ESI reported Oct 21 — this analysis reviews the prior quarter. Read the Q2 FY2026 recap →

Element Solutions Inc (ESI) | The Buildout — AI Infrastructure

——Mkt cap — · 52-wk —–— · YTD — · delayed
Updated Oct 19, 2026Q2 FY2026 reviewed
Element Solutions formulates specialty chemicals and materials used to make AI chips, circuit boards and thermal systems.
Electronics +20%
Q2 2026 organic growth, up from +15% in Q1.
Semis +31% organic
Q2 growth, about two-thirds volume and one-third metal price.
Record Q2; guide up
FY26 adjusted EBITDA guidance raised to $690–710M from $665–685M.
Leverage 2.9x
Pro forma, targeting ~2.5x by year-end.
The Buildout Takeaway
The AI build-out is showing up in Element's Electronics segment as volume-led organic growth, and management has raised its full-year profit guidance twice in three months. The framework's criticality read cuts the other way: if ESI disappeared, the build-out would need requalification but see no meaningful slowdown, because substitutes exist. The open question is whether the growth pace holds through a second half management itself expects to be roughly flat sequentially.
35 analysts·16 Buy13 Hold6 Sell
Coverage is thin — only 5 price estimates, so no target is shown

FY2026 adjusted EBITDA $690–710M · Q3 2026 adjusted EBITDA ~$180M · FY2026 adjusted EPS growth ~20% · FY2026 capex ~$100M · net leverage ~2.5x by year-end 2026.
Important: The Buildout is a data analytics platform. Content is generated by algorithms and AI agents using public filings, earnings transcripts, and market data. This is not personalized investment advice.
Our View

The Verdict

Element Solutions makes specialty chemicals and material process technologies — the formulations that go into making other companies' electronics work. Its Electronics segment supplies thermal interface materials for AI GPUs and CPUs, advanced packaging materials for OSATs in Asia, power-electronics products for data-center power modules, high-reliability alloys and engineered preforms for data-center assembly, and metallization chemistries for server boards. The company sits upstream: it owns no data centers, builds no racks and powers nothing. Its chemistries are a small line item in a customer's bill of materials but sit on the critical path of yield and throughput, which management says makes switching in this industry uncommon. The Specialties segment — industrial finishing chemistries and offshore-energy fluids — carries little direct AI linkage.

Market Cap—
Revenue (TTM)$3.2B
Revenue Growth+26.6%
EBITDA Margin (TTM)17.7%
Net Debt$1.9B
Earnings Beats6 of 7
P/E (TTM)—
EV/EBITDA (TTM)—

What We Like

  • Electronics organic growth accelerated for a third straight quarter, from +15% in Q1 2026 to +20% in Q2 2026, with every vertical in double digits.
  • Semiconductor Solutions organic growth stepped up from +18% to +31%, which the CFO decomposed as roughly two-thirds volume and one-third metal price inflation.
  • Advanced packaging is already "several hundred million dollars of revenue" today, with management pointing to processes of record that should ramp in about 18 months.
  • Growth is capital-light: capex is guided to roughly $100M, less than 3% of sales, and management says it is "not capacity constrained by and large in the semi business."
  • Excluding above-target incentive compensation, Q2 2026 adjusted EBITDA margin would have been "nearly 30%," which management calls its long-term target.

What We’re Watching

  • Consumer electronics remain weak: management expects no typical smartphone seasonal ramp in the second half of 2026.
  • Raw material and logistics inflation from the Iran conflict may not be recaptured immediately; the Q1 call put the unmitigated exposure at "tens of millions of dollars of risk."
  • MKS Instruments and Qnity are building capacity in the same advanced packaging, AI PCB and thermal lanes for 2027–2028.
  • Net leverage was 2.9x pro forma against a ~2.5x year-end target, with $800M of notes due in 2028 as the first significant debt repayment.
Bottom Line

The operating thesis is strengthening and the capital-allocation question is unresolved. Electronics organic growth accelerated for a third consecutive quarter, guidance was raised twice in three months, and the guide was then affirmed alongside the termination of the Solstice merger. The two products carrying the next leg — Cuprion, still unsized and pre-revenue, and advanced packaging, already "several hundred million dollars of revenue" today but with its inflection years out — are both dated rather than delivered, and reported margins are compressed by metal pass-through arithmetic that management has redefined away. The open question is whether the growth pace holds through a second half the company itself expects to be roughly flat sequentially, with no smartphone ramp and inflation it may not recapture.

