Vishay Precision Group, Inc. (VPG) | The Buildout — AI Infrastructure

——Mkt cap — · 52-wk —–— · YTD — · delayed
Updated Sep 22, 2026Q2 FY2026 reviewed
Vishay Precision Group makes precision resistors, strain gages and measurement systems used in semiconductor equipment, data centers and fiber optics.
Sensors B2B 1.44
Bookings $48.1M, an all-time quarterly record.
Backlog $135.8M
Up about $10M sequentially; 7 straight quarters B2B at or above 1.0.
Sensors rev +26%
Q2 Sensors revenue $33.4M, roughly 40% of the total.
Q2 missed the guide
Revenue $83.9M vs $85M-$90M on a ~$3M KELK ERP delay.
The Buildout Takeaway
Orders and backlog sit at records while revenue has printed near $84M for two quarters and margins stay close to breakeven. The question is whether the order book converts into revenue and margin before the second half of FY2026, where nearly every management commitment is weighted.
6 analysts·6 Buy0 Hold0 Sell
Coverage is thin — only 1 price estimate, so no target is shown

Q3 FY2026 revenue $84M-$89M · FY2026 organic growth to exceed the 8%-10% target · double-digit FY2026 revenue growth · capex $10M-$12M · operational tax rate ~30%
Important: The Buildout is a data analytics platform. Content is generated by algorithms and AI agents using public filings, earnings transcripts, and market data. This is not personalized investment advice.
Our View

The Verdict

VPG sells precision measurement and sensing parts: precision resistors, strain gages, load cells and specialized measurement systems. It is a component supplier, not a system or platform vendor, and its products are 'designed-in' by customers — qualified into a design at the front end and carried through the product's life. The AI-infrastructure link runs through the Sensors segment, where precision resistors go to semiconductor equipment makers, semiconductor device makers building their own test systems, data center equipment and long-haul high-speed fiber-optics transmission gear. That makes VPG a picks-and-shovels participant in the build-out rather than a builder of it.

Market Cap—
Revenue (TTM)$413M
Revenue Growth+39.9%
EBITDA Margin (TTM)7.0%
Net Cash$59.7M
Earnings Beats3 of 7
P/E (TTM)—
EV/EBITDA (TTM)—

What We Like

  • Sensors bookings reached $48.1M in Q2 FY2026, an all-time quarterly record, and consolidated book-to-bill has been at or above 1.0 for seven straight quarters.
  • Total backlog rose to $135.8M at Q2, up about $10M-$11M sequentially.
  • The cost-reduction program is being delivered: $600k in Q1, about $1M in Q2 and $1.6M in H1 against a ~$6M FY2026 target and a >$20M, three-year goal.
  • The balance sheet carries $75.7M of cash against $15.6M of long-term debt — roughly $60M of net cash — after a $5M debt paydown that reduces net interest cost by about $300k a year.
  • Two factual milestones are on the record: a formal humanoid vendor nomination letter after more than two years of engineering collaboration, and verified aerospace and defense demand — NASA's Artemis II carries DTS data loggers, with DTS modules used in SpaceX Dragon and Blue Origin work.

What We’re Watching

  • H2 2026 is the concentrated proof window: the delayed KELK shipments, the balance of the ~$6M cost-savings target, the price-increase benefit, the humanoid ramp and the $45M business-development bookings goal are all weighted to the second half.
  • Sensors gross margin fell to 31.5% in Q2 from 34.8% in Q1 on FX, higher material costs and wage increases from hiring ahead of volume. Sensors is the lowest-margin of the three segments and carries the AI exposure.
  • Humanoid sales fell to $320k in Q2 from about $600k in Q1, against the prior call's expectation to 'more than double'; the ~50% annual growth assumption was not reiterated on the Q2 call.
  • CFO William M. Clancy retires effective Dec 31, 2026, and we found no successor named.
Bottom Line

The demand side of the thesis is strengthening and the financial side is not yet following. Bookings, backlog and the mix rotation toward semiconductor equipment, data center, fiber optics and defense are all supported by disclosed numbers, and the cost-reduction program is landing on schedule. Against that, revenue has been flat for two quarters at about $84M, gross margin is roughly flat at 38.6%, adjusted operating margin is under 2% and free cash flow is still negative. The open question is when the record order book converts into revenue, and whether it converts at a margin structure anywhere near the three-year target model.

