CEVA, Inc. earnings recap
Q3 FY2026, reported November 9, 2026 · Beat 4 of last 5 quarters
CEVA, Inc. reported Q3 FY2026 revenue of $29M, a miss of 11.1% against consensus, and EPS of $0.13, a miss of 31.1%.
The Buildout is a website built by one person using AI agents, and could have factual errors.
CEVA's record AI licensing and the NeuPro Ultra launch move NPU IP toward the data center, with management explicitly targeting memory and high-speed connectivity suppliers that want accelerators attached closer to the memory and interconnect subsystems — a potential new design-win vector in AI infrastructure that sits alongside, rather than replacing, GPUs and CPUs. The near-term read is more muted: a delayed multiyear connectivity deal pushed licensing below plan, and memory-driven softness in smartphones, PCs and TVs shows the IP model still tracks consumer device cycles, so infrastructure relevance this quarter is about pipeline and tape-outs rather than shipped revenue.
| Estimate | Actual | vs est | ||
|---|---|---|---|---|
| Revenue | $33M | $29M | -11.1% | miss |
| EPS | $0.19 | $0.13 | -31.1% | miss |
Revenue rose 2% year-over-year to $29.1 million, with licensing and related revenue up 2% to $16.3 million, or 56% of total, and royalties up 3% year-over-year and 18% sequentially to $12.7 million, or 44% of total. Licensing came in below plan because a significant multiyear connectivity agreement with an existing strategic customer that had been expected in Q3 was delayed, and management said it has since been signed early in the fourth quarter. The company signed 10 agreements, three with first-time customers and six AI-related, and AI licensing reached a quarterly record at more than 35% of licensing and related revenue. Customers shipped 623 million CEVA-powered devices, matching the all-time quarterly record, with mobile shipments of 82 million units up 19% year-over-year and 34% sequentially as internally developed modems at a major U.S. customer entered high-volume production, while memory market headwinds tempered volume in compute-intensive consumer devices such as smartphones, PCs and TVs. Non-GAAP gross margin was 86% versus 89% a year ago, non-GAAP operating margin was 9%, and non-GAAP diluted EPS was $0.13, up 18% year-over-year on non-GAAP net income of $3.8 million; cash, equivalents, marketable securities and bank deposits totaled roughly $221 million with DSO of 56 days.
Q4 guidance of $34M–$38M implies roughly 24% sequential growth at the midpoint, which management said would be the highest quarterly revenue in company history, built on an expected step-up in smartphone modem royalties at a major U.S. customer, typical Q4 seasonality and the licensing pipeline; the midpoint implies full-year 2026 revenue growth of approximately 11%. Management lowered its expected full-year non-GAAP cost and expense growth to approximately 7%, or about $7 million, from the prior 8% view, citing expense discipline and an FX headwind it described as mostly behind it, and guided Q4 non-GAAP gross margin to about 89%. The significant multiyear connectivity deal with an existing strategic customer that slipped out of Q3 was signed early in Q4, and management pointed to licensing being up 14% year-over-year through the first nine months along with a robust Q4 backlog. On AI, management expects initial NeuPro royalties around the end of this year or early 2027, with ramps through 2027 and 2028, and said the time to royalty in AI infrastructure is similar to the edge at a typical 18 to 24 months. NeuPro Ultra extends the portfolio beyond the edge into data-center inference, targeting OEM and Tier-1 semiconductor customers building their own accelerators plus memory and high-speed connectivity suppliers, with the technology already licensed to several customers including a new one this quarter. The tone was confident on Q4 and on multiyear royalty drivers, but explicitly disciplined given pressure across compute-intensive consumer markets from memory pricing.
“With the newest addition to the family, NeuPro Ultra, we are extending CEVA reach beyond the edge into AI infrastructure. We expect this will significantly expand our addressable market as data center solutions providers seek greater efficiency across inference systems.”
on AI infrastructure expansion
“This is the first time our customers has moved its internally developed modems into high-volume production across its mainstream flagship smartphone models, an important step for CEVA in this market. We expect this volume ramp to accelerate significantly in the fourth quarter, supported by a full quarter of device shipments across multiple models and to continue into 2027 and beyond.”
on Smartphone modem royalty ramp
“We expect a fourth quarter -- strong fourth quarter with approximately 24% sequential revenue growth at the midpoint of our guidance. This would represent the highest quarterly revenues in CEVA's history and we expect non-GAAP diluted EPS to more than double sequentially.”
on Fourth quarter outlook
Beyond the U.S. customer that has started shipping, how does the rest of the mobile market look, and what are customers saying about unit shipments this quarter and into next year?
Management said the U.S. customer contribution in Q3 was minimal because production started only at the very end of the quarter, with a very significant ramp expected in Q4 and into 2027. The broader smartphone and compute-intensive consumer market is under pressure from price increases, but CEVA's lower-tier customers started the year soft and have grown sequentially each quarter while gaining share, cushioning the impact. Mobile royalty revenue still grew 20% year-over-year and 30% sequentially before the large U.S. customer volume kicks in.
Can you size the licensing deal that moved from Q3 into Q4, and what is the normalized licensing run rate into 2027?
The CFO described it as a significant, multi-technology deal with an existing customer that was a timing issue and was closed at the beginning of Q4. He pointed to a run rate in the roughly $18 million range seen in the first two quarters of the year as a level they are comfortable with, noting licensing is up 14% year-over-year through nine months and that the Q4 backlog and pipeline support confidence in finishing the year strongly.
On NeuPro Ultra and early traction in AI data center infrastructure, who is the customer or target customer, and how does it compare to CPUs or GPUs for inference workloads?
Management said the product is not meant to replace high-performance CPUs or GPUs used for training, but to accelerate and improve power efficiency of cloud inference alongside them, in multi-core, multi-user, multi-batching configurations. Two customer types are targeted: OEMs and Tier-1 semiconductor companies building their own accelerators who do not want to start from scratch, and memory or high-speed connectivity suppliers who want to attach NPU capability closer to the memory or interconnect subsystem to cut latency and improve system efficiency.