Next upThe next scheduled check is Q3 2026 results, against management's Q3 adjusted EBITDA guide and its assumption of roughly flat sequential performance from Q2. It tests whether the Electronics demand acceleration holds and whether half-two inflation and Micromax softening land inside the guided range.
Last Quarter — Q2 FY2026

Earnings

Element reported a record quarter for revenue, adjusted EBITDA and adjusted EPS in Q2 2026. Revenue was $977.9M and gross margin 34.2%, down from 42.6% a year earlier on pass-through metals and acquisition arithmetic. Organic net sales grew 15% and constant-currency adjusted EBITDA grew 33% year over year. Adjusted EBITDA margin on the company's ex-pass-through-metals basis was 27.8%, up 120 basis points year over year and flat sequentially.

MetricQ2 FY2026Q1 FY2026Q2 FY2025YoY
Revenue$978M$840M$625M+56.4%
Gross margin34.2%38.4%42.6%-840bps
EBITDA$158M$154M$132M+19.5%
EPS (GAAP)$0.32$0.23$0.20+62.2%
Adjusted EBITDA margin (ex pass-through metals)27.8%27.8%n/a+120 bps y/y
Semiconductor Solutions organic growth+31%+18%n/a—
Table shows reported figures; the text may discuss adjusted or continuing-operations numbers.
activity accelerated across our supply chain in support of the ongoing AI infrastructure build-out— Ben Gliklich, CEO, Jul 28, 2026

Management tone: Across the two quarters management's demand language shifted: Electronics growth was described on the Q1 2026 call as "the strongest we have seen in this segment since early 2021," and on the Q2 2026 call as "activity accelerated across our supply chain." On the Q2 call, management declined to take questions on the Solstice merger and limited comments to prepared remarks and public filings, while volunteering that "the stock's reaction to the announcement has been disappointing." It named deliberate conservatism in its own back-half assumptions — a modest Micromax softening and no smartphone seasonal ramp — and said the Cuprion capacity outlook was higher than it was entering the quarter.

Management Guidance

For FY2026 management guides adjusted EBITDA of $690–710M, adjusted EPS growth of approximately 20%, capex of roughly $100M — less than 3% of sales — and net leverage of roughly 2.5x by year-end. Q3 2026 adjusted EBITDA is guided to approximately $180M. The half-two assumptions management named are continued strong electronics demand, no typical seasonal smartphone ramp, raw material and logistics inflation from the Iran conflict, and a modest softening in Micromax; together those produce roughly flat sequential performance from Q2 to Q3, followed by normal fourth-quarter seasonality. The guide accounts for one-time metal hedge gains realized in the first half of 2026 and associated costs recorded in the second half of 2025. Q3 and full-year 2026 guidance were affirmed on Aug 27, 2026.

Business Trajectory

Trajectory

Revenue has stepped up sharply over four quarters — $656.1M in Q3 FY2025, $676.2M in Q4 FY2025, $840.0M in Q1 FY2026 and $977.9M in Q2 FY2026 — with the last two quarters carrying pass-through metals pricing that reached $255.7M in Q1 2026 alone, plus the two acquisitions closed at the start of the year. Organic growth, the line management steers by, went from +10% to +15% at the total level and from +15% to +20% in Electronics. Reported gross margin compressed from 42.6% in Q2 FY2025 to 34.2% in Q2 FY2026; the company says Electronics gross margin excluding pass-through metals improved 550 basis points year over year in Q1 2026. Adjusted EBITDA margin on the ex-metals basis held at 27.8% in both Q1 and Q2 2026.

Revenue & Margin Trajectory
RevenueGross margin (36% to 34%)$0$500$618M$978MQ4'22Q2'23Q4'23Q2'24Q4'24Q2'25Q4'25Q2'26
RevenueGross margin (42% to 34%)$0$500$645M$978MQ4'24Q2'25Q4'25Q2'26
Most recent quarters shown (8 on phones, 16 on larger screens). Gross margin as reported; gaps mean the figure was not reported.
Share Price — 12 Months
$30$40$5052-wk high $49$36Oct '25Jan '26AprJulOct '26
YTD +44.0%. 52-week range $23–$49.
Share Price — 12 Months
$30$40$5052-wk high $49$36Oct '25Jan '26AprJulOct '26
YTD +44.0%. 52-week range $23–$49.
The Numbers

The Model

The model projects next fiscal year's revenue of $3.77B and EBITDA of $702M, an 18.6% margin, and the following fiscal year's revenue of $4.20B and EBITDA of $831M, a 19.8% margin. The near term rests on the demand acceleration management has described in Electronics and on the two acquisitions already inside the numbers — Micromax at roughly $130M of Q2 2026 reported sales and EFC at $16M with a second-half ramp guided. The following fiscal year depends on the two products management has dated: Cuprion reaching material revenue in 2027 and a "very robust" 2028, and advanced packaging ramping as processes of record convert.

