Ralliant Corp (RAL) | The Buildout — AI Infrastructure
The Verdict
Ralliant designs, develops, manufactures and services precision instruments through two segments. Test and Measurement sells the tools engineers use to validate electronics — oscilloscopes, probes, source measuring units, semiconductor test systems, high-power bi-directional power supplies and measurement software, under brands including Tektronix and Keithley. Sensors and Safety Systems sells monitoring and protection gear for high-voltage grid assets, ignition safety systems and energetic materials for defense and space missions such as satellite deployment and rocket propulsion, and premium industrial sensors, under brands including Qualitrol, Gems Setra and PacSci EMC. In the AI buildout Ralliant is an enabler rather than a protagonist: its instruments validate the semiconductors and power electronics that go into data centers, and its sensors watch the grid and the cooling that keep them running. The company reports no AI segment, no AI revenue line and no AI backlog; AI reaches it as a cross-cutting demand accelerant layered on top of electrification and defense, while its defense components carry no direct AI linkage.
| Market Cap | — |
| Revenue (TTM) | $2.2B |
| Revenue Growth | +5.9% |
| EBITDA Margin (TTM) | 18.1% |
| Net Debt | $879M |
| Earnings Beats | 5 of 5 |
| P/E (TTM) | — |
| EV/EBITDA (TTM) | — |
What We Like
- Defense & Space backlog passed $1 billion, spanning more than 40 programs and converting over 2–3 years, with a $27.3M Defense Production Act Title III award to PacSci EMC funding Arm Fire Device production.
- Test and Measurement returned to growth in Q1 at +8.7% organic, with the highest quarterly book-to-bill since 2022 at 1.1x–1.2x.
- The enterprise productivity program targets $50–60M of run-rate annualized savings by 2028, up from a prior $9–11M program, with roughly $20M actioned to date.
- Capital returns widened: the authorization was raised to $500M, a $100M accelerated share repurchase was planned for Q2 2026, and the company targets about 50% of free cash flow returned.
- Full-year 2026 guidance was raised in Q1 across all metrics and raised again on Jul 30, 2026 — a second consecutive raise.
What We’re Watching
- Defense products carry below-company-average margins, and management says quarters will be lumpy on both revenue and margin — mix works against the margin rate as defense scales.
- Test and Measurement has only 90–120 days of visibility, so the guidance raise leans on orders rather than a long contracted backlog.
- Semiconductor revenue fell high single digits in Q1 on lapping a large-customer credit; management expects that headwind fully lapped by Q4 2026.
- The 10-K discloses dependence on single or limited-source suppliers for some qualified components, with the counterparty unnamed, and about $25M of 2026 tariffs are assumed to be fully offset.
The thesis is strengthening. Two consecutive guidance raises, a defense backlog quantified above $1 billion for the first time, a return to growth in the previously declining segment and a productivity program roughly five times the size of its predecessor all point the same direction. The tension to underwrite sits in margin: the fastest-growing business is the below-average-margin one, and management's forward statements on defense growth beyond 2026 range from mid-single digit to double-digit plus. The open question is which of those governs 2027.
Earnings Beat
The latest reported quarter is Q2 2026, released Jul 30, 2026. Revenue was $568 million, up 13% year over year on both a total and an organic basis — an acceleration from Q1's +11%. Gross margin was 51.6%. Net earnings were $57 million and adjusted net earnings $76 million, with a net earnings margin of 10.1%, up 60 basis points year over year. Management raised full-year guidance for the second consecutive quarter.
| Metric | Q2 FY2026 | Q1 FY2026 | Q2 FY2025 | YoY |
|---|---|---|---|---|
| Revenue | $568M | $535M | $503M | +12.8% |
| Gross margin | 51.6% | 50.9% | 45.0% | +660bps |
| EBITDA | $112M | $97.8M | $87.5M | +28.2% |
| EPS (GAAP) | $0.51 | $0.39 | $0.42 | +20.3% |
No surge demand is in that current backlog. This is just real orders from customers for replenishment.— Tamara (Tammy) Newcombe, President & CEO, May 12, 2026
Management tone: The deepest record we reviewed is the Q1 FY2026 call on May 12, 2026, where management was confident and specific on the things it changed: it raised full-year guidance across all metrics, quantified the defense backlog above $1 billion for the first time, raised the cost-savings target from $9–11M to a $50–60M multiyear program, and expanded the buyback authorization to $500M with a $100M accelerated repurchase planned for Q2. It was deliberately measured on the second half, repeatedly citing uncertainty in the environment and guiding revenue to roughly a 49/51 H1/H2 split against a normal 48/52. In Q&A management was direct and mostly quantified, and it disclosed the awkward parts: defense carries below-company-average margins, the backlog is replenishment rather than surge demand, and Test and Measurement has only 90–120 days of visibility. Management attributed the guidance raise to orders and book-to-bill rather than the in-quarter beat. We found no Q2 2026 transcript, so we could not provide Q2 commentary. One unresolved point: management gave three different versions of out-year defense growth — toward the high end of the 3–5% through-cycle organic range, "double-digit plus" in year and the out-years, and mid-single digit beyond 2026.
