Rogers Corporation (ROG) | The Buildout — AI Infrastructure
The Verdict
Rogers Corporation makes high-performance engineered materials and components that go into other companies' products — it does not sell servers, switches or vehicles itself. Its Advanced Electronics Solutions segment supplies circuit materials, ceramic substrates, busbars and cooling solutions, and that is where the AI data-center link sits: microchannel coolers for high-power chips and high-frequency circuit materials for next-generation AI server architectures. Its Elastomeric Material Solutions segment makes silicone, polyurethane and PTFE materials used for sealing, cushioning and thermal management. The company sits upstream of OEMs and module and PCB fabricators, with materials often specified early in a design, where qualification and reliability requirements raise the cost of switching. Management says current AI-specific revenue is de minimis.
| Market Cap | — |
| Revenue (TTM) | $827M |
| Revenue Growth | +3.9% |
| EBITDA Margin (TTM) | 14.7% |
| Net Cash | $211M |
| Earnings Beats | 5 of 7 |
| P/E (TTM) | — |
| EV/EBITDA (TTM) | — |
What We Like
- Revenue is accelerating: +5% YoY in Q1 2026, +6.9% in Q2, and a Q3 guide of roughly +10% at the midpoint, with all four end markets guided to grow.
- Profitability is improving: Q2 2026 adjusted EBITDA was 17.3% of sales, up 550 bps YoY; the Q3 guide midpoint implies 19.7%, up 250 bps.
- Revenue quality flipped: Q2's +6.9% was roughly two-thirds demand and mix, versus Q1's +5%, which carried $7.9M of FX benefit.
- Cost self-help is under way: the German Curamik restructuring targets $13M of annualized savings by Q4 2026, with some savings already in the P&L.
- The balance sheet is strong: cash plus short-term investments topped $211M at Q2, with Q2 operating cash flow of $24.4M versus $5.8M in Q1.
What We’re Watching
- Gross-margin expansion is compressing: +230 bps in Q1 2026, +90 bps in Q2, and only about +20 bps guided for Q3, held back by ~85 bps of China ceramic underutilization plus commodity costs.
- AI data-center revenue stays 'not significant' in 2026, with meaningful revenue framed to roughly Q3/Q4 2027 depending on customer qualification.
- The FY2026 non-GAAP tax rate was raised to about 32% from about 30%, an earnings headwind.
- The $45M cumulative cost-savings total was not repeated on the Q2 call; only the $13M Curamik program was reaffirmed.
The thesis is strengthening on the core business while the AI piece remains a pre-revenue option. Revenue is accelerating across a broad set of end markets, profitability is improving year over year, and the permanent CEO appointment removed a leadership overhang. But margin expansion is compressing even as revenue accelerates, and the Q2 earnings miss was mostly recurring-leaning cost pressure rather than the one-time fire management flagged. The open question is whether the September 30 Investor Day puts a number on the AI data-center opportunity or leaves it as sampling.
Earnings Miss
Rogers reported Q2 2026 sales of $216.8M, up 6.9% YoY and above the guidance midpoint. Gross margin was 32.5%, up 90 bps YoY. Adjusted EBITDA was $37.6M, or 17.3% of sales, up 550 bps YoY. Adjusted EPS was $0.92, up 171% YoY but below the guidance midpoint. Management put the cumulative EPS impact of supply-chain pressure, a one-time facility fire and higher operating expenses at more than $0.10, with roughly 70%–80% of it from raw material, freight and operating expenses.
| Metric | Q2 FY2026 | Q1 FY2026 | Q2 FY2025 | YoY |
|---|---|---|---|---|
| Revenue | $217M | $200M | $203M | +6.9% |
| Gross margin | 32.5% | 32.2% | 31.6% | +90bps |
| EBITDA | $33.2M | $30.1M | −$53.6M | −161.9% |
| EPS (GAAP) | $0.74 | $0.24 | −$4.00 | −118.5% |
| Adjusted EBITDA | $37.6M (17.3%) | $32.0M (16.0%) | n/a | +550 bps margin YoY |
We have not seen anything negative at all.— Ali El-Haj, President and CEO, Jul 28, 2026
Management tone: On the Q2 2026 call, management described the growth as structural and share-driven rather than seasonal, guided to acceleration in Q3, and stayed granular on the things going wrong — quantifying the China underutilization headwind, the freight and commodity pressure, and the split of the EPS impact. Management repeatedly deferred specifics on data-center size, other EV/auto programs and M&A to the September 30 Investor Day. The call was also the first with Ali El-Haj as permanent President and CEO, after an interim period.
