/103/10FAIR$28.6BEMERGING
151
LTBRLightbridge
498/108/102/10PREMIUM$246MSPECULATIVE
152
IBMIBM
493/108/104/10FAIR$263.9BEMERGING
153
EOSEEos Energy Enterprises
486/107/104/10ATTRACTIVE$1.7BSPECULATIVE
154
NUAINew Era Energy & Digital
476/108/103/10ATTRACTIVE$281MSPECULATIVE
155
ALGMAllegro MicroSystems
465/106/104/10FAIR$9.0BEMERGING
156
SMCISuper Micro Computer
463/108/103/10COMPELLING$26.5BSPECULATIVE
157
WOLFWolfspeed
465/106/105/10COMPELLING$2.7BSPECULATIVE
158
VSHVishay Intertechnology
455/107/103/10ATTRACTIVE$7.8BCONSENSUS
159
CEVACEVA Inc
455/107/104/10ATTRACTIVE$1.3BSPECULATIVE
160
FCELFuelCell Energy
446/107/103/10ATTRACTIVE$821MSPECULATIVE
161
BELFABel Fuse
435/105/104/10ATTRACTIVE$3.1BEMERGING
162
DOCNDigitalOcean
433/1010/103/10FAIR$17.7BEMERGING
163
NVTSNavitas Semiconductor
395/106/103/10FAIR$5.9BSPECULATIVE

How These Rankings Work

Seven lenses on the AI infrastructure universe — from structural conviction to demand momentum to value, catalysts, AI purity, and the full scorecard.

Structural Score

v3.2 weighted blend: Supply Constraint × 0.35 + Demand Pull × 0.30 + Moat × 0.35. Moat is the only per-company variable — it differentiates within layers.

Demand Wave Score

Demand Pull × Moat. Surfaces companies riding the AI spending wave — hyperscalers, EDA tools, and cooling specialists the blended score underweights.

Regime Badges

Chokepoint = high supply × moat (irreplaceable). Demand Wave = high demand × moat (capital magnet). Convergence = strong on both axes (rarest, most valuable).

Best Value

Structural ≥ 55 AND Valuation = Compelling or Attractive. Strong chain positions the market has underpriced.

Speculative

Market cap < $10B + thin coverage or provisional valuation + Structural ≥ 45. Unloved names in structurally real layers.

Valuation

Compelling / Attractive / Fair / Premium — relative to layer peers using Forward P/E, FCF Yield, and Revenue Growth. Moves with price.

Pure AI Plays

Ranked by AI revenue exposure %. Pure Play (>60%) companies where AI IS the business. Helps isolate the purest bets on AI infrastructure growth.

Top Catalysts

Companies with the most high-impact open catalysts — confirmed, signaled, or expected events extracted from earnings transcripts and filings.

Full Scorecard

Every metric in one table: Structural, Supply, Demand, Moat, Valuation, Forward P/E, Growth, AI Exposure, Play Type, and Market Cap.