Management Guidance
Full-year 2026 guidance as raised on May 12, 2026: revenue $2.185B–$2.245B, adjusted EBITDA margin 19.5%–20.5%, adjusted EPS $2.53–$2.69, enterprise productivity in-year savings of $10–12M, net interest expense consistent with Q2 guidance of $14M–$16M, an adjusted effective tax rate of 16%–18%, and weighted average diluted shares of 111–112M, with share repurchases representing about 50% of free cash flow. The guidance assumes tariffs based on policy announcements as of May 8, 2026, which the company expects to fully offset, and excludes potential tariff refunds. Management raised full-year guidance again on Jul 30, 2026; we did not have those updated figures. The standalone Q2 2026 guide was revenue $540M–$556M, adjusted EBITDA margin 18.5%–19.5% and adjusted EPS $0.58–$0.64; actual Q2 revenue of $568M and adjusted EPS of $0.68 came in above those ranges.
Trajectory
Revenue is moving up. Q1 FY2026 revenue was $534.6M, +11.0% reported and +8.8% organic; Q2 2026 revenue was $568M, +13% on both a total and organic basis. The code-computed trend reads accelerating, though the trailing four-quarter average growth rate is only +1.2%, reflecting a softer prior-year base. The composition of Q1 growth was +6.9% volume, +1.9% price and +2.2% FX, and both segments grew organic revenue at roughly the same rate. Gross margin went from 46.5% in Q4 FY2025 to 50.9% in Q1 FY2026 and 51.6% in Q2, and the code-computed margin signals show gross margin expanding 510 basis points, operating margin 480 and EBITDA margin 440. The preceding quarter carried a large reported net loss: Q4 FY2025 net income was negative $1.37B.
The Model
The model projects next fiscal year's revenue of $2.31B and EBITDA of $474M, a 20.5% margin, then the following fiscal year's revenue of $2.50B and EBITDA of $565M, a 22.6% margin. The near-term anchor is the set of things management has guided to: Test and Measurement returning to growth, defense backlog converting over its 2–3 year window, and the first $10–12M of productivity savings landing in 2026. The following fiscal year is where the productivity program does most of the work — $50–60M of run-rate savings by 2028 is the stated path to the midpoint of the through-cycle margin range, and that is what lifts EBITDA margin from 20.5% to 22.6% while revenue grows more slowly.
| Metric | FY2025 | Next FY (E) | FY after (E) |
|---|---|---|---|
| Revenue | $2.1B | $2.3B | $2.5B |
| YoY Growth | — | +11.7% | +8.2% |
| EBITDA | $373M | $474M | $565M |
| EBITDA Margin | 18.0% | 20.5% | 22.6% |
Projections are the median of 5 independent model runs.
What Could Go Right — and Wrong
- Defense backlog converts faster than the 2–3 year frame, or surge demand beyond today's replenishment orders enters the book.
- Test and Measurement book-to-bill stays above 1.1x–1.2x and the semiconductor large-customer lap clears by Q4 2026 without a demand air pocket.
- Utilities record orders convert to revenue once the shipment-timing issue clears, restoring the premium-margin segment's contribution to mix.
- The productivity program hits its milestones — $10–12M in 2026, an exit run-rate around $20M, and $50–60M by 2028.
- AI-linked demand stays in double digits across Diversified Electronics, grid sensors and data-center cooling, and management begins reporting AI-related orders or revenue separately.
- Defense growth decelerates to mid-single digit beyond 2026, as one of management's own forward statements implies, and the below-average-margin mix dilutes the company margin rate.
- Second-half macro or supply disruption bites and the short-cycle Test and Measurement order recovery fades.
- The semiconductor headline stays weak past Q4 2026, or underlying demand does not reaccelerate after the large-customer lap.
- Utilities shipment timing extends beyond one quarter, keeping the premium-margin segment from contributing to mix.
- The roughly $25M of 2026 tariffs is not fully offset, or sole and limited-source components constrain the defense and utility capacity ramp.
Looking Ahead
The next 12 months turn on three things: whether the defense backlog converts faster than its 2–3 year frame, whether the Test and Measurement order recovery holds long enough for the semiconductor lap to clear by Q4 2026, and whether the productivity program hits its milestones — $10–12M of in-year savings in 2026, an exit run-rate around $20M, and $50–60M by 2028. Physical capacity is being added alongside: a precision sensor facility expansion in Upstate New York announced for later in 2026, and defense and utility capacity investments starting in 2026 for 2028 and beyond, funded by capital expenditure guided to 2–3% of revenue. Q2 delivered revenue of $568M and adjusted EPS of $0.68, both above the company's own Q2 guide, and management raised full-year guidance again on Jul 30, 2026.
- By Q4 2026Semiconductor headwind clears — Large-customer credit fully lapped; headline semi revenue normalizes.
- Later in 2026Upstate NY facility expansion — Precision sensor capacity build; no spend or size disclosed.