Management Guidance
For Q3 2026, management guided revenue of $233–243M (midpoint about +10% YoY), gross margin of 33.2%–34.2% (midpoint about +20 bps YoY), adjusted EPS of $1.10–$1.30 (midpoint $1.20 versus $0.90 in Q3 2025), and adjusted EBITDA of $44–50M (19.7% margin at the midpoint, +250 bps YoY), with growth in all four end markets. The gross-margin guide includes about 85 bps of China ceramic underutilization headwind plus commodity cost pressure. For full-year 2026, management guided capex of $30–35M (narrowed from $30–40M) and a non-GAAP tax rate of about 32% (raised from about 30%).
Trajectory
Revenue has moved from $200.5M in Q1 2026 to $216.8M in Q2, an 8.1% sequential increase, after quarters that were roughly flat to down. The code-computed signals label revenue accelerating and gross and operating margins expanding. Gross margin rose from 29.9% in Q1 2025 to 32.2% in Q1 2026 and 32.5% in Q2 2026, up 90 bps YoY in Q2, though the pace of expansion is slowing. Management attributes the demand to share gains and new programs ramping later in 2026 and into early 2027, and guides to roughly +10% YoY for Q3.
The Model
The model projects next fiscal year's revenue of $885M and EBITDA of $151M, a 17.1% margin, and the following fiscal year's revenue of $981.5M and EBITDA of $191M, a 19.5% margin. The near term is anchored by the guided Q3 acceleration and broadening end-market demand. The following fiscal year assumes the design wins launching late 2026 into 2027 convert to revenue and that margin expansion continues from the Curamik savings and improving factory utilization.
| Metric | FY2025 | Next FY (E) | FY after (E) |
|---|---|---|---|
| Revenue | $803M | $885M | $982M |
| YoY Growth | — | +10.2% | +10.9% |
| EBITDA | $17.1M | $151M | $191M |
| EBITDA Margin | 2.1% | 17.1% | 19.5% |
Projections are the median of 5 independent model runs.
What Could Go Right — and Wrong
- AI data-center sampling converts to design wins and production orders on the ~Q3/Q4 2027 timeline, making data center a disclosable revenue driver.
- The September 30 Investor Day puts a data-center TAM or multi-year financial objectives on the table.
- China ceramic design wins launching late Q3 2026 into Q1 2027 clear the utilization headwind and lift gross margin.
- Defense backlog converts to revenue in Q3/Q4 2026, delivering the promised significant aerospace and defense growth.
- Commodity and freight pressures ease and pass-through pricing is agreed with customers.
- Data-center qualification slips again and the design-award decision stays unconfirmed past 2026.
- Gross margin stays flat or contracts as China underutilization and commodity costs outrun pass-through.
- The Q2 earnings miss proves more recurring than one-time, with raw material, freight and operating costs persisting.
- EV battery orders stay weak and the expected stronger second-half EV sales do not materialize.
- Defense orders fail to convert, undercutting the Q3 all-four-end-market growth guide.
Looking Ahead
The next twelve months turn on a few telegraphed events. Q3 2026 results test the roughly +10% revenue guide and the claim that all four end markets grow. The September 30 Investor Day is the scheduled venue for AI data-center and vehicle-electrification detail plus capital allocation and long-term financial plans. China ceramic design wins are slated to launch late Q3 2026 into Q1 2027. Management also pointed to a possible M&A announcement within 'the next quarter or so,' and kept meaningful data-center revenue framing at roughly Q3/Q4 2027.
- Late Q3 2026China ceramic launches — Design wins launch into Q4 and Q1 2027; tests utilization.
