Stantec Inc. (STN) | The Buildout — AI Infrastructure

——Mkt cap — · 52-wk —–— · YTD — · delayed
Updated Oct 19, 2026Q2 FY2026 reviewed
Stantec designs and engineers data centers, water systems and industrial facilities for the AI infrastructure buildout.
Backlog $9.2B
Record contract backlog, up 17.5% y/y and 7% organically.
Adj. EBITDA 18.7%
Record Q2 adjusted EBITDA margin, up 90 bps year over year.
EPS +18.4%
Adjusted EPS of $1.61, up 18.4% year over year.
U.S. organic flat
Full-year organic guidance cut to mid-single-digit.
The Buildout Takeaway
Together the numbers say the profit engine is running ahead of the top line: margins and backlog are at records while organic growth has slowed enough that management lowered its organic guide for the year. The plan now leans on a second-half acceleration in the U.S. and Canada that management describes as a timing issue rather than a demand issue, and that it had not yet proven when it guided.
18 analysts·6 Buy11 Hold1 Sell
Coverage is thin — no price estimates on file, so no target is shown

FY2026 net revenue growth 8.5%-11.5% · adjusted EBITDA margin 17.8%-18.3% · adjusted EPS growth 15%-18% · organic net revenue growth mid-single-digit · excludes additional acquisitions.
Important: The Buildout is a data analytics platform. Content is generated by algorithms and AI agents using public filings, earnings transcripts, and market data. This is not personalized investment advice.
Our View

The Verdict

Stantec is a global design and engineering firm. Its teams plan, design and manage infrastructure projects — data centers, water and wastewater plants, transit lines, and energy and resource facilities. In the AI build-out its role is derivative rather than direct: it does not build or own compute, but its Buildings group designs the hyperscale campuses and semiconductor plants that AI workloads run in, and its Water business covers the cooling and process water those sites need. It sells professional services, not hardware or assets, so its economics depend on billable people, project pricing and utilization.

Market Cap—
Revenue (TTM)$5.8B
Revenue Growth+12.3%
EBITDA Margin (TTM)15.0%
Net Debt$1.7B
Earnings Beats5 of 7
P/E (TTM)—
EV/EBITDA (TTM)—

What We Like

  • Adjusted EBITDA margin has expanded year over year for roughly seven consecutive quarters, reaching a record-for-a-second-quarter 18.7% in Q2 2026, with the trailing-12-month margin at 18%.
  • Contract backlog has set records in three straight reporting periods — $8.6B at FY2025, $9.0B in Q1 2026 and $9.2B in Q2 2026 — about 13 months of work, and management says framework programs with large not-to-exceed values sit outside backlog.
  • Global has become the growth engine: about 13% organic in Q2 2026, with the UK near 15%, Germany in the low-20s and Latin America over 50%, and FY2026 guidance for the segment at high single-digit organic.
  • Work is bundling up: average projects of roughly $100K-$200K are giving way to programs of $100M-$200M running 3-5 years, where management says the bidder set narrows to the big majors and pricing power appears on some jobs.
  • Capital allocation runs on two levers at 1.3x net debt to adjusted EBITDA — M&A stays priority one, and the NCIB ceiling was raised from 2% to 5% in August 2026 after about $175M of repurchases in Q2.

What We’re Watching

  • U.S. organic growth was flat in Q2 2026 and 3.4% for FY2025 against a mid-single-digit target; the full-year U.S. guide implies high-single-digit organic growth in H2, which management expects but had not yet shown.
  • The FY2026 margin guide implies only about 15 bps of full-year expansion after roughly 80 bps in H1, because management plans to add headcount to convert backlog; it described the guide as carrying some conservatism.
  • Cash conversion is soft: H1 2026 operating cash flow was $116M after a Q1 outflow, and DSO was 75 days, at the high end of internal metrics.
  • CEO Gord Johnston retires effective Oct 1, 2026, with Susan Reisbord named as successor, and the December 2026 Investor Day is expected to set the next multi-year plan.
Bottom Line

The case rests on two things that are holding and one that is not yet proven. Margins have expanded for roughly seven consecutive quarters, backlog is at a record with framework work excluded, and Global has become the growth engine at about 13% organic. Against that, U.S. organic growth was flat in Q2 2026, and management lowered the full-year organic guide while raising the margin guide. The open question is whether the second-half U.S. and Canada acceleration actually shows up in the Q3 2026 print; if it does not, the timing diagnosis is falsified and reported growth rests on acquisitions, Global and Page's move into the organic line.