- Exit 2026Productivity run-rate ~$20M — Annualized savings target; $10–12M of in-year savings expected.
- End of 2027Productivity actions complete — Remaining enterprise productivity program actions finished.
- By 2028$50–60M savings run-rate — Alongside adjusted EBITDA margin to the through-cycle midpoint.
Financials
Annual Summary
| Metric | FY2024 | FY2025 | TTM | YoY |
|---|---|---|---|---|
| Revenue | $2.2B | $2.1B | $2.2B | -4.0% |
| Gross Margin | 51.6% | 46.1% | 48.9% | 555bps |
| EBITDA | $571M | $373M | $395M | -34.7% |
| EBITDA Margin | 26.5% | 18.0% | 18.1% | 848bps |
| Net Income | $303M | −$1.2B | −$1.2B | -503.5% |
| Free Cash Flow | $420M | $358M | $328M | — |
| Net Debt | — | — | $879M | — |
Net Debt = total debt minus cash and short-term investments at Jul 3, 2026. A company’s own leverage measure can differ.
Key Ratios (Trailing)
- P/E TTM—
- EV/EBITDA TTM—
- EV/Revenue TTM—
- Price/FCF TTM—
- Gross Margin (TTM)48.9%
- EBITDA Margin (TTM)18.1%
- Net Margin (TTM)-56.4%
- ROIC9.0%
- FCF Conversion82.9%
- SBC / Revenue3.0%
The Company
Ralliant designs, develops, manufactures and services precision instruments and highly engineered products. Two reportable segments carry the business. Test and Measurement provides precision instruments, systems, software and services — oscilloscopes, probes, source measuring units, semiconductor test systems, high-power bi-directional power supplies and measurement analysis software packages, sold under brands including Tektronix and Keithley. Sensors and Safety Systems provides advanced monitoring, protection and diagnostic solutions for high-voltage electrical assets in power generation, transmission and distribution; energetic materials, ignition safety systems and precision pyrotechnic devices used in satellite deployment, rocket propulsion initiation, aerial vehicle safety systems and military defense; and premium sensing products covering liquid level, flow, pressure, motion and hygienic applications, under brands including Qualitrol, Gems Setra and PacSci EMC. In Q1 FY2026, Sensors and Safety Systems was $324.4M of revenue, 60.7% of the total, and Test and Measurement was $210.2M, 39.3%, both calculated from the 10-Q segment table.
Ralliant is a recent spin-out with a stated Tax Matters Agreement with Fortive under which it agreed to pay approximately $51.0 million, substantially all paid in 2025. It is headquartered in Raleigh, North Carolina, and employs approximately 7,000 research and development, manufacturing, sales, distribution, service and administrative employees. It runs an internal operating system called the Ralliant Business System, which management presents as both a growth enabler and the vehicle for productivity savings, and it has an AI foundry inside that office folded into the enterprise productivity program. Sales derived from customers outside the United States were 46.5% of Q1 FY2026 revenue, and capital expenditure is guided to 2–3% of revenue to fund physical capacity in defense and utilities.
Business Segments
Competitive Landscape
Ralliant competes in two very different fields. Its 10-K states that the main Test and Measurement competitors include Keysight Technologies, Rohde & Schwarz, Ametek and Teledyne Technologies, among others — a field with much larger T&M operators, where Ralliant's segment ran an 11.9% adjusted EBITDA margin in Q1 FY2026. For Sensors and Safety Systems the 10-K names Esco Technologies, Ensign-Bickford Aerospace & Defense, Endress+Hauser, ifm Efector and Brooks Instrument, among others. Management positions the company as a key supplier to the majority of the Pentagon's priority munitions programs and plays up the power grid as a strategic imperative, but the filings describe a competitive field rather than an exclusive position.
- Keysight TechnologiesRalliant's 10-K names it as a main Test and Measurement competitor. Other companies' calls suggest record FY2026 Q3 orders of $2.091B, +56% reported, revenue $1.846B, +36%, and a 69% gross margin.
- Teledyne TechnologiesRalliant's 10-K names it as a main Test and Measurement competitor. Other companies' calls suggest orders exceeded sales for an 11th consecutive quarter, with book-to-bill of 1.23 and a funded backlog around $5B.
- AmetekRalliant's 10-K names it as a main Test and Measurement competitor. Other companies' calls suggest record Q2 sales of $2.04B, +15%, orders of $2.3B, +28%, a $4.11B backlog and a 27.1% core margin.
- Rohde & SchwarzNamed in the 10-K as a main Test and Measurement competitor; not discussed further.
- Esco TechnologiesNamed in the 10-K as a main Sensors and Safety Systems competitor; not discussed further.
Supply Chain
Ralliant sits between component and semiconductor suppliers and the defense, utility, semiconductor and electronics customers that buy its instruments and sensors. We found no neighboring company's earnings call that mentioned Ralliant by name, so the chain below rests on its own filings plus lower-confidence relationship data.
Related companies
See all Chip Making companies → · How this layer works: Chapter 1, The Chip →