Eaton Corporation plc earnings recap

Q3 FY2026, reported November 3, 2026 · Beat 7 of last 7 quarters

Eaton Corporation plc reported Q3 FY2026 revenue of $8.95B, a beat of 4.9% against consensus, and EPS of $3.68, a beat of 4.0%.

The Buildout is a website built by one person using AI agents, and could have factual errors.

Go to the full Eaton Corporation plc company page →See the earnings preview →Eaton Corporation plc is in the Power Systems layer →
What this means for the buildout

Eaton sits directly in the power path of the AI buildout, and this quarter showed the supply side responding: record electrical backlog above $20 billion, electrical orders up 43% and data center orders up 101% signal demand still running ahead of convertibility, while 18 of 25 completed capacity projects and a 29.8% Americas margin suggest the transformer, switchgear and UPS constraint is easing at the margin. Management's 366 GW announced data center project pipeline against roughly 50 GW installed implies a multi-year requirement for grid-to-chip electrical equipment, and Boyd's near-triple-digit growth points to liquid cooling becoming a second, thermally-driven leg of that buildout.

Results vs consensus
EstimateActualvs est
Revenue$8.53B$8.95B+4.9%beat
EPS$3.54$3.68+4.0%beat
What was said

Eaton reported record third-quarter revenue of $8.9 billion, up 28% with 8 points of acquisition contribution and 19% organic growth, and record adjusted EPS of $3.68, $0.12 above the high end of guidance, with a $0.32 segment profit beat and incrementals of 26% versus 19% last quarter. Electrical Americas grew organically 22% on data center revenue up 54% plus strength in machine OEM and commercial and institutional, with segment margin of 29.8% and record orders above $5 billion. Electrical Global total growth was 58%, including 27% organic and 31 points from Boyd, with APAC up nearly 50%, GIS and EMEA each up around 20%, and segment margin of 21.1%, up 200 bps year over year. Aerospace grew organically 6% with margin of 24.9% (up more than 200 bps sequentially but down 100 bps year over year on mix) and a record $5.6 billion backlog, while Mobility returned to growth with 9% organic growth and 17.2% margin, its highest since 2018. Combined electrical backlog reached a record above $20 billion, up 46%, and mega project announcements were up 85% year to date with the negotiations pipeline up about 55%.

Key metrics
Organic growth
19%
Total revenue up 28% to a record $8.9B, including 8 points from acquisitions; excluding Mobility, organic growth would have been 21%
Adjusted EPS
$3.68
All-time record, up 20% year over year and $0.12 above the high end of guidance; segment profit beat guidance by $0.32
Electrical Americas segment margin
29.8%
Up 230 bps sequentially from Q2 and more than 400 bps since Q1 as new capacity converted to output
Electrical backlog
>$20B
Record, up 46% year over year; rolling 12-month electrical orders up 43% with book-to-bill of 1.2 (Americas 1.3)
Data center orders
+101%
Rolling 12-month orders; data center revenue up 65%, the ninth consecutive quarter above 35% growth
Management outlook

Management raised 2026 organic growth guidance by 200 bps to a 13%-15% range (14% midpoint), lifting Electrical Americas to a 19% midpoint and Electrical Global to a 16% midpoint, both up 400 bps, and raised adjusted EPS to $13.70-$13.80 ($13.75 midpoint, up 14% versus 2025), the third increase this year, while maintaining the 24.1%-24.5% segment margin range. Boyd's full-year revenue outlook was raised for the third time to $1.9 billion (of which $1.6 billion is in Eaton's books), and management said the business should be at least a $2.7 billion business in 2027, roughly 50% growth, becoming part of organic growth in late March. For 2027, management said none of its end markets are expected to decline, with about 90% of the portfolio in markets expected to grow, total end markets up roughly 11% before outgrowth, well ahead of the 6%-9% 2026-2030 organic CAGR target, while Mobility falls to around $800 million of revenue after the Dana transaction closes in Q1. On capacity, 18 of 25 expansion projects are complete with the steepest part of the ramp behind them; the remaining six include a larger three-phase transformer plant, where workers are being hired and trained in existing Wisconsin plants ahead of the ramp. Price/cost was positive on a dollar basis in Q3, Q4 Electrical Americas incrementals are expected in the high-30s to close to 40% versus high-20s in Q3, and general price increases take effect January 2 in EA, EMEA and GIS. The tone was confident but deliberately non-triumphal, with formal 2027 guidance deferred to February.