Next upThe next catalyst is the Q3 2026 report, which tests whether U.S. organic growth has accelerated and shows Page moving into the organic line. The December 2026 Investor Day follows, where management is expected to address the project-margin ceiling and present the next multi-year plan.
Last Quarter — Q2 FY2026

Earnings Miss

Stantec reported revenue of $1.25B in its fiscal second quarter of 2026, with a gross margin of 54.5% and EBITDA of $246.4M, a 19.6% EBITDA margin. On the company's adjusted basis the quarter set a record Q2 adjusted EBITDA margin of 18.7%, up 90 basis points year over year. Growth remained acquisition-led: 3.7% organic against 7.1% from acquisitions, primarily the Page purchase, and project margins — which the CFO calls the spine of the bottom line — came in at 54.5% of net revenue, up 30 basis points.

MetricQ2 FY2026Q1 FY2026Q2 FY2025YoY
Revenue$1.3B$1.5B$1.1B+18.3%
Gross margin54.5%39.6%40.0%+1450bps
EBITDA$246M$194M$158M+55.6%
EPS (GAAP)$0.93$0.70$0.64+45.5%
Contract backlog$9.2B$9.0Bn/a+17.5% y/y
Table shows reported figures; the text may discuss adjusted or continuing-operations numbers.
particularly impressive when you think about the margin expansion that we've had in the quarter and year-to-date in the face of the lower organic because typically, when you've got softer organic, that typically puts pressure on your margins.— Vito Culmone, CFO, Aug 13, 2026

Management tone: Management's tone was confident on margins and backlog and direct about the U.S. shortfall. Against the Q1 2026 call, the U.S. message shifted from expected organic acceleration across all five business verticals to flat, organic guidance was lowered while the margin outlook was raised, and confidence moved to the Global segment, which the CFO described as being in a high-single-digit environment for several quarters to come. Management volunteered negatives rather than waiting to be asked: it said Q2 organic was probably underreported by a smidge because of the way the company does things, and that the margin guide embeds some conservatism.

Management Guidance

For FY2026 management guides net revenue growth of 8.5% to 11.5%, an adjusted EBITDA margin of 17.8% to 18.3% (raised and narrowed from 17.6%-18.2%), adjusted EPS growth of 15% to 18%, and organic net revenue growth in the mid-single-digit range, lowered from mid-to-high single digit. By geography, the U.S. and Canada are guided to mid-single-digit organic growth and Global to high single-digit, with Canada's growth led by Water, Buildings and Environmental Services. Guidance excludes additional acquisitions. Management attributed the gap between roughly 80 bps of H1 margin expansion and about 15 bps implied for the full year to H2 workforce timing, and said the guide carries a little conservatism.

Business Trajectory

Trajectory

The profit line has been the stronger of the two stories. Adjusted EBITDA margin expanded year over year for roughly seven consecutive quarters, reaching a record-for-a-second-quarter 18.7% in Q2 2026, and the trailing-12-month margin is 18%. Project margins, which management calls the spine that drives the bottom line, were 54.5% of net revenue, up 30 basis points. The top line has been more mixed: acquisition growth has been running roughly double organic growth through 2026, at 7.1% against 3.7% in Q2, with Page the main contributor. Backlog has compounded to a record, about 13 months of work, growing 17.5% year over year and 7% organically. Management guides to slower organic growth and a moderating pace of margin expansion in the second half, because converting backlog requires adding people.

Revenue & Margin Trajectory
RevenueGross margin (43% to 54%)$0$1.0B$1.1B$1.5B$1.3B54%Q4'22Q2'23Q4'23Q2'24Q4'24Q2'25Q4'25Q2'26
RevenueGross margin (43% to 54%)$0$1.0B$1.4B$1.5BQ4'24Q2'25Q4'25Q2'26
Most recent quarters shown (8 on phones, 16 on larger screens). Gross margin as reported; gaps mean the figure was not reported.
Share Price — 12 Months
$80$100$12052-wk high $115$68Oct '25Jan '26AprJulOct '26
YTD -27.6%. 52-week range $65–$115.
Share Price — 12 Months
$80$100$12052-wk high $115$68Oct '25Jan '26AprJulOct '26
YTD -27.6%. 52-week range $65–$115.
The Numbers

The Model

The model projects next fiscal year's revenue of $6.05B and EBITDA of $1.09B, an 18.05% margin, rising to the following fiscal year's revenue of $6.62B and EBITDA of $1.23B, an 18.5% margin. The near term is anchored on record backlog, about 13 months of work, and on the mid-single-digit organic growth management guides for FY2026 alongside acquisition contributions. The following fiscal year assumes the margin trend continues past the 17.8%-18.3% range guided for FY2026, which depends on the hiring planned to convert backlog not stalling utilization.