Next upThe Q3 FY2026 print tests whether revenue lands inside the $84M-$89M guide and whether the delayed KELK orders begin to clear. The second half then carries the linked tests: the humanoid ramp, the remaining cost savings and the price-increase benefit.
Last Quarter — Q2 FY2026

Earnings

VPG reported Q2 FY2026 revenue of $83.9M, up 12% year over year and essentially flat sequentially, below the prior $85M-$90M guide. Management attributed the shortfall to a temporary delay of about $3M of shipments at its KELK business caused by a new ERP system. Total gross margin was 38.6%, which management called basically flat from the first quarter. Orders were $95.5M for a 1.14 book-to-bill, and Sensors bookings of $48.1M set an all-time quarterly record at 1.44. GAAP net loss was $1.7M.

MetricQ2 FY2026Q1 FY2026Q2 FY2025YoY
Revenue$168M$84.4M$75.2M+123.8%
Gross margin38.8%39.0%40.7%-190bps
EBITDA$4.1M$5.0M$6.6M−37.9%
EPS (GAAP)−$0.15−$0.02$0.02−1100.0%
Consolidated book-to-bill1.141.21—7th straight quarter at or above 1.0
Total backlog$135.8M$125.0M——
Table shows reported figures; the text may discuss adjusted or continuing-operations numbers.
so far, we received roughly about $1.5 million. deemed not to be material. it will be profit neutral.— William M. Clancy, Chief Financial Officer, Aug 5, 2026

Management tone: The Q1 FY2026 call was momentum-forward: record orders above $100M, the strongest book-to-bill since 2022, a newly introduced three-year operating model and a humanoid revenue expectation to more than double. The Q2 FY2026 call was more measured. Management led with the KELK ERP delay as the reason revenue missed guidance, disclosed total backlog for the first time in this transcript set, and quantified FX, tariff refunds and the magnitude of price increases. It reframed the humanoid story from near-term revenue to a forward milestone — the vendor nomination letter and an H2 2026 ramp — and it did not reconcile the Q2 humanoid revenue decline against the prior call's expectation.

Management Guidance

For Q3 FY2026, management guides revenue of $84M-$89M, assuming constant Q2 2026 foreign-exchange rates and excluding the roughly $1.5M of tariff refunds received so far, which it describes as profit neutral. For FY2026, it expects organic growth to exceed the 8%-10% target and double-digit revenue growth for the full year. Capex guidance was lowered to $10M-$12M from $14M-$16M, and the assumed operational tax rate was raised to about 30% from about 26%. Cost savings are targeted at roughly $6M for the year, with the balance in H2, and the delayed KELK orders are expected to ship by the end of Q4.

Business Trajectory

Trajectory

Reported revenue has been roughly flat for two quarters: $84.4M in Q1 FY2026, then $83.9M, after year-over-year growth slowed from 18% to 12%. The flat patch has identifiable causes — about $3M of KELK shipments delayed by the ERP implementation, FX, and segment mix. Underneath it the order book has strengthened: Q2 orders of $95.5M built backlog to $135.8M, and Sensors bookings set a record. The strain shows at the margin line. Total gross margin was 38.6% versus 39.0% in Q1, and Sensors gross margin fell to 31.5% from 34.8% as FX, materials and hiring costs outran volume. Adjusted EBITDA was $5.5M, or 6.5% of revenue, down from $5.9M and 7.0% in Q1.

Revenue & Margin Trajectory
RevenueGross margin (41% to 39%)$0$100$90.1M$168M41%Q4'22Q2'23Q4'23Q2'24Q4'24Q2'25Q4'25Q2'26
RevenueGross margin (40% to 39%)$0$100$75.7M$168MQ4'24Q2'25Q4'25Q2'26
Most recent quarters shown (8 on phones, 16 on larger screens). Gross margin as reported; gaps mean the figure was not reported.
Share Price — 12 Months
$50$100$15052-wk high $152$62Oct '25Jan '26AprJulOct '26
YTD +59.8%. 52-week range $29–$152.
Share Price — 12 Months
$50$100$15052-wk high $152$62Oct '25Jan '26AprJulOct '26
YTD +59.8%. 52-week range $29–$152.
The Numbers

The Model

The model projects revenue of $348.0M and EBITDA of $28M — an 8.1% margin — for the next fiscal year, rising to $388.0M of revenue and $44M of EBITDA, an 11.4% margin, the year after. The near-term anchor is the order book: record backlog and Sensors bookings converting as capacity and hiring come online. The second-year step depends on the margin path, since the company's own three-year target model calls for a 46.5% gross margin and an 18.5%-20.5% EBITDA margin against 38.6% and 6.5% in Q2 FY2026, with the cost-reduction program and price increases the visible levers.