From the call

“We said the second half would show the benefit of our capacity investments, and in Q3, our teams delivered on that promise. We came in above the high end of our guidance on every key metric.”

on Capacity ramp and execution

“Data centers continue to represent an enormous opportunity for us. We track the projects that were announced, and now they amount to 366 GW.”

on Data center pipeline

“As we think about 2027, I think that is the core of your question, we see at least a $2.7 billion business for next year, which is roughly 50% growth over our previous 1.8 guide.”

on Boyd Thermal 2027 outlook

What analysts asked

Where are you in the transition to next-generation 800-volt DC solutions and sidecar rack-based solutions? Are you seeing facility-level DC power orders yet, and where is solid-state transformer commercialization and production?

Paulo said Eaton remains in a strong leading position, noting the 15 kV 2 MW medium-voltage solid-state transformer passed all new UL tests in the U.S. in October — described as the first multi-megawatt unit to clear them — and that the indoor unit passed TÜV testing in IEC markets. He called the system unique in being liquid cooled, multi-port (AC and DC) and outdoor-ready, said Eaton also leads the other three building blocks (DC breakers, power quality/UPS and advanced cooling with Boyd), and stressed the company is architecture-agnostic and wins either way. Ten pilots are running with multiple 15 kV projects shipping this year and volume expected next year.

Electrical Global accelerated to 27% organic from about 18% last quarter — what is behind that step change, and should we assume this segment has entered an elevated growth phase?

Paulo attributed the acceleration to deliberate actions rather than accident, noting progression from 9% to 18% to 27% organic across Q1-Q3, with APAC near 50% and GIS and EMEA each around 20%, data centers up 97% in Global and machine OEM up 29%. He said the segment has entered what Eaton calls a sustained growth phase, supported by orders up 51% on a rolling 12-month basis and backlog that more than doubled year over year (still up 76% excluding Boyd), calling the drivers structural rather than cyclical. Dave Foster added that GIS expanded margins almost 400 bps from H1 to H2 on price, cost out and productivity.

Can you characterize how price/cost plays out this year and how you are setting pricing for 2027, quantify 2026 inefficiencies, and give a sense of capacity available in 2027 versus 2026 given the factory ramp?

Paulo said 2027 guidance would come in February but gave a framework: end markets growing at least 11% next year with Eaton planning to outperform, and incremental margins improving from roughly 23% in 2026. He flagged two portfolio items material to 2027 — Boyd planned at $2.7 billion, up 50% and becoming organic after mid-March, and Mobility contributing only around $800 million of revenue after the Dana transaction closes around Q1. Dave Foster said segment reviews are underway this week, preliminary looks feel good, with the formal review in the third week of November.

Potential supply chain impact
NVDAEaton's 800 VDC and solid-state transformer roadmap, plus Boyd liquid cooling, could deepen its documented NVIDIA partnership as rack-level power and thermal architectures converge; timing of the AC-to-DC transition remains outside Eaton's control.
VRTEaton's data center orders up 101% and Boyd's near-triple-digit growth may indicate share capture in data center power and thermal markets Vertiv also serves, though a rising tide could mask relative performance.
POWLRecord Electrical Americas orders above $5 billion alongside new switchgear and transformer capacity could signal a still-tight switchgear market, a potential read-through for Powell's end markets.
ABBElectrical Global's 27% organic growth with APAC near 50% and GIS and EMEA around 20% may suggest Eaton outgrowing electrification peers in Europe and Asia, though single-quarter share reads are imprecise.
FIXEaton's modular push through Fibrebond, NordicEPOD and Boyd — a roughly $1 billion Americas modular business in 2026 — could improve module availability for mechanical and electrical contractors such as Comfort Systems.
PHEaton's Aerospace record $5.6 billion backlog and its supplier fixes (second-sourcing, insourcing) suggest industry-wide aerospace supply constraints that could also affect Parker's aerospace operations.
ATKREaton's announced general price increases effective January 2 in EA, EMEA and GIS could signal a firmer electrical products pricing environment, a potential read for Atkore's pricing.