Atmus Filtration Technologies Inc. (ATMU) | The Buildout — AI Infrastructure
The Verdict
Atmus makes filtration products — fuel, lube, air and hydraulic filters, crankcase ventilation, coolants and other chemicals — sold mainly under the Fleetguard brand to makers and operators of commercial trucks, agricultural, construction, mining and power-generation equipment. That core business runs on truck build schedules and aftermarket replacement demand, not on AI. Its connection to the AI buildout is narrow: the industrial-air business it acquired in January 2026 makes filters for commercial and industrial HVAC systems, and management names data centers as one of that business's high-growth end markets. That appears to place Atmus at the building-filtration layer around a data center, not in the compute, power or cooling systems themselves. Its AI exposure is stated plainly as indirect, small and unquantified.
| Market Cap | — |
| Revenue (TTM) | $1.9B |
| Revenue Growth | +13.1% |
| EBITDA Margin (TTM) | 19.5% |
| Net Debt | $742M |
| Earnings Beats | 7 of 7 |
| P/E (TTM) | — |
| EV/EBITDA (TTM) | — |
What We Like
- Revenue is growing double digits and guidance was raised: Q2 2026 sales set a record, up 16.4% y/y, and FY2026 revenue guidance moved to $1.975B-$2.03B from $1.945B-$2.015B.
- Integration is running ahead of pace: more than 95% of the Koch Filter transition services agreement was exited by Q2, up from just over 50% in Q1, with completion set for Q3 2026.
- Cash generation improved: adjusted free cash flow was $67M in Q2 versus $36M a year earlier, on capex of $13M.
- The balance sheet is deleveraging: $259.0M of cash at Jun 30, 2026, and net debt / adjusted EBITDA of 1.9x, down from 2.0x at March 31.
- Capital is being returned and debt targeted: the quarterly dividend was raised to $0.06 per share, buybacks are guided to $20M-$40M for FY2026, and management says it intends to allocate surplus cash toward paying down gross debt.
What We’re Watching
- The aftermarket is 85% of Power Solutions revenue and management says it is still flat year over year, with about half of that in the U.S. A U.S. freight inflection is the largest single revenue lever in the business, and management says it has not seen one.
- Industrial Solutions adjusted EBITDA margin fell to 18.9% in Q2 from 21.9% in Q1. Management calls the drop one-off and points to a roughly 20% year-to-date rate; Q3 is the test.
- Tariff exposure sits on one site: San Luis Potosí, Mexico — the largest facility at 472,000 square feet, leased, and dependent on a temporary USMCA exemption the 10-Q says may be reduced or eliminated. IEEPA tariff refunds are unbooked and uncertain.
- The FY2026 guide implies a second half below the first on both revenue and margin, on Middle East commodity inflation, lower India JV income, and second-half price realization of just over 0.5%.
The picture is more mixed than the headline growth suggests. Revenue is up double digits and guidance was raised, but most of that growth is the January 2026 acquisition plus price and FX, and the piece that matters most — the aftermarket at 85% of Power Solutions — has not moved. The new Industrial Solutions segment carries the strategic story and just posted a 300-basis-point sequential margin decline that management calls temporary. Integration is nearly complete and cash flow is improving, which are real positives, and the margin band was narrowed rather than cut. The open question is whether the first-fit truck recovery holds through the second half without the aftermarket, and whether Industrial Solutions margin returns to roughly 20% in Q3.
Earnings Beat
Q2 2026 sales were a record $528M, up 16.4% year over year from $454M, driven by the January 2026 Koch Filter acquisition and by Power Solutions. Gross margin was $154M, or 29.2% of sales, versus $131M and 28.9% a year earlier. Adjusted EBITDA was $109M, or 20.7% of sales, and adjusted free cash flow rose 86% to $67M from $36M.
| Metric | Q2 FY2026 | Q1 FY2026 | Q2 FY2025 | YoY |
|---|---|---|---|---|
| Revenue | $528M | $478M | $454M | +16.4% |
| Gross margin | 29.2% | 28.0% | 29.3% | -10bps |
| EBITDA | $109M | $94.0M | $89.1M | +22.0% |
| EPS (GAAP) | $0.78 | $0.59 | $0.72 | +8.0% |
| Power Solutions sales | $486M | $439M | $454M | +7% |
| Industrial Solutions sales | $42M | $38M | n/a | — |
We are already seeing the benefits of this cyclical recovery in our 2Q results and have good visibility through the end of the year.— Stephanie Disher, Aug 7, 2026
Management tone: Between the two calls, management stayed cautious on the macro while sounding more confident on execution. On the Q1 call they described freight as muted and expected the market to stay relatively flat; on Q2 they said they were "starting to see signs of health" in freight, citing higher spot rates, but kept the flat aftermarket outlook unchanged. First-fit language sharpened: Q1 cited pre-buy ahead of 2027 rules, while Q2 said the company is already seeing the cyclical recovery and has good visibility through the end of the year. The full-year price guide was raised to 1.5% from about 1%, with second-half realization disclosed at just over 0.5%. They also acknowledged the Middle East conflict as persisting longer than expected, after saying in Q1 that the risk was not in guidance. On the analyst Q&A, management appeared mostly direct, with the clearest non-answer occurring in Q1 on diesel-price exposure.