Revenue & EBITDA Projections
REVENUE$307M$348M$388MFY25Next FY (E)FY after (E)EBITDA & MARGIN$30.3M$28.0M$44.0MFY25Next FY (E)FY after (E)
REVENUE$307M$348M$388MFY25Next FY (E)FY after (E)EBITDA & MARGIN$30.3M$28.0M$44.0MFY25Next FY (E)FY after (E)
Solid bars are reported actuals; outlined bars are model projections — not company guidance.
MetricFY2025Next FY (E)FY after (E)
Revenue$307M$348M$388M
YoY Growth—+13.3%+11.5%
EBITDA$30.3M$28.0M$44.0M
EBITDA Margin9.9%8.1%11.4%

Projections are the median of 5 independent model runs.

What Could Go Right — and Wrong

What good looks like
  • The record order book converts: $135.8M of backlog and Sensors bookings of $48.1M move through to revenue as added manufacturing capacity and trained personnel come online.
  • Sensors gross margin re-expands from 31.5% as volume grows, the hiring learning curve ends and material and FX pressure eases.
  • The remaining balance of the FY2026 cost-savings target lands in H2 and the price-increase program shows up in the P&L.
  • The humanoid ramp begins in H2 2026 under the vendor nomination letter, lifting humanoid sales above the $320k booked in Q2.
  • The AI-infrastructure order wave continues, consistent with neighbor demand — Applied Materials guiding to $10.25B, KLA raising its wafer-fab-equipment outlook and Coherent booked through calendar 2027.
What could go wrong
  • Revenue stays essentially flat sequentially while backlog builds, if capacity, labor or supply stay the gate on conversion.
  • The margin path fails its first H2 2026 checkpoint, leaving adjusted operating margin near 1.7% and putting the three-year target model in question.
  • The humanoid ramp slips again or the initial customer resets, stranding capacity, personnel and raw material committed against one customer's forecast.
  • A second self-inflicted operational event, like the KELK ERP shipment delay, lands in the concentrated second-half window.
  • AI-infrastructure capex turns before the mix shift completes, and VPG takes the hit in the segment with the least margin buffer.
What’s Next

Looking Ahead

The next twelve months run through the second half of FY2026, where nearly every commitment is weighted: the delayed KELK shipments, the balance of the cost-savings target, price-increase benefits, the humanoid production ramp under the vendor nomination letter, and the $45M business-development bookings goal. DSI order intake is expected to improve in Q3 FY2026 after a soft second quarter. The CFO seat turns over on Dec 31, 2026, and we found no successor named.

Catalysts
  • Q3 FY2026Q3 revenue guide test — Guided to $84M-$89M at constant Q2 FX; excludes tariff refunds.
  • Q3 FY2026DSI order intake — Management expects improved intake after a soft second quarter.
  • Q3-Q4 FY2026KELK shipment recovery — About $3M delayed; some Q3 improvement, larger output in Q4.
  • H2 2026Humanoid production ramp — Nomination letter points to a ramp beginning in the second half.
  • H2 2026Cost-savings balance — Remainder of the roughly $6M FY26 target is weighted to H2.
  • Dec 31, 2026CFO succession — Clancy retires; we found no successor named.
Numbers

Financials

Annual Summary

MetricFY2024FY2025TTMYoY
Revenue$307M$307M$413M+0.2%
Gross Margin40.9%38.9%38.7%200bps
EBITDA$32.7M$30.3M$28.8M-7.3%
EBITDA Margin10.7%9.9%7.0%80bps
Net Income$9.9M$5.3M$3.7M-46.5%
Free Cash Flow$10.1M$6.3M−$7.5M—
Net Cash——$59.7M—

Net Cash = total debt minus cash and short-term investments at Jul 4, 2026. A company’s own leverage measure can differ.