Revenue & EBITDA Projections
REVENUE$2.6B$3.8B$4.2BFY25Next FY (E)FY after (E)EBITDA & MARGIN$493M$702M$831MFY25Next FY (E)FY after (E)
REVENUE$2.6B$3.8B$4.2BFY25Next FY (E)FY after (E)EBITDA & MARGIN$493M$702M$831MFY25Next FY (E)FY after (E)
Solid bars are reported actuals; outlined bars are model projections — not company guidance.
MetricFY2025Next FY (E)FY after (E)
Revenue$2.6B$3.8B$4.2B
YoY Growth—+47.9%+11.2%
EBITDA$493M$702M$831M
EBITDA Margin19.3%18.6%19.8%

Projections are the median of 5 independent model runs.

What Could Go Right — and Wrong

What good looks like
  • Cuprion converts to revenue: management points to material revenue in 2027 and profit contribution, with 2028 described as "very robust," and the year-end 2027 capacity outlook was raised materially during Q2 2026.
  • Advanced packaging moves from "several hundred million dollars of revenue" to a quantified, named line as processes of record established with OSATs ramp.
  • The margin reaches its stated long-term target in reported numbers if above-target incentive compensation accruals normalize and non-metal raw material inflation is recaptured.
  • Net leverage reaches roughly 2.5x by year-end 2026, restoring balance-sheet room.
  • Customer forecasts rising over a 6- to 12-month horizon convert into continued double-digit Electronics organic growth.
What could go wrong
  • Electronics organic growth slows below the Q1-to-Q2 pace, particularly in Semiconductor Solutions, which grew 31% organically in Q2 2026.
  • Raw material and logistics inflation is not recaptured through pricing and sourcing; the Q1 2026 call put the unmitigated exposure at "tens of millions of dollars of risk."
  • Customer-side component constraints — memory, substrates and PCBs — gate demand before Element's chemistry is consumed.
  • MKS Instruments and Qnity win the 2027–2028 advanced packaging and thermal ramp both are scaling capacity for.
  • Cuprion displaces silver-based revenue Element already sells rather than adding new revenue; management described it as "a substitution. copper instead of silver."
What’s Next

Looking Ahead

The next twelve months turn on whether the electronics demand acceleration holds and whether the two dated product ramps stay on schedule. Management's stated half-two 2026 assumption is roughly flat sequential performance from Q2 to Q3 — continued strong electronics demand, no smartphone seasonal ramp, raw material and logistics inflation, and a modest Micromax softening — followed by normal fourth-quarter seasonality, and on Aug 27, 2026 the company said its momentum remains in line with its guidance. Cuprion's second Fremont site is targeted for the middle or latter part of 2027, with a third site in Connecticut under construction, and advanced packaging processes of record are expected to ramp in about 18 months from July 2026.

Catalysts
  • Q3 2026Q3 adjusted EBITDA guide — Tests the flat-sequential assumption.
  • H2 2026EFC second-half ramp — Management guides a substantially larger back half after $16M in Q2.
  • FY2026Full-year guidance delivery — Adjusted EBITDA $690–710M and adjusted EPS growth of ~20%.
  • Year-end 2026Net leverage target — Tests the ~2.5x net leverage target.
  • 2027Cuprion material revenue — Management targets material revenue and profit contribution in 2027.
  • 2027–2028Advanced packaging ramp — Processes of record expected to ramp about 18 months from July 2026.
Numbers

Financials

Annual Summary

MetricFY2024FY2025TTMYoY
Revenue$2.5B$2.6B$3.2B+3.8%
Gross Margin42.2%42.0%38.4%20bps
EBITDA$502M$493M$559M-1.6%
EBITDA Margin20.4%19.3%17.7%107bps
Net Income$244M$191M$179M-21.9%
Free Cash Flow$295M$228M$132M—
Net Debt——$1.9B—

Net Debt = total debt minus cash and short-term investments at Jun 30, 2026. A company’s own leverage measure can differ.

Key Ratios (Trailing)

Valuation
  • P/E TTM—
  • EV/EBITDA TTM—
  • EV/Revenue TTM—
  • Price/FCF TTM—
Profitability
  • Gross Margin (TTM)38.4%
  • EBITDA Margin (TTM)17.7%
  • Net Margin (TTM)5.7%
  • ROIC6.6%
  • FCF Conversion23.6%
  • SBC / Revenue1.5%
Reference

The Company

Element Solutions is a global specialty chemicals technology company. It formulates chemistries and material process technologies that enhance the performance of other companies' products across consumer electronics, power electronics, semiconductor fabrication, high-performance computing, communications and data-storage infrastructure, automotive systems, industrial surface finishing and offshore energy. For AI hardware, that means thermal interface materials for high power consumption applications such as AI GPUs and CPUs, advanced packaging solutions for OSATs in Asia including wafer-level packaging, power-electronics products with expanding applications in data-center power modules, high-reliability alloys and engineered preforms for data-center assembly, and metallization solutions for high-layer-count server boards.

