MPLX Lp earnings recap

Q3 FY2026, reported November 3, 2026 · Beat 3 of last 5 quarters

MPLX Lp reported Q3 FY2026 revenue of $3.60B, a beat of 7.5% against consensus, and EPS of $1.15, a beat of 1.8%.

The Buildout is a website built by one person using AI agents, and could have factual errors.

Go to the full MPLX Lp company page →See the earnings preview →MPLX Lp is in the Utilities & Energy layer →
What this means for the buildout

MPLX is adding midstream capacity directly against the gas and NGL demand pull management tied to gas-fired power generation, LNG exports and global market access: 4.5 Bcf/d of new Permian egress through Solitude, Northeast processing now at 8.1 Bcf/d and running 93% utilized, and Permian sour gas treating headed above 400 MMcf/d. The Solitude FID in under 90 days on strong shipper contracts, and a partner mix that includes producers as well as midstreamers, may signal that Permian egress is being contracted ahead of the demand rather than after it. The Gulf Coast fractionation and LPG export build, targeted for 2028 and 2029, extends the same value chain to the water.

Results vs consensus
EstimateActualvs est
Revenue$3.35B$3.60B+7.5%beat
EPS$1.13$1.15+1.8%beat

These figures come from the same table as our earnings calendar. The write-up below may quote the company's own adjusted or reported figures, which can differ.

What was said

MPLX reported third-quarter adjusted EBITDA of $1.9 billion, up 5% year over year and up 7.3% excluding the late-2025 Rockies divestiture, and returned roughly $1.1 billion to unitholders. Crude Oil and Products Logistics segment adjusted EBITDA rose $67 million on higher rates and increased butane blending, with terminal throughput up 6% on higher export volumes; Natural Gas and NGL Services segment adjusted EBITDA rose $26 million, or 10% excluding Rockies. Gathering volumes grew 14% and processing volumes 5%, with Northeast processing running at 93% utilization. The Harman Creek III complex began operations with 300 MMcf/d of processing and 40,000 bpd of deethanization capacity, lifting Northeast processing capacity to 8.1 Bcf/d and fractionation to 800,000 bpd. The quarter included $77 million of incentive compensation expense, $37 million above the prior-year quarter, with year-to-date expense of $167 million running $48 million higher and reducing full-year adjusted EBITDA growth by approximately 1%. Separately, MPLX agreed to divest midstream assets supporting MPC's Saint Paul Park and Mandan refineries for $750 million, representing roughly a 9x EBITDA multiple.

Key metrics
Adjusted EBITDA
$1.9B
+5% vs. Q3 2025; +7.3% excluding the late-2025 Rockies divestiture
Quarterly distribution increase
12.5%
Third consecutive year at that rate; annualized rate now $4.84 per unit
Announced divestiture
$750M
Midstream assets supporting MPC's Saint Paul Park and Mandan refineries, ~9x EBITDA
Gathering volumes
+14% YoY
Producer activity across Utica, Marcellus and Permian; Utica gathering and processing volumes up 19%-20%
Permian long-haul capacity interest
~16 Bcf/d
Up from 11 Bcf/d with the 4.5 Bcf/d Solitude system; expected in service late 2029
Management outlook

Management reiterated that 2026 adjusted EBITDA growth will be second-half weighted, with the fourth quarter above the third as Secretariat I and Harmon Creek III continue to ramp, Utica processing utilization builds from 73% in Q2 to 89% in Q3, Titan I runs above 150 MMcf/d, and Bay Runner, the BANGL expansion from 250,000 to 300,000 bpd and Blackcomb all reach service in the quarter. Titan II is expected to be complete at the end of this year and to begin its ramp toward 400 MMcf/d in 2027, not in the fourth quarter. Management said 2027 EBITDA growth should be stronger than 2026 even with the loss of EBITDA from the divested assets, but acknowledged that another 12.5% distribution increase may be impacted by that loss; they still expect a significant 2027 distribution increase greater than distributable cash flow growth and are comfortable with annual coverage of 1.3x. The 2026 organic growth capital program is $2.9 billion, over 90% directed to natural gas and NGL infrastructure, and 2027 capital is not expected to be stronger than 2026. Longer-dated projects — the first 150,000 bpd Gulf Coast fractionator, purity pipeline and 400,000 bpd JV LPG export facility — remain on schedule and on budget for the first half of 2028, with the second 150,000 bpd fractionator in 2029 and Solitude in late 2029.

From the call

“Acknowledge that another year of 12.5% distribution growth may be impacted by the loss of this EBITDA. And we still expect a significant distribution increase in 2027 greater than distributable cash flow growth.”

on Distribution growth outlook

“Solitude was 1 of the fastest projects to reach FID in the company's history, with strong long term contracts from shippers bringing the project from commercial to FID in under 90 days, supporting our view of long term production growth.”

on Permian egress and Solitude

“Growing producer activity, increasing demand for natural gas fired power generation and expanding access to global markets support continued investment across our integrated value chains.”

on Demand drivers

What analysts asked

On the second-half EBITDA ramp — how much color can you give on the fourth quarter, whether the Titan expansion contributes, and any incremental detail on 2027 versus 2026?

Management said the fourth quarter should grow over the third as Secretariat I and Harmon Creek III continue ramping, Utica processing utilization builds from 73% to 89%, Titan I runs above 150 MMcf/d, and Blackcomb and BANGL (250,000 to 300,000 bpd) enter service in the quarter; Titan II will not contribute in Q4 because it completes at year-end and begins ramping to 400 MMcf/d in 2027. For 2027 they expect EBITDA growth stronger than 2026 even after the divestiture, and flagged long-term incentive compensation — $37 million higher year over year in Q3 — as something that could be a headwind or a tailwind depending on MPC's share price.

How quickly do you expect to redeploy proceeds from the asset sale, and should we think about the target as organic growth, M&A, or a mix?

Management said the proceeds strengthen the balance sheet and add flexibility; 2027 capital will be discussed on the next call, but ongoing projects include the two fractionators and export dock, Titan II, Traverse, the Marcellus gathering expansion, Eiger, Solitude and Secretariat. They said 2027 capital is not expected to be stronger than 2026 and that proceeds will be deployed as quickly as possible into organic or inorganic opportunities that meet return criteria.

How would you frame the long-term capex run rate at this point, given the growth projects coming online in 2027?

The CFO said the $1.26 billion figure is an elevated amount reflecting capital pulled forward on projects such as Secretariat II and the NGL wellhead-to-water build, not overspending, and that 2027 likely looks less than 2026. Longer term, because the base business keeps getting bigger, the dollars required to deliver mid-single-digit EBITDA growth at mid-teens returns increase each year, and spend will not be linear — it can come in chunks.

Potential supply chain impact
NEXTThe Bay Runner pipeline is expected in service in the fourth quarter, providing additional access to LNG export infrastructure along the Gulf Coast, with management expecting volumes to ramp through 2027 to support the end user's commissioning and scaling demand — a potential signal on the timing of NextDecade's Brownsville feedgas requirements.