Applied Optoelectronics, Inc. earnings recap

Q3 FY2026, reported November 5, 2026 · Beat 4 of last 6 quarters

Applied Optoelectronics, Inc. reported Q3 FY2026 revenue of $270M, a beat of 0.7% against consensus, and EPS of $0.17, a beat of 19.5%.

The Buildout is a website built by one person using AI agents, and could have factual errors.

Go to the full Applied Optoelectronics, Inc. company page →See the earnings preview →Applied Optoelectronics, Inc. is in the Networking layer →
What this means for the buildout

AOI's quarter is the clearest read yet that 1.6T optical demand is running ahead of the supply chain: roughly $450 million of 1.6T orders cannot be shipped in Q4 because of DSP and other material availability, and management expects demand to exceed capacity through all of 2027. The bottleneck has moved from demand to physical inputs — DSPs, electrical power for new U.S. plants, and construction schedules — suggesting the optical layer of AI clusters is scaling on the same constrained timeline as compute. A multiyear 1.6T LTA with a hyperscaler plus a second LTA reportedly in final negotiation extends visibility for transceiver and laser capacity into 2029.

Results vs consensus
EstimateActualvs est
Revenue$268M$270M+0.7%beat
EPS$0.14$0.17+19.5%beat
What was said

Revenue was a record $269.9 million, up 127.5% year over year and 40.6% sequentially. Data center revenue rose 254% year over year to $155.6 million, including $47.5 million of 800G (nearly quadrupling sequentially) and $93.4 million of 400G (nearly doubling sequentially), while record CATV revenue of $110.9 million grew 57% year over year on continued 1.8 GHz amplifier shipments. Non-GAAP gross margin of 28.7% came in below the 29%-30.5% guidance range on a higher 400G mix after the LTA customer shifted from 800G to 1.6T faster than expected, while non-GAAP EPS of $0.17 was inside the guided range. The company returned to GAAP profitability with $6.3 million of net income, or $0.07 per diluted share, and ended the quarter with $621.5 million of cash after completing a $600 million at-the-market equity program, having made $501 million of capital investments including $142.8 million of equipment prepayments.

Key metrics
Total revenue
$269.9M
+127.5% YoY, +40.6% QoQ; sixth consecutive record quarter, within $255M-$290M guide
1.6T LTA value
$1.0B-$1.5B
3-year agreement (June 2026-May 2029) with a Tier 1 hyperscaler; minimum 10% of its 1.6T requirement, subject to supply and agreed price reductions
Q4 revenue guidance
$385M-$420M
~200% YoY growth at midpoint; data center $270M-$300M, CATV $105M-$115M
800G/1.6T capacity
~330K units/month
Up from ~200K at end of Q2; >500K targeted by year-end (cut from 650K), >1M by end-2027 (raised from 930K)
Non-GAAP gross margin
28.7%
Below 29%-30.5% guide on richer 400G mix; 29.8% in Q2 FY2026, 31.0% in Q3 FY2025; long-term target ~40%
Management outlook

Management guided Q4 revenue to $385M-$420M, roughly 200% year-over-year growth at the midpoint, split between $270M-$300M of data center and $105M-$115M of CATV, with non-GAAP gross margin of 29.5%-31% and non-GAAP EPS of $0.48-$0.63 on ~96 million diluted shares. Capacity is the binding constraint: total output is approaching 330,000 units per month, is targeted above 500,000 units per month by year-end (reduced from 650,000 on the Sugar Land Phase II electrical-power delay), and above 1 million units per month by end-2027 (raised from 930,000), with nearly 30% of that production expected in Texas. The Phase II delay pushes the $471 million monthly revenue run-rate goal to late 2027, and Thompson Lin described the ramp from roughly $100 million of monthly data center revenue in Q4 as linear through next year. He added that a second LTA is in final-stage negotiation, could be about 5x larger than the first, and would cover 800G, lasers and other products for a second customer. Management reiterated a long-term objective of returning non-GAAP gross margins to around 40% and said demand for 800G and 1.6T will exceed production capacity throughout 2027, with AOI able to serve perhaps only 80% of customer demand even after the planned expansions.

From the call

“Looking ahead, we expect demand for 800G and 1.6 terabit modules to exceed our production capacity throughout 2027. We are continuing to add capacity and to secure the key components needed to meet this demand.”

on Demand exceeds capacity

“Just that 1.6T as I emphasized. Right now 1.6T, we have $450 million, something like that. But even by Q4, we can only deliver only $50 million to $70 million, okay?”

on 1.6T supply constraint

“The other thing I forgot to mention is, besides the first LTA, I think the second LTA is in the final stage. We expect to sign it within a few weeks. The size will be much, much bigger than first one, will be even 5x bigger or even more than that.”

on Second LTA pipeline

What analysts asked

What is baked into Q4 for 800G and 1.6T given the customer transition and capacity delays, and how should we think about the linearity of capacity toward the $471 million monthly target now that it has slipped to year-end?

Stefan Murry said 800G continues to grow and 1.6T contributes meaningfully, but AOI has far more 1.6T orders than it can supply this quarter because material could not be added on a dime when the customer shifted faster than expected. On capacity, he said to linearize the ramp through the year rather than treat it as a binary step, and Thompson Lin framed it as going from close to $100 million of monthly data center revenue in Q4 to $470 million per month by end-2027, noting well over $400 million of 1.6T orders in hand and that manufacturing cycle time and key material supply are the limits.

How are you feeling about supply of indium phosphide substrates and DSPs, particularly the 1.6T DSPs, and what else is at the top of your supply concern list?

Stefan Murry said indium phosphide is fine through 2027 and is only a future watch item for CPO/NPO, which uses far more material. The 1.6T DSP constraint is real but stems more from shifting customer priorities than an absolute shortage, and he expects it to resolve or improve dramatically in Q1 of next year. Thompson Lin added that two DSP suppliers are qualified and a third is in qualification, with customer approval of new suppliers being the critical gating factor.

What makes this a long-term agreement rather than a standard supply agreement, and what are the trade-offs versus your usual arrangements?

Stefan Murry said the defining feature is the multiyear duration, which is very unusual for AOI and for the industry, and that the 3-year term plus the minimum share of the customer's 1.6T business gives visibility to scale and invest CapEx. He acknowledged the agreement is not one-sided: AOI commits to supply and to agreed pricing that includes some price reductions over the period, so if market pricing expands meaningfully, AOI forgoes some of that incremental opportunity.

Potential supply chain impact
MSFTThe new 3-year 1.6T LTA is with an existing 'large U.S.-based hyperscale customer' that returned as a greater-than-10% customer at 23% of revenue; Microsoft is AOI's largest documented data center customer, so its 1.6T transition could be the driver of the faster-than-anticipated 800G-to-1.6T order shift and the resulting Q4 material gap.
LITEManagement cited Lumentum and Coherent among key suppliers that, like AOI, cannot fully meet customer demand even with rapid expansion, and described the Lumentum/Marvell combination as evidence of optics-silicon consolidation while positioning AOI as a remaining independent optics supplier — further consolidation could shift competitive dynamics or customer sourcing.
COHRCoherent was named among large optical suppliers still short of hyperscaler demand; its own capacity additions and any 1.6T qualification wins may influence AOI's pricing and share gains as volumes scale, while consolidation in the space could alter the laser and transceiver competitive set.
ORCLOracle was a documented data center customer at 12.4% of 2024 revenue; management said 100G weakness tied to an industry memory-driven switch shortage will persist until memory supply recovers, which could be a mild headwind for legacy 100G volumes at existing customers.