The company reports in two segments. Electronics covers Assembly, Circuitry and Semiconductor Solutions; Specialties covers Industrial and Energy Solutions. At Dec 31, 2025 it operated 47 manufacturing facilities, 11 of which include research facilities, plus 8 stand-alone research centers; 7 of the manufacturing facilities are in the U.S., with the remainder primarily in Asia and Europe. Management describes a capital-light model — capex under 3% of sales. Element is an acquisitive roll-up whose predecessor names management lists as McDermott, Anthem, Alpha, Micromax, EFC, Covendia, Kester, HK Wentworth, OM Group, Polytechnic and Cuprion; Micromax (precious-metal materials) and EFC Gas and Advanced Materials both closed in the first quarter of 2026.

Business Segments

Electronics
+20% organic in Q2 2026
Specialty chemicals and materials for electronics hardware, from printed circuit boards to advanced semiconductor packaging.
Growth driver: AI build-out; advanced packaging and thermal
Specialties
Industrial +3%, Offshore +1% organic in Q2 2026
Industrial metal and plastic finishing chemistries, plus specialized fluids for offshore energy in deep-water production and drilling.
Growth driver: European industrial recovery and offshore timing
Cuprion
Unsized; "material revenue in 2027"
A differentiated copper-based material for thermal management, power delivery and plating copper on challenging substrates.
Growth driver: Substitution for silver; hyperscaler thermal demand

Competitive Landscape

The 10-K names the company's most significant Electronics competitors as MKS Instruments, Qnity Electronics, Inc., Henkel Corporation, Senju Metal Industry Co. and Uyemura International, and its Specialties competitors as MKS Instruments, Quaker Houghton and Castrol. Management says switching costs in its chemistry are "really high" and that switching is "very uncommon in our industry," with Element's vector being throughput — letting customers increase production. The record also shows share gains from smaller competitors that lack the balance sheet to float metal and absorb payment terms, which management itself declines to treat as durable. Two named competitors are scaling capacity in the same AI lanes for 2027–2028.

  • MKS Instruments
    It is named in both the Electronics and Specialties competitor lists in the 10-K. A neighboring company's own earnings call suggests Electronics and Packaging revenue was $381M, up 44% y/y, with visibility extending through 2027 and a Guangzhou equipment-factory capacity doubling.
  • Qnity Electronics, Inc.
    The company is named in the Electronics competitor list, and a Qnity filing names Element Solutions as a competitor. A neighboring company's call refers to a company labeled "Q" — which appears to map to Qnity — whose advanced packaging, AI PCB and thermal platforms grew more than 50% y/y.
  • Henkel Corporation
    Named in filings; not discussed.
  • Senju Metal Industry Co.
    Named in filings; not discussed.
  • Uyemura International
    Named in filings; not discussed.
All competitor names are documented in the 10-K filed Feb 18, 2026; the reciprocal Qnity-side filing is also quoted. Specialties competitors Quaker Houghton and Castrol are also named in the 10-K but not discussed. Read-across figures from neighboring companies are those competitors' own results, not ESI statements, and we found no neighboring company that named ESI directly on its latest call.

Supply Chain

Element sits upstream of the AI build-out as a chemistry supplier: it sells materials into data-center hardware but owns no data centers. We found no neighboring company that named ESI on its latest call, so the customer links below are our inferences rather than confirmed relationships.

Supplier
Argon, helium, hydrogen, nitrogen, oxygen — inferred, not disclosed.
Supplier
Plating accelerators, levelers, suppressors, copper sulfate — inferred
Supplier
Copper for electronics chemistry and Cuprion nano-copper — inferred
→
High switching costs on critical chemistry
ESI
Capital-light formulation and manufacturing; capex under 3% of sales
→
Hyperscalers
Named as a demand source for thermal interface materials, not as contracted counterparties
Electronics manufacturers (inferred)
26 inferred customer edges
An automatically generated map of likely relationships appears to list semi fabs, PCB fabs, OSATs and EMS firms.

Analysis updated Oct 19, 2026, reviewing Q2 FY2026. Prices delayed. Built with The Buildout’s published methodology. Not investment advice. No positions held. © The Buildout 2026.

More on ESI: Earnings recap