Datadog, Inc. earnings recap
Q3 FY2026, reported November 4, 2026 · Beat 7 of last 7 quarters
Datadog, Inc. reported Q3 FY2026 revenue of $1.20B, a beat of 4.4% against consensus, and EPS of $0.81, a beat of 25.2%.
The Buildout is a website built by one person using AI agents, and could have factual errors.
Datadog's quarter reads as a demand signal on both sides of the buildout: AI-native customers are scaling to commitments management says it has never seen at this speed, while non-AI enterprises accelerated cloud consumption as they push AI into production. The telemetry attach — GPU devices monitored up 8x year-to-date, agent observability spans up 9x, MCP tool calls up 50x — suggests AI workloads are generating measurable, monetizable data volumes rather than just capex. Management's statement that GPU monitoring is not yet widely monetized leaves a potential future revenue lever tied directly to accelerator fleet scale.
| Estimate | Actual | vs est | ||
|---|---|---|---|---|
| Revenue | $1.15B | $1.20B | +4.4% | beat |
| EPS | $0.64 | $0.81 | +25.2% | beat |
Revenue was $1.197B, up 35% y/y and above the high end of guidance, with non-AI customer growth in the high-20s percent — a fifth consecutive quarter of acceleration — while the 850-plus AI customer cohort, including 39 spending more than $1M annually, grew significantly faster than the rest of the business. Datadog ended with about 33,500 total customers and about 4,860 at $100K+ ARR (roughly 91% of ARR), with trailing-12-month net revenue retention in the low 120s and gross retention stable in the mid-to-high 90s. Non-GAAP gross margin was 81.2%, operating income was $334M (28% margin) on 25% OpEx growth, and free cash flow was $251M (21% margin). Billings were $1.16B (+30%) and RPO $3.85B (+38%), with new customers contributing about 30% of year-over-year revenue growth versus 25% a year ago. Platform adoption widened to 60% of customers using 4+ products, 40% using 6+, and 16% using 10+, and the infrastructure monitoring suite crossed $2B in ARR growing in the mid-30s percent; cited deals included an 8-figure expansion with the AI division of a large technology company that nearly tripled its commitment, a 5-year 7-figure deal with a US Federal Defense Agency, 7-figure deals with two major Japanese banks, and an 8-figure expansion with an AI coding company.
Management guided Q4 revenue to $1.19B–$1.20B, or 25–26% growth, with the step-down driven largely by assuming the largest customer spends only at its contractual minimum commitment; excluding that customer, implied Q4 growth is in the low-to-mid 30s percent range. Full-year FY2026 revenue guidance is $4.515B–$4.525B (~32% growth) with non-GAAP operating income of $1.09B–$1.105B (24% margin) and EPS of $2.73–$2.75, with Q4 carrying heavy marketing investment including AWS re:Invent. Capex plus capitalized software is expected at 3–4% of revenue, and gross margin is expected to stay around the low-80s through platform penetration and engineering work. Management flagged that several large and AI customers renewed early at higher commitments with better pricing, which is good news long term but creates a near-term revenue headwind before volume growth resumes, and said it will address 2027 guidance on the year-end call. R&D investment continues on both 'AI for Datadog' (Bits, the in-house Scout reasoning model, reinforcement learning work accelerated by Adaptive ML) and 'Datadog for AI' (GPU monitoring, agent observability, AI Guard, AI cost in CCM), with GPU fleet monitoring framed as an opportunity that is not yet widely monetized.
“Revenue growth from our non AI customers accelerated for the 5th straight quarter was in the high-20s percent year over year. Up about 1 percentage point from last quarter up from about 20 percent in the year ago quarter.”
on non-AI customer acceleration
“All 15 of the top 15 AI leaders are our customers. And more broadly, we now serve over 850 AI customers up from about 750 last quarter.”
on AI customer base
“The number of GPU devices monitored is up by a factor of 8 so far this year.”
on GPU monitoring scale
Versus 90 days ago, what has changed in the underlying assumptions behind the Q4 guide — the core business, the largest customer, or just the minimum-commitment methodology?
The largest customer renewed and spent above its minimum commitment in Q3, but the Q4 guide includes only the minimum; the other change since last quarter was several early renewals and extensions with large and AI customers, where Datadog extended and increased the commit at better pricing. That is good news but a short-term revenue headwind. Everything else played out roughly as expected, including the continued acceleration of non-AI customers.
With the largest customer and the early-renewal dynamic, how should we think about the sequentials in the AI-native cohort and when it returns to a more normal pattern?
The largest customer cannot go below its minimum commitment but can run various degrees above it, which Datadog does not control. Early renewals come at higher commits with better pricing, so the same volume at a lower price creates a short-term headwind before volume growth resumes. Q4 also carries typical late-December seasonality from vacations and code freezes. Over time a broadening AI-native cohort should make the base more stable, and visibility is better in the mid-to-long term than quarter to quarter.
Infrastructure monitoring now exceeds $2B in ARR growing mid-30s percent — how much of that growth is coming from AI infrastructure, and how sustainable is it as GPU efficiency improves?
Growth reflects acceleration across the business generally, not just AI, and today it is not directly related to GPUs: GPUs are still largely tied to customers' training workloads, where Datadog has products but does not yet monetize them widely. That represents an opportunity ahead rather than something baked into current growth and numbers.