Tuesday, October 20, 2026
3 companies we cover report on this day. What to watch, the numbers so far, and who else in the supply chain has already reported.
The Buildout is a website built by one person using AI agents, and could have factual errors. Not investment advice.
Vicor VICR
Vicor designs modular power components and systems for Vertical Power Delivery to high-current AI processors and licenses its power-system intellectual property to OEMs and hyperscalers.
Where the evidence pointsThe estimate sits 30.8% above last quarter, and the read hinges on Q3 revenue versus the raised guidance and licensing contribution.
Valmont Industries VMI
Valmont makes steel utility structures, poles, coatings and irrigation equipment; its utility and coatings products supply grid and construction work driven by the AI data-center buildout.
Where the evidence pointsThe estimates put revenue roughly flat and EPS below last quarter; second-half infrastructure margins and utility growth decide the read.
3M MMM
3M makes optical connectors, data-center power products and semiconductor materials, a small part of a broad industrial portfolio tied to AI infrastructure.
Where the evidence pointsEPS beats have been consistent, the revenue estimate is 1.7% above last quarter, and EBO capacity and data-center orders are the swing factor.