Western Digital Corporation earnings recap

Q1 FY2027, reported October 22, 2026 · Beat 8 of last 8 quarters

Western Digital Corporation reported Q1 FY2027 revenue of $4.38B, a beat of 5.7% against consensus, and EPS of $4.64, a beat of 12.9%.

The Buildout is a website built by one person using AI agents, and could have factual errors.

Go to the full Western Digital Corporation company page →See the earnings preview →Western Digital Corporation is in the Servers & Compute layer →
What this means for the buildout

The call reinforces that AI infrastructure spending is translating into durable capacity-oriented storage demand rather than a one-time build: management cited visibility to 2030-2031 with its largest customers and a demand signal that keeps rising quarter over quarter. The stated path to more exabytes is areal density — 40TB ePMR now, HAMR at 44TB and then 55TB — with CapEx going into heads, media and automation rather than new unit capacity, which suggests supply discipline could persist even as AI, neocloud and frontier-lab demand broadens the customer base. High-bandwidth drive sampling and the commentary on inference, agentic and physical AI workloads hint at HDDs moving into performance-adjacent tiers of the AI storage stack.

Results vs consensus
EstimateActualvs est
Revenue$4.14B$4.38B+5.7%beat
EPS$4.11$4.64+12.9%beat
What was said

Western Digital reported fiscal Q1 2027 revenue of $4.4 billion, up 55% year-over-year, on 248 exabytes shipped, up 22% year-over-year and 8% sequentially. Cloud was 88% of revenue at $3.9 billion, up 54%; client was 7% at $320 million, up 119%; and consumer was 5% at $193 million, up 19%. Gross margin expanded to 58.1% and operating margin to 49.1%, with operating income of $2.2 billion, up 152%, and opex at $391 million, or about 9% of revenue. Blended average price per terabyte rose 28% year-over-year versus the high-teens growth reported in the prior quarter. The company generated $1.4 billion of free cash flow, returned $1.1 billion through buybacks and dividends, substantially reduced its remaining 2028 convertible notes, and ended with a net cash position of $0.5 billion.

Key metrics
Revenue
$4.4B
Up 55% year-over-year; results ahead of management's expectations
Exabytes Shipped
248 EB
Up 22% year-over-year and 8% sequentially; management called this the floor for exabyte growth
Gross Margin
58.1%
Up 1,420 bps year-over-year; incremental gross margin above 80%
Non-GAAP EPS
$4.64
Up 161% year-over-year on a 383M diluted share count
Q2 FY27 Revenue Guide
$5.1B ±$100M
Implies 69% year-over-year growth at the midpoint; gross margin guided to 60%-61%
Management outlook

Management guided Q2 FY2027 revenue to $5.1 billion plus or minus $100 million, a 69% year-over-year increase at the midpoint, with gross margin of 60% to 61% and EPS of $5.80 plus or minus $0.20. Irving Tan described the current quarter as the floor for exabyte growth, with acceleration expected through fiscal 2027 and into fiscal 2028 as the 40TB ePMR platform ramps (roughly 30% of nearline shipments in Q2, 50% in Q3) and first-generation HAMR moves from qualification with two hyperscalers in Q1 calendar 2027 to volume shipments in the first half of calendar 2027, with two additional customers starting qualification in that same half. Kris Sennesael said CapEx will run modestly above the 4%-6%-of-revenue five-year average over the next two years, directed at heads, media and factory automation rather than unit capacity, and flagged that near-term cost per terabyte will decline less than the long-term 10% target due to DRAM and NAND input cost inflation being offset through value engineering. Visibility was framed as extending to 2030-2031 with the top seven customers, and the board raised the quarterly dividend 17% to $0.175 per share.

From the call

“We sort of see the current quarter as being sort of the floor in terms of exabyte growth, and we see that accelerating through the rest of the fiscal year.”

on Exabyte growth trajectory

“if you take our top 7 customers as an example, we have good visibility up to 2030, 2031 for across all of them”

on Demand visibility

“given the strong demand environment that we operate in, given the fact that we continue to move to higher capacity drives and continue to add more value to our customers, there is definitely further room for ASP per terabyte increases going forward over the next, call it, 3, 4 quarters.”

on Pricing sustainability

What analysts asked

What are the remaining milestones between completing HAMR qualification with two hyperscalers in March and volume shipments mid-2027, and does the pace of scaling depend on customer deployment schedules or your manufacturing readiness?

Irving Tan said customer feedback, particularly on failure rates versus other players in the market, gives confidence in finishing qualifications with the two customers in Q1 calendar 2027, with two more customers starting qualification in the first half of calendar 2027. He said nothing has surfaced that would cause a pause in translating qualification completion into volume shipments in the first half of 2027, that customer technical support teams are working the qual schedules, and that operations is working with internal manufacturing assets and vendors on supply chain readiness. Second-generation HAMR at 5 terabytes per platter on an 11-disk platform begins qualification in the second half of calendar 2027.

Can you give more granular detail on visibility — how far out, how many customers, and are those customers' exabyte needs expanding relative to three or six months ago?

Tan pointed to the top seven customers, where WD has good visibility up to 2030 and 2031 across all of them, which supports planning both technology and supply. He said the demand signal is increasing quarter after quarter and that demand looks durable through the 2028-2030 timeframe.

Implied year-over-year pricing for the December quarter looks above 30% versus a historical high-teens sustainable rate — how should we think about the sustainability of those price increases going forward?

Sennesael noted ASP per terabyte was already up 18% a quarter ago and 28% last quarter, and said that given the strong demand environment and the continued move to higher capacity drives, there is further room for ASP per terabyte increases over the next three to four quarters, though he expects it to eventually slow.

Potential supply chain impact
RMBSManagement called out DRAM and NAND input cost increases inside its drives and a tight supply chain, which could keep memory content a rising cost line for WDC and may support demand for memory interface and related components from suppliers.
STXAnalysts repeatedly pressed on competitor unit capacity adds and on WDC's exabyte growth trailing its peer; WDC's answer was that areal-density leadership, not unit adds, is its path, so competitor capacity behavior may influence industry pricing and WDC's relative share trajectory.