Wolfspeed Inc. earnings recap
Q1 FY2027, reported November 4, 2026 · Beat 5 of last 8 quarters
Wolfspeed Inc. reported Q1 FY2027 revenue of $155M, a beat of 3.4% against consensus, and EPS of $-2.03, a miss of 2.0%.
The Buildout is a website built by one person using AI agents, and could have factual errors.
The call adds a concrete architectural datapoint to the AI power thesis: a shift from single-rack GPU-plus-power designs to dedicated sidecar power racks raises the silicon carbide content per deployment, and management says its data center order book is accelerating off a base that doubled year over year on a trailing 12-month basis. The conditional $1.5 billion Department of War commitment, if it closes, would lower Wolfspeed's cost of capital and fund GaN capacity conversion on existing 200mm tooling, potentially widening the Western high-voltage power supply chain that AI data centers depend on.
| Estimate | Actual | vs est | ||
|---|---|---|---|---|
| Revenue | $150M | $155M | +3.4% | beat |
| EPS | -$1.99 | -$2.03 | -2.0% | miss |
Wolfspeed reported $155M in revenue, slightly above the midpoint of guidance, with Power at approximately $117M (up 10% sequentially on I&E/data center strength) and Materials at approximately $38M. Adjusted non-GAAP gross margin improved 710 basis points sequentially to negative 12.8%, driven primarily by higher utilization as the company largely completed its inventory reduction, with a secondary benefit from more favorable product mix in Power. Non-GAAP operating expenses were $64M versus $62M in the prior quarter, adjusted non-GAAP EBITDA was negative $55M, and gross capital expenditures were approximately $11M; operating cash flow was negative $84M including $32M of interest paid, while working capital contributed approximately $60M to cash and has added roughly $235M over the past five quarters. The company completed a previously planned workforce reduction of approximately 6%, announced a majority-share long-term supply agreement supporting BorgWarner's next-generation 800-volt SiC inverter platform, expanded and extended its SiC wafer supply agreement with Infineon to include 200-millimeter wafers, received Megmeet's Strategic Partner Award in AI data centers, and commercially introduced proprietary transparent silicon carbide (TSiC) technology.
Management guided Q2 FY2027 revenue to $155M–$175M and said non-GAAP gross margin should improve sequentially and approach break-even, with operating expenses stepping up to $65M–$69M primarily to support anticipated AI data center growth. CFO Gregor van Issum lowered the revenue level he associates with break-even: rather than the roughly $200M a quarter cited last call, he now expects something "a little bit lower" given operational improvements and favorable end-market mix, which he said implies roughly 25%–30% wall-to-wall utilization at Mohawk Valley. The headline strategic item was the conditional 30-year, $1.5 billion loan commitment from the U.S. Department of War, whose initial $600M Tranche A is expected to refinance the remaining first lien notes due 2030, delivering more than $50M in annual interest savings and roughly $100M in annual cash interest savings because the first five years of interest are paid in kind; management said due diligence and the credit agreement are progressing and it aims to close ideally before year-end, subject to a limited equity raise and other balance-sheet de-risking measures. Later tranches would fund a project-based investment program spanning SiC scaling, domestic GaN power devices, GaN-on-SiC RF materials and radiation-hardening capabilities — explicitly not new sites or square footage, but pivoting fungible existing capacity. Management framed fiscal 2027 as "a turning point" and the start of more meaningful long-term revenue and profitability growth, with AI data centers as the highest-growth end market and GaN as a second power engine addressing lower-voltage designs in data center power and humanoids.
“We continue to view AI data centers as our highest growth end market, consistent with last quarter revenue more than doubled year over year on a trailing 12-month basis, and our order book is accelerating, reinforcing its position as our fastest-growing market.”
on AI data center demand
“The architecture is evolving from a single rack carrying both GPU and power to a dedicated two-rack design, one rack for compute and a dedicated sidecar power rack alongside it. Our technology is at the core of enabling high power density with high efficiency.”
on HVDC power architecture
“The refinancing is expected to deliver more than $50 million in annual interest savings, and given the first five years of interest payments will be paid in kind, annual cash interest savings are expected to be approximately $100 million.”
on Capital structure
What are the milestones for the $1.5 billion government commitment, what hurdles remain, what is the timing for the refinancing this year, and how has that dynamic shaped customer relationships including the BorgWarner deal?
Gregor van Issum said the government completed substantial work ahead of the detailed LOI and is now finishing due diligence, expected to take another couple of weeks, while the credit agreement is finalized in parallel. Drawing the tranches requires several financial commitments, a limited equity raise and other balance-sheet de-risking measures being discussed with the U.S. government; he said the company looks well on track to finish ideally before end of the year. Robert Feurle added that customer reception has been very positive across the U.S., Europe and Asia Pacific.
With gross margin guided to approach break-even, what guideposts — Mohawk Valley utilization or revenue level — should investors use to bound when gross margin breaks even?
Gregor van Issum said that whereas last call he framed the company as needing roughly $200M a quarter to break even, improvements and favorable end-market mix now put that break-even point a little bit lower, though the exact level remains to be seen. He said Mohawk Valley would need roughly 25%–30% wall-to-wall utilization to get there; equipment utilization is harder to define and measure but the company is well within Mohawk Valley's capabilities.
Market data shows silicon carbide lead times and pricing rising — does management believe the market has bottomed on pricing and on the overcapacity situation, for both materials and devices?
Robert Feurle said the build-out of power infrastructure for AI data centers has created a very large additional socket for silicon carbide, helping absorb capacity built over recent years across two large end markets. He cited automotive, where high energy prices are supporting EV purchases, and AI data centers, particularly as 800-volt systems deploy, as drivers toward a better supply-demand balance — something he said few had on their radar two years ago. On materials, he flagged RF and satellite communications applications and Wolfspeed's U.S.-based capabilities as a favorable position.