Garrett Motion Inc. earnings recap
Q3 FY2026, reported October 29, 2026 · Beat 7 of last 7 quarters
Garrett Motion Inc. reported Q3 FY2026 revenue of $930M, a miss of 0.6% against consensus, and EPS of $0.51, a beat of 12.9%.
The Buildout is a website built by one person using AI agents, and could have factual errors.
Garrett is a second-derivative read on AI infrastructure: its fastest-growing industrial line is large turbochargers for genset/power generation, the equipment class used for on-site and backup power, and the new Multistack award plus the Trane field testing put its high-speed E-Cooling Compressor into chillers and HVAC systems that serve the same demand complex. Neither revenue line is sized by management yet, and industrial at ~$300 million in 2027 is still a modest slice of a $3.8 billion sales base, so the signal is directional rather than transformational. What matters for the buildout is that Garrett's power-generation expectations have been revised up twice in consecutive quarters and its cooling launches are tracking to 2027.
| Estimate | Actual | vs est | ||
|---|---|---|---|---|
| Revenue | $935M | $930M | -0.6% | miss |
| EPS | $0.45 | $0.51 | +12.9% | beat |
Garrett reported Q3 net sales of $930 million, up 3% organically, with commercial vehicle and industrial combined growing 23% while light vehicle production was outperformed. Adjusted EBIT was $152 million at a 16.3% margin, up 160 basis points year over year including a 70 basis point FX drag, driven by mix and $13 million of operating performance improvement. Adjusted free cash flow was $136 million, an 89% conversion rate, helped by lower cash taxes from the timing of refunds. The company repurchased $57 million of stock and paid $15 million of dividends, repaid $50 million of term loan debt in October for $100 million year-to-date, and ended with $841 million of liquidity and 1.66x net leverage. Operationally, Garrett launched a high-volume E-Turbo with Mercedes, won multiple light vehicle programs for hybrids and China domestic and export, won commercial vehicle programs across all regions, launched an off-road turbo with Polaris, and secured an industrial E-Cooling Compressor award with new customer Multistack. Gasoline softness in the quarter was attributed primarily to the decline in China's domestic market, with tariff pass-throughs also reducing reported revenue.
Management reaffirmed its 2026 midpoint outlook while narrowing the ranges across all measures: net sales of $3.8 billion (4% growth at constant currency), adjusted EBIT of $580 million (15.3% margin) and adjusted free cash flow of $430 million (74% conversion). The reaffirmation is not a flat story — operating execution is now tracking better than prior expectations for adjusted EBIT and free cash flow, but those gains are being offset by foreign exchange headwinds concentrated in the fourth quarter. The clearest upward revision was in industrial, where management lifted the 2026 expectation to $230 million and guided to roughly $300 million in 2027, about 30% organic growth, almost entirely genset/power generation today, with E-Cooling Compressor revenue only beginning to ramp that year. Zero-emission milestones remain on a 2027 timeline: commercial vehicle E-Powertrain launch, industrial cooling launches, and first deliveries tied to the new Multistack E-Cooling award. Management declined to size the HVAC/E-Cooling opportunity, citing a fluid marketplace and an adoption curve still ahead, but said it is accelerating launches and adding larger compressor sizes. On 2027, Olivier Rabiller explicitly avoided forecasting the auto industry, saying the company is positioning its cost structure conservatively and that the highest-certainty growth is industrial. Capital returns continue: a new $250 million share repurchase authorization for 2027 was announced alongside a $0.08 quarterly dividend.
“In industrial, growth for existing power generation programs further accelerated and exceeds prior expectations. Based on this momentum, we now expect industrial sales to reach $230 million this year and about $300 million in 2027.”
on Industrial / power generation guidance raise
“Certainly, you are seeing a favorable margin with our existing product set in the big turbos for industrial. That capacity is in place and, for us, we know how to do it. We have done it for many years. That absolutely is very favorable when it comes to mix impact on margin.”
on Industrial mix and margin
“We are signing a new customer for the E-Cooling Compressor and, as I was mentioning, we are getting a fantastic traction with a number of players into that industry.”
on E-Cooling / HVAC traction
With industrial at $300 million next year versus the $250 million outlined at the Analyst Day, how much is genset versus other verticals, and have you reset longer-term expectations for that component — could it reach $500 million with more supply agreements?
Olivier Rabiller said the $300 million is mostly genset today and is already above the $250 million figure, and that the company will likely come back next year with an updated longer-term view. E-Cooling Compressor ramps in 2027 but will be relatively small versus genset in that year. He would not size the Trane and Ingersoll agreements, saying the customer programs are still in motion and the industry is very dynamic, but that Garrett is adding ambition and larger compressor prototypes, with customer feedback reinforcing that view.
On the Trane program, you had units in the field testing over the summer — what did you learn about system efficiency, and do you have a clearer revenue trajectory after the testing?
Rabiller said the tests confirmed all performance expectations versus existing solutions and the company is extremely pleased, but that timing is still in flux as it works with customers on which applications, end customers and programs adopt first, across multiple product sizes. Sean Deason added that the margin math depends on the overall mix, including softening light vehicle volumes, but that incremental industrial/HVAC sales dropping through the lines is favorable.
Beyond the industrial expansion from $230 million to $300 million, any preliminary view on 2027 for the rest of the business — commercial vehicle puts and takes, regional light vehicle production trends, and whether mid-single-digit organic growth is sustainable?
Rabiller declined to forecast the auto industry for 2027, noting wide regional variation this year and that Europe and Asia remain fluid, with no clarity yet before year-end. He said Garrett plans conservatively on cost and has the structure to deliver, is growing faster than the total market (share of demand gains), and has launches next year supporting that trend. Industrial is the area of highest certainty given program ramp-ups independent of industry movement, while auto mix remains the watch item.