Revenue & EBITDA Projections
REVENUE$5.5B$6.0B$6.6BFY25Next FY (E)FY after (E)EBITDA & MARGIN$753M$1.1B$1.2BFY25Next FY (E)FY after (E)
REVENUE$5.5B$6.0B$6.6BFY25Next FY (E)FY after (E)EBITDA & MARGIN$753M$1.1B$1.2BFY25Next FY (E)FY after (E)
Solid bars are reported actuals; outlined bars are model projections — not company guidance.
MetricFY2025Next FY (E)FY after (E)
Revenue$5.5B$6.0B$6.6B
YoY Growth—+10.5%+9.5%
EBITDA$753M$1.1B$1.2B
EBITDA Margin13.7%18.1%18.5%

Projections are the median of 5 independent model runs.

What Could Go Right — and Wrong

What good looks like
  • U.S. organic growth accelerates in the second half of 2026 as the named delayed projects ramp, turning the timing diagnosis into evidence and de-risking the full-year revenue guide.
  • Global holds high-single-digit organic growth for several quarters, led by UK water frameworks under AMP8, German infrastructure and Latin American mining work.
  • Margin holds near H1 levels into the second half despite the hiring build, validating the raised 17.8%-18.3% outlook and pointing to a higher multi-year ceiling at the December 2026 Investor Day.
  • Framework programs outside backlog — the 5-, 6- and 7-year AMP-style contracts — convert into assigned change orders, lifting contracted backlog above the disclosed $9.2B.
  • Data center work moves from roughly 3% of revenue toward the 5-6% range management has described, with hyperscaler relationships pulling through into grid, water, permitting and program management work.
What could go wrong
  • U.S. organic growth stays flat in Q3 2026, falsifying the timing diagnosis and putting the FY2026 revenue and adjusted earnings guidance at risk.
  • Canada's transit and roadway wind-down persists, leaving the second-half organic burden on Water, Buildings and Environmental Services and on Page's move into the organic line.
  • Hiring to convert backlog runs ahead of the work it is meant to convert, pressuring utilization and margins beyond the modest second-half expansion the guide implies.
  • Cash conversion stays soft — H1 2026 operating cash flow of $116M and DSO of 75 days — and constrains the combined M&A and buyback program now that the NCIB ceiling is 5%.
  • Policy timing slips: IIJA new awards end September 2026 with roughly 80% thought encumbered, and Surface Transportation reauthorization is expected only after the midterms and into early 2027.
What’s Next

Looking Ahead

Over the next 12 months the tests are specific and dated. Management has said U.S. organic growth should accelerate in the second half, with Page moving into the organic line in Q3 2026 and Canada guided to mid-single-digit organic growth led by Water and Buildings. The CEO transition takes effect Oct 1, 2026, and the December 2026 Investor Day is where management is expected to address the project-margin ceiling and set the next multi-year plan. Policy runs on its own calendar: the IIJA new-award window closes in September 2026, and reauthorization is expected only after the midterms and into early 2027. Management also said it expects more M&A over the next 12 months than in the last 12.

Catalysts
  • Q3 2026U.S. organic print — Tests whether the expected H2 acceleration is real after a flat Q2.
  • Q3 2026Page joins organic line — Page flips from acquisition to organic reporting, lifting reported organic.
  • H2 2026Canada organic ramp — Water, Buildings and Environmental Services must lead Canada's mid-single-digit guide.
  • December 2026Investor Day — Next multi-year plan; margin-ceiling questions expected.
Numbers

Financials

Annual Summary

MetricFY2024FY2025TTMYoY
Revenue$5.4B$5.5B$5.8B+0.6%
Gross Margin42.6%41.1%43.2%150bps
EBITDA$661M$753M$874M+13.9%
EBITDA Margin12.1%13.7%15.0%+161bps
Net Income$262M$319M$362M+21.6%
Free Cash Flow$359M$571M$480M—
Net Debt——$1.7B—

Net Debt = total debt minus cash and short-term investments at Jun 30, 2026. A company’s own leverage measure can differ.