Management Guidance
Management guides FY2026 total revenue of $1.975B-$2.03B, raised from $1.945B-$2.015B; adjusted EBITDA margin of 19.75%-20.25%, narrowed from 19.5%-20.5%; and adjusted EPS of $2.85-$3.00, with the floor raised from $2.75. By segment, Power Solutions is guided to $1.82B-$1.865B, raised from $1.79B-$1.85B, and Industrial Solutions is reaffirmed at $155M-$165M. The Power Solutions build assumes volume of flat to 2%, price of approximately 1.5% and FX of approximately 2%. Full-year pricing is guided to 1.5%, with second-half realization moderating to just over 0.5%. Integration costs are guided to $3M-$6M and intangible amortization to $11M-$13M. The company guides the U.S. heavy- and medium-duty market up 5% to up 15% versus 2025.
Trajectory
Revenue has stepped up through 2026: $447M in Q4 FY2025, $478M in Q1 FY2026 and a record $528M in Q2. Most of the increase is the January 2026 Koch Filter acquisition, which created the Industrial Solutions segment, plus price and FX in Power Solutions; Power Solutions volume turned positive at 2% in Q2 after falling slightly in Q1. Margins are close to flat. The code-computed signals show gross margin compressing while operating and EBITDA margins are stable, and FY2025 adjusted EBITDA margin was 20.0%. The full-year guide itself implies a second half slightly below the first on both revenue and margin at the midpoint. Cash conversion is running below net income: trailing-twelve-month free cash flow was 75% of net income.
The Model
The model projects next fiscal year's revenue of $2.02B with EBITDA of $406M, a 20.05% margin, and the following fiscal year's revenue of $2.12B with EBITDA of $429M, a 20.3% margin. The near-term figure is anchored on the contribution of the January 2026 Koch Filter acquisition and on the first-fit truck recovery management says is second-half loaded. The following fiscal year assumes continued revenue growth on top of that, with EBITDA margin widening about 25 basis points from next fiscal year.
| Metric | FY2025 | Next FY (E) | FY after (E) |
|---|---|---|---|
| Revenue | $1.8B | $2.0B | $2.1B |
| YoY Growth | — | +14.8% | +4.5% |
| EBITDA | $329M | $406M | $429M |
| EBITDA Margin | 18.6% | 20.1% | 20.3% |
Projections are the median of 4 independent model runs.
What Could Go Right — and Wrong
- A confirmed U.S. freight inflection reaches aftermarket orders — the aftermarket is 85% of Power Solutions revenue and roughly half of it is U.S.
- The aftermarket grows rather than staying flat, reversing the mix headwind that works against margin as first-fit recovers.
- Industrial Solutions margin normalizes back toward the roughly 20% year-to-date rate in Q3, confirming the 18.9% print was temporary.
- Another industrial filtration acquisition closes — an industrial-air bolt-on or the named industrial water and liquid filtration 'anchor investment.'
- Middle East effects recede in the second half as guided, easing commodity inflation in chemicals and plastics and stabilizing India JV income.
- The aftermarket turns negative rather than flat; management says it has little forward visibility in aftermarket orders and the pool is assumed stable, not contracted.
- Q3 Industrial Solutions margin stays near 18.9% instead of returning to roughly 20%, weakening the claim that the segment is a 20% margin platform.
- A USMCA exemption change forces relocation from the San Luis Potosí, Mexico plant — the largest site, leased, with the company having said relocation could mean lost customers.
- Middle East effects persist into 2027, keeping commodity inflation and lower India JV income in the run rate.
- The first-fit recovery proves to be pre-buy pull-forward rather than cyclical demand, with the 2027 EPA proposal easing some pre-buy pressure.
Looking Ahead
Over the next year the test is whether the second-half setup delivers. Management says the first-fit recovery is loaded into the second half and that it has good visibility through the end of the year; the Koch Filter integration is due to finish in Q3 2026; and Middle East sales are expected to recover in the second half. The source records no announced capacity addition, new plant, data-center project or long-range guidance. Beyond that, management points to a robust pipeline of industrial filtration M&A — industrial-air bolt-ons and, potentially, an industrial water and liquid filtration anchor investment — with no deal or timing named.
