Teradata Corporation earnings recap

Q3 FY2026, reported November 5, 2026 · Beat 7 of last 7 quarters

Teradata Corporation reported Q3 FY2026 revenue of $399M, a beat of 0.8% against consensus, and EPS of $0.70, a beat of 20.9%.

The Buildout is a website built by one person using AI agents, and could have factual errors.

Go to the full Teradata Corporation company page →See the earnings preview →Teradata Corporation is in the Software & Design layer →
What this means for the buildout

Teradata's quarter is a modest but directional data point for the enterprise AI buildout: cloud ARR accelerated to 11% while management explicitly tied 2027 growth to on-prem and sovereign AI stacks — Teradata Factory with GPUs inside, and Sovereign Cloud on Google Distributed Cloud — rather than to public-cloud migration. That suggests some regulated and public-sector AI demand is being pulled toward private, GPU-bearing infrastructure sitting next to the data, a potential demand signal for server, accelerator and storage suppliers rather than hyperscale-only deployment. Near term, though, the story is cash and margin: adjusted free cash flow is up 90% year-to-date while total revenue growth remains roughly flat.

Results vs consensus
EstimateActualvs est
Revenue$396M$399M+0.8%beat
EPS$0.58$0.70+20.9%beat
What was said

Total ARR grew 1% as reported and 2% in constant currency, while cloud ARR grew 11% — an acceleration from 8% as reported in Q2. Total revenue of $399 million and recurring revenue of $359 million both landed at the high end of the outlook, but reported recurring revenue fell year-over-year because on-prem subscription revenue was recognized upfront earlier in the year; year-to-date recurring revenue is still up 4%. Total gross margin was 61% and operating margin 22%, both down versus Q3 last year for the same linearity reason, though year-to-date gross margin is up 140 basis points and operating margin is up roughly 300 basis points; consulting services revenue was $37 million at a 5% gross margin as that business transitions from cloud migration work to AI services. Product activity included the September evolution of Tera (generally available, with Context Engine, Harness and Agent Skills due before year-end), general availability of Elastic Python compute and AI Studio in October, an integration with Microsoft OneLake, and expanded sovereign offerings including Teradata Factory and Teradata Sovereign Cloud on Google Distributed Cloud. Adjusted free cash flow was $96 million, up 9%, and the company repurchased $57 million, or about 2 million shares, in the quarter; management also said memory and component pricing stabilized in Q3 after an inflationary start to the year and that it had bought inventory ahead last year.

Key metrics
Total ARR growth
1%
2% in constant currency; management still expects the majority of 2026 ARR expansion to land in Q4
Cloud ARR growth
11%
As reported and in constant currency, accelerating from 8% as reported in Q2
Total revenue
$399M
High end of the outlook range; recurring revenue of $359M was also at the high end, though down year-over-year on prior upfront recognition
Non-GAAP EPS
$0.70
Exceeded the top end of the outlook range by $0.11 on lower operating expenses and high-end revenue
Adjusted free cash flow
$96M
Up 9% from $88M a year ago; year-to-date $254M versus $134M in the first three quarters of 2025
Management outlook

Management reaffirmed total ARR growth of 2% to 4% and adjusted free cash flow, narrowed total revenue to minus 1% to 0% and recurring revenue to 1% to 2% growth (the high end of prior ranges), and raised non-GAAP EPS to $2.86 to $2.90. Q4 is guided to recurring revenue of minus 2% to minus 4%, total revenue of minus 4% to minus 6% and EPS of $0.58 to $0.62, which management attributed to the timing of upfront revenue recognition earlier in the year rather than a change in underlying trends. Operating margin expansion is now expected at roughly 200 basis points for the year — double the 100 basis points planned at the start of the year — lifting the EPS midpoint to $2.88 from $2.60 and the adjusted free cash flow midpoint to $340 million from $320 million. Management framed 2027 growth around monetizing this year's product investments (Tera, AI Studio, Elastic compute), sovereign and on-prem deployments through Teradata Factory with Dell, and a higher proportion of new logos, saying it intends to hold operating expense flat to slightly down while adding sales capacity. Steve McMillan noted Q4 is the largest renewal and selling quarter and that the largest expansion deal in the Q4 plan — a hybrid government deployment in the Pacific region — was already closed in October, underpinning confidence in the 2% to 4% ARR range.

From the call

“We also remain very focused on driving operating margin improvement. We now see operating margin expansion of approximately 200 basis points for the year, which is double the 100 basis point improvement that we had anticipated at the beginning of the year.”

on Margin expansion

“Q4 is certainly our largest renewal quarter, and it gives us the most opportunities for expansion.”

on Q4 pipeline

“The benefit of Teradata Factory with GPUs right inside means that customers can utilize the language models that they want right next to the data that they've got in a completely controlled and well-governed environment.”

on Sovereign and on-prem AI

What analysts asked

Does deployment flexibility across on-prem, cloud and hybrid reduce customers' urgency to migrate and expand cloud commitments, and how should investors weigh that flexibility against faster public cloud ARR growth?

Management said it is in the business of growing total ARR, which is why it guided 2% to 4% at the start of the year, and that the cloud-versus-on-prem mix is largely customer choice; it has seen a decline in the headlong rush to the cloud as customers get more deliberate about which workloads sit where. The new AI stack and Autonomous Knowledge platform can be deployed on-prem for existing and new customers, and in Q3 both on-prem and hybrid deals closed and contributed growth.

What customer demand are you seeing today for sovereign AI, and how big is the longer-term opportunity given competitors announcing eight-figure sovereign contracts?

Steve McMillan said sovereign is capturing industry interest, particularly internationally and in highly regulated U.S. industries, with telco operators building private clouds as alternatives to U.S. public cloud. He said Teradata technology deploys in all of those environments, pointed to the ease of partnering with Google Distributed Cloud for sovereign use, and argued Teradata Factory with GPUs lets customers run the models they want next to their data in a governed environment — citing sovereign as one of the key growth areas for 2027.

How are the oversubscribed customer-event workshops converting into deal activity, and what visibility do you have into the Q4 ARR ramp given you already closed an expansion deal?

Management said Q4 is the largest renewal quarter and carries the largest expansion opportunities, so closing one of the biggest deals in October gives confidence in in-quarter execution, with pipeline coverage for the 2% to 4% range. On the events, management said it demonstrated how customers can take selected use cases into production quickly, told customers not to think in terms of proofs of concept, and said AI services plus the new product announcements are building pipeline for fiscal 2027.

Potential supply chain impact
DELLTeradata Factory is built with Dell, and management said Dell has committed to bringing new-logo opportunities; a sovereign/on-prem Factory ramp in 2027 could add server volume, though timing and size are uncertain.
NVDATeradata Factory ships with GPUs inside the system, and management is pitching sovereign and on-prem Factory deployments as a 2027 growth driver — incremental Factory wins may carry NVIDIA GPU attach.
GOOGLTeradata expanded sovereign offerings with Teradata Sovereign Cloud on Google Distributed Cloud's air-gapped environment, which may widen Google Cloud's presence in regulated and sovereign accounts.
MSFTThe OneLake integration lets customers run AI on data stored in Microsoft's lakehouse without duplicating or migrating it, which could deepen Azure/OneLake attachment inside existing Teradata accounts.
FLEXFlex assembles and configures Teradata hardware; management said component pricing stabilized in Q3 and that inventory was bought ahead last year, which may moderate near-term build volumes.
AMZNElastic Python compute and AI Studio are available on AWS for parity with on-prem, even as AWS's native analytics stack remains a documented competitor — cloud ARR growth may partly depend on workloads Teradata runs inside a rival's cloud.