Key Ratios (Trailing)

Valuation
  • P/E TTM—
  • EV/EBITDA TTM—
  • EV/Revenue TTM—
  • Price/FCF TTM—
Profitability
  • Gross Margin (TTM)43.2%
  • EBITDA Margin (TTM)15.0%
  • Net Margin (TTM)6.2%
  • ROIC11.7%
  • FCF Conversion54.9%
  • SBC / Revenue0.2%
Reference

The Company

Stantec is a global design and engineering firm. The FY2025 40-F describes it as 'a global leader in sustainable engineering, architecture, and environmental consulting,' whose professionals deliver the expertise communities need to manage aging infrastructure, demographic change and the energy transition. It works across five business lines — Infrastructure, Environmental Services, Water, Buildings and Energy & Resources. For the AI build-out the relevant pieces are Buildings, where teams design hyperscale data centers, semiconductor plants and advanced manufacturing, and Water, which covers cooling and process water bundled into those projects plus municipal and industrial treatment. It is a services firm, not an owner-operator: the 40-F lists no plants, and every infrastructure item the company discusses is work it designs, engineers, manages or advises on.

Operations are reported through three segments — Canada, the United States and Global — which the 40-F describes as the company's operating and reportable segments for its consulting services. Growth is run through a mix of acquisitions and hiring: the company closed the Page acquisition, added Niche, a 200-person Australian engineering and environmental consultancy, effective Jul 31, 2026, and built its India global delivery center to roughly 2,000 people ahead of a year-end goal, with a second office in Pune and plans to expand to other cities. It funds this at 1.3x net debt to adjusted EBITDA, inside a stated internal target range of 1x to 2x.

Business Segments

Buildings
Backlog up over 40% y/y, primarily from acquisitions
Integrated architecture, engineering and design, including hyperscale data centers and semiconductor plants.
Growth driver: Hyperscale data center and advanced manufacturing work
Water
Close to 12% organic globally; Global Water over 20%
Water and wastewater treatment design, plus cooling and process water bundled into data center and fab jobs.
Growth driver: UK AMP8 and other long-term water frameworks
Infrastructure
North Central U.S. data center work cited as a growth driver
Transportation, community development and urban-space design, including data center site and campus work.
Growth driver: North Central U.S. data center site development

Competitive Landscape

The competitive set is a group of global engineering and consulting majors. Jacobs, Tetra Tech, Parsons and Legence each name Stantec as a competitor in their own filings. Management's argument is that clients are consolidating work into larger, more integrated programs awarded to a smaller group of providers, so the bidder set on the biggest jobs narrows to what management calls the big majors, which it says allows some pricing power in a number of instances. Management also describes the industry as fragmented, estimating the largest U.S. firm at only 6% to 8% market penetration.

  • Jacobs (J)
    Jacobs' own filing lists Stantec among its competitors; Stantec's filings do not discuss it.
  • Tetra Tech (TTEK)
    Tetra Tech's peer list names Stantec among its principal competitors; not discussed by Stantec.
  • Parsons (PSN)
    Parsons lists Stantec in its Critical Infrastructure peer group; not discussed by Stantec.
  • Legence (LGN)
    Legence names Stantec as a national competitor of its Engineering & Consulting segment; not discussed by Stantec.
  • WSP
    Stantec appears in competitor lists drawn from other companies' filings and our own records; it was not discussed.
The competitor rows appear to be drawn from other companies' filings and our own records, which tag them as documented; we found no competitor, sole-source or supply-risk disclosure in Stantec's own 40-F.

Supply Chain

Stantec sits in the design and engineering layer of infrastructure projects rather than in materials or equipment supply. Our map of likely relationships lists four generic suppliers with no quotes, none of which appear to be project-specific relationships. We found no earnings-call transcript from a neighboring company that mentions Stantec by name.

Supplier
Electricity supply
Supplier
Electronic components distribution
Supplier
Construction equipment
Supplier
Transportation and logistics
→
Scale to bid large bundled programs
STN
Fee-based design and engineering; owns no plants or assets.
→
Meta
Architecture, engineering and integrated design on a $13 billion data center in Alberta.
Five top hyperscalers
Data center capacity described as well over 1 gigawatt on the Q1 2026 call.
U.S. Army Corps of Engineers
Design and engineering support via a Black & Veatch-Stantec joint venture.

Analysis updated Oct 19, 2026, reviewing Q2 FY2026. Prices delayed. Built with The Buildout’s published methodology. Not investment advice. No positions held. © The Buildout 2026.