- Q3 2026Koch integration completion — Complete the Koch Filter TSA exit; drops redundant expense
- Q3 2026Q3 2026 earnings call — Tests integration completion, first-fit recovery, segment margins
- Second half 2026First-fit recovery — Management says the cycle recovery is all second-half loaded
- Second half 2026Middle East recovery — Guides Middle East sales and India JV income to recover
- FY2026Full-year guidance — Raised from $1.945B-$2.015B; EBITDA margin band narrowed from 19.5%-20.5%
- 2027EPA 2027 emission rule — Final rule could shift pre-buy demand and truck build rates
Financials
Annual Summary
| Metric | FY2024 | FY2025 | TTM | YoY |
|---|---|---|---|---|
| Revenue | $1.7B | $1.8B | $1.9B | +5.7% |
| Gross Margin | 27.9% | 28.9% | 28.8% | +98bps |
| EBITDA | $291M | $329M | $370M | +12.9% |
| EBITDA Margin | 17.4% | 18.6% | 19.5% | +120bps |
| Net Income | $186M | $207M | $215M | +11.7% |
| Free Cash Flow | $56.8M | $149M | $190M | — |
| Net Debt | — | — | $742M | — |
Net Debt = total debt minus cash and short-term investments at Jun 30, 2026. A company’s own leverage measure can differ.
Key Ratios (Trailing)
- P/E TTM—
- EV/EBITDA TTM—
- EV/Revenue TTM—
- Price/FCF TTM—
- Gross Margin (TTM)28.8%
- EBITDA Margin (TTM)19.5%
- Net Margin (TTM)11.3%
- ROIC21.9%
- FCF Conversion51.4%
- SBC / Revenue0.7%
The Company
Atmus Filtration Technologies makes filtration products for engines and equipment: fuel filters, lube filters, air filters, crankcase ventilation, hydraulic filters, and coolants and other chemicals. The FY2025 10-K describes the company as "one of the global leaders of filtration products for on-highway commercial vehicles and off-highway agriculture, construction, mining and power generation vehicles and equipment," with products sold principally under the Fleetguard brand that "enable lower emissions and provide superior asset protection." FY2025 net sales were $1,764.3 million, split roughly 58% on-highway and 42% off-highway. The headquarters is Nashville, Tennessee.
The company runs a footprint of 14 sites listed in the 10-K — manufacturing and technology locations across the U.S., Mexico, Brazil, China, South Korea, India, France, Australia and South Africa — most of them leased. The largest single site is San Luis Potosí, Mexico, at 472,000 square feet and leased; the 10-Q calls it "our largest global manufacturing facility" and says it supplies U.S. and global markets. Distribution runs through what management calls an Atmus controlled distribution network, which it says has lifted delivery and on-shelf availability metrics to all-time highs. In January 2026 the company closed the Koch Filter acquisition for approximately $456.4 million in cash net of working-capital adjustments, creating a second segment, Industrial Solutions, alongside the legacy Power Solutions business.
Business Segments
Competitive Landscape
Atmus competes in a filtration market the fiscal 2025 10-K describes with a named participant set: "Key global participants in this market include MANN+HUMMEL, Donaldson, Parker and MAHLE." Filtration appears to be consolidating — Donaldson completed Facet Filtration, described as its largest-ever acquisition, and Parker Hannifin's pending Filtration Group deal would "more than triple" the size of its filtration business and add 500 basis points of aftermarket. Atmus's own Koch Filter purchase appears to be part of the same trend, and it is smaller than those pro-forma combinations; its offset appears to be timing, since the Koch integration is nearly complete while the others are pending or ongoing. We also found an aftermarket divergence — Donaldson's Mobile aftermarket grew 9% with double-digit growth in the independent channel while Atmus's aftermarket was flat — and it remains open whether that is share pressure or mix.
- MANN+HUMMELNamed in the 10-K's competitive set.
- DonaldsonNamed in the 10-K competitive set; other companies' calls suggest Donaldson completed Facet Filtration and that its Mobile aftermarket grew 9% while Atmus's aftermarket was flat. Our supply-chain mapping also lists Donaldson simultaneously as competitor, customer and supplier.
- ParkerNamed in the 10-K competitive set; the source notes Parker's pending Filtration Group acquisition would more than triple its filtration business and add 500 basis points of aftermarket, with deals expected to close 2H calendar 2026 / 1H FY27.
- MAHLENamed in the 10-K's competitive set.
- CamfilAppears in our supply-chain mapping as a competitor in industrial air filtration for data-center HVAC; based on our mapping, not disclosed by the company.
Supply Chain
Atmus buys filter media and components and ships finished filters to truck and equipment OEMs and aftermarket distributors, plus industrial and commercial HVAC channels through Koch Filter. We found no other company's earnings-call transcript that names Atmus directly.
Related companies
See all Cooling companies → · How this layer works: Chapter 5, Cooling →
More on ATMU: Earnings recap