Emerson Electric Co. earnings recap
Q4 FY2026, reported November 4, 2026 · Beat 6 of last 6 quarters
Emerson Electric Co. reported Q4 FY2026 revenue of $5.20B, a beat of 1.8% against consensus, and EPS of $1.86, a beat of 0.5%.
The Buildout is a website built by one person using AI agents, and could have factual errors.
The quarter's signal is that the capital cycle feeding AI-adjacent infrastructure is broadening beyond data-center shells into the power, LNG and semiconductor capacity that automation vendors instrument and control. Power control-system orders up nearly 45% on greenfield and a project funnel that grew 17% to $13B with 75% of Q4 funnel wins in growth verticals suggest multi-year, longer-dated backlog conversion rather than a spot MRO bump. The offset is that the near-term revenue base still depends on a U.S./Middle East project mix, with Europe and China explicitly not assumed to recover.
| Estimate | Actual | vs est | ||
|---|---|---|---|---|
| Revenue | $5.11B | $5.20B | +1.8% | beat |
| EPS | $1.85 | $1.86 | +0.5% | beat |
Fourth-quarter underlying sales rose 7% with volume contributing four points, adjusted segment EBITDA margin expanded 160 bps to 29.1% and adjusted EPS rose 15% to $1.86. Underlying orders grew 14%, led by Software & Systems +18% (Ovation +26%, Test & Measurement +14% including semiconductor +59%) and Intelligent Devices +13%, lifting backlog to $8.2B, up 11%. Growth verticals rose 25% in the quarter and 21% for the year, led by LNG +68%, semiconductor +43% and power +24%, while MRO was 63% of sales and projects ticked up to 37%. For the full year, underlying sales grew 4%, adjusted EPS rose 10% to $6.59, free cash flow was $3.5B (up 9%) and software ACV grew 10.1% to $1.7B; the project funnel rose $600M to $13B, up 17% year over year. Notable Q4 awards included a Qatar downstream petrochemical complex, LNG Canada Phase 2 and a 10-year DeltaV MES subscription agreement with a global life sciences contract manufacturer.
Management guided fiscal 2027 to roughly 5% underlying sales growth, adjusted segment EBITDA margin of 29% (up 80 bps), adjusted EPS of $7.25 (up 10%) and free cash flow of $3.8B-$3.9B, framing the year as landing 'right in line with our 2028 targets.' They plan to return about $3.8B to shareholders — $2.5B of buybacks (with roughly $1.5B pulled into Q1 to preserve flexibility for bolt-on deals) and $1.3B of dividends, including a 7%, or $0.16, per-share increase that marks the 71st consecutive annual raise. The growth engine is the growth verticals — now 27% of sales — guided to low double digits on electrification, energy security and nearshoring, with the U.S., India, Southeast Asia and the Middle East leading; the Middle East is modeled up high single digits assuming the conflict does not escalate. Europe is expected to improve only modestly to low single digit growth and China is not assumed to recover, with about 40% of China sales tied to an over-capacitized petrochemical and refining market. Pricing is planned at 2% versus roughly 3% in 2026 (a point of which was tariff-related), with price-cost expected to stay green enough to underwrite ~40% incrementals at the midpoint. First quarter is guided to ~5% underlying sales growth, 28% segment margin and EPS of $1.58-$1.62, with Q1 pacing slower than the balance of the year, consistent with last year.
“Underlying orders grew 14%. With broad based demand across all business groups. Demand was most pronounced in software and systems, up 18% and intelligent devices, up 13%. All regions experienced growth. Led by North America, up 15%, and The Middle East, up 42%.”
on Order acceleration
“We are not planning for a recovery in China due to the persistent headwinds in both chemical and refining.”
on China outlook
“Overall, our power business, about $2.5 billion grew at 25%. Our control systems portion of the power business, which is primarily driven by greenfield, was up close to 45%. So we are seeing strong momentum. And no slowdown in power, we expect to repeat that going into next year.”
on Power / greenfield demand
With orders up 14% and backlog up 11%, and Q1 guided at roughly 5% organic, why wouldn't growth accelerate after Q1 — is the guide conservative on Europe, or is there cushion built in?
Lal said order pacing accelerated over the last two quarters, particularly growth-vertical project orders (projects were 37% of Q4 sales) and backlog grew, which supports the year. But Europe was negative in 2026 and China remains a concern, and that combination drove the shape of the guide.
Are power orders now including behind-the-meter and new generation rather than just brownfield modernization, and how much of Q4 software growth came from renewals — plus where does the renewal lumpiness sit in the ~10% ACV growth plan for 2027?
Ram said power is now broad-based, with greenfield activity very strong in Q4 and expected to continue: the ~$2.5B power business grew 25% and the control-systems portion, primarily greenfield-driven, rose close to 45%. Mike said the software renewal dynamic was a ~70 bps headwind in 2026, unwinds a bit more than half in 2027 — roughly a 35 bps tailwind — and half in 2028.
With M&A constrained for a couple of years, should the large buyback be read as a sign that M&A remains very limited for some time?
Lal confirmed the read: the capital allocation commitment made at the 2025 investor conference to return cash to shareholders over the three-year cycle is maintained. There is ample firepower for sub-$1B bolt-ons, which will continue to be evaluated, but large-scale M&A of the kind done in the past is not in this plan.