- Q3 2026Q3 results — Tests the roughly +10% revenue guide and all four end markets.
- Q3/Q4 2026Defense recovery — Tests the promise of significant second-half aerospace and defense growth.
- Quarter or so from July 2026Possible M&A — Management said it hopes to share something within that window.
- Q3/Q4 2027Data-center revenue — Meaningful data-center revenue framed to roughly then.
Financials
Annual Summary
| Metric | FY2024 | FY2025 | TTM | YoY |
|---|---|---|---|---|
| Revenue | $830M | $803M | $827M | -3.2% |
| Gross Margin | 33.4% | 31.0% | 31.8% | 235bps |
| EBITDA | $74.3M | $17.1M | $122M | -77.0% |
| EBITDA Margin | 9.0% | 2.1% | 14.7% | 682bps |
| Net Income | $26.1M | −$61.8M | $31.3M | -336.8% |
| Free Cash Flow | $71.0M | $101M | $113M | — |
| Net Cash | — | — | $211M | — |
Net Cash = total debt minus cash and short-term investments at Jun 30, 2026. A company’s own leverage measure can differ.
Key Ratios (Trailing)
- P/E TTM—
- EV/EBITDA TTM—
- EV/Revenue TTM—
- Price/FCF TTM—
- Gross Margin (TTM)31.8%
- EBITDA Margin (TTM)14.7%
- Net Margin (TTM)3.8%
- ROIC5.4%
- FCF Conversion92.8%
- SBC / Revenue-0.4%
The Company
Rogers Corporation designs, develops, manufactures and sells high-performance and high-reliability engineered materials and components, as it describes itself in its 10-K. It operates two strategic segments — Advanced Electronics Solutions (AES) and Elastomeric Material Solutions (EMS) — plus a smaller Other segment. AES makes circuit materials, ceramic substrate materials, busbars and cooling solutions for applications including aerospace and defense radar, wireless infrastructure, power electronics and data-center thermal management. EMS makes polyurethane, silicone, PTFE and UHMWPE materials under brands such as PORON and ARLON for sealing, cushioning, vibration management and thermal uses. Because the materials are often specified early in a design, qualification and reliability requirements can make replacement costly.
Rogers operates a global manufacturing footprint. Its 10-K lists 24 facilities, offices and warehouses across the United States, Germany, Belgium, Hungary, England, China and South Korea. Its largest owned site is in Suzhou, China, at 682,000 square feet; other large owned sites include Rogers, Connecticut (388,100 square feet), Carol Stream, Illinois (216,600) and Eschenbach, Germany (149,000). Innovation Centers sit in Chandler, Rogers CT, Eschenbach and Suzhou. Management has said capacity is sufficient for roughly the next six to eight quarters with no major new investment, and that customers shifting production regionally favor Rogers' ability to supply Europe from Europe, North America from North America and Asia from Asia.
Business Segments
Competitive Landscape
We found no Rogers-disclosed description of its competitive position. The inferred competitors — among them high-speed digital laminate makers, ceramic-substrate suppliers and liquid-cooling specialists — all come from sources with no documented quotes, so they are directional rather than confirmed. We found no ROG disclosure confirming competitive share or pricing in these markets.
- 6752.TInferred competitor: high-speed digital laminates (Megtron series). We found no discussion of it by Rogers.
- Isola GroupInferred competitor: high-speed digital laminates for networking PCBs. We found no discussion of it by Rogers.
- BOYDInferred competitor: cold plates for data center liquid cooling. We found no discussion of it by Rogers.
- CoolIT SystemsInferred competitor: direct-to-chip liquid cooling cold plates. We found no discussion of it by Rogers.
- Heraeus ElectronicsInferred competitor: DBC/AMB ceramic substrates for automotive-grade power modules. We found no discussion of it by Rogers.
Supply Chain
Rogers sits upstream of OEMs and module and PCB fabricators, supplying specialty materials and components. Its only documented supply-chain relationship is an unnamed sole or limited-source supplier of certain key raw materials, including commodities. Named counterparties elsewhere are inferred, not confirmed.
More on ROG: Earnings recap