Key Ratios (Trailing)

Valuation
  • P/E TTM—
  • EV/EBITDA TTM—
  • EV/Revenue TTM—
  • Price/FCF TTM—
Profitability
  • Gross Margin (TTM)38.7%
  • EBITDA Margin (TTM)7.0%
  • Net Margin (TTM)0.9%
  • ROIC3.6%
  • FCF Conversion-26.0%
  • SBC / Revenue0.2%
Reference

The Company

VPG makes precision measurement and sensing components: precision resistors and strain gages, load cells and force-measurement transducers, and specialized measurement systems for steel production, materials development and safety testing. The company describes its products as 'designed-in' — qualified into a customer's design and carried through the product's life — which is the structural reason a sale, once won, tends to persist. Its AI-infrastructure exposure runs through the Sensors segment, where precision resistors go to semiconductor OEM equipment makers, to semiconductor device makers for their own custom test systems, into data center equipment and into long-haul high-speed fiber-optics transmission equipment.

The company reports in three segments — Sensors, Weighing Solutions and Measurement Systems — and manufactures across Israel, the United States, Canada, India, Germany, Japan, Sweden, the United Kingdom, China, Taiwan and France, with its headquarters in Chesterbrook, Pennsylvania. Israel is the concentration that matters: two manufacturing facilities there make products representing approximately 30% of total worldwide revenues, per the FY2026 Q1 10-Q. Management has described its infrastructure as large enough to consolidate within, and the three-year cost program is framed around manufacturing footprint optimization, increased automation and procurement efficiencies rather than new construction.

Business Segments

Sensors
$33.4M Q2 FY2026 revenue
Precision resistors, strain gages and advanced sensors; carries the AI-infrastructure and semiconductor-equipment demand.
Growth driver: AI infrastructure, semiconductor equipment and defense orders
Weighing Solutions
$30.3M Q2 FY2026 revenue
Load cells, force measurement transducers, onboard weighing and over-load monitoring across five businesses.
Growth driver: Cost reductions and favorable mix; transportation demand
Measurement Systems
~$20.2M Q2 FY2026 revenue (derived as remainder)
KELK, DSI, Pacific Instruments and DTS: rolling force systems, optical gages, simulators and data acquisition.
Growth driver: Aerospace and defense programs; steel and DSI project timing

Competitive Landscape

Competition is by product area, and it starts at the design stage, because VPG's products are qualified into customer designs rather than bought off the shelf. The 10-K lists named competitors across foil resistors, strain gages, load cells, onboard weighing, steel measurement systems and data acquisition. One structural oddity: Vishay Intertechnology appears both as a named foil-resistor competitor and as a supplier, and VPG was historically spun out of Vishay. The sharpest competitive fact we found is a pricing asymmetry — Vishay Intertechnology says it is repricing backlog and has announced price increases on roughly one-third of running part numbers, while VPG says it can place increases only on new orders, not on existing backlog.

  • Vishay Intertechnology
    Named in the 10-K as a foil-resistor competitor and appears as a supplier in the relationship graph; VPG was historically spun out of Vishay. The only competitor the transcripts discuss, and on pricing: VSH says it is repricing backlog, while VPG says it cannot.
  • HBK (an operating company of Spectris)
    Named in the 10-K for strain gages and for load cells; not discussed.
  • Zemic
    Named in the 10-K for strain gages and for load cells; not discussed.
  • Named in the 10-K for steel-market measurement systems; not discussed.
  • Kistler
    Named in the 10-K for data acquisition; not discussed.
Competitor names are taken from the FY2025 10-K's product-area list; only Vishay Intertechnology is discussed in the transcripts, and only on pricing.

Supply Chain

VPG appears to sit one or two layers upstream of the AI build-out, supplying precision components — resistors into semiconductor equipment, data center gear and fiber-optic transmission equipment. We found no data-center power, cooling or utility counterparties in the materials we reviewed, and no neighbor names VPG directly.

Sole Source
Unnamed single vendor
Sole-source supply of some of the most highly specialized materials for VPG's sensors (10-K)
Supplier
Nickel-chromium specialty alloys for Bulk Metal Foil — supply-chain map data, no company quote
→
Designed-in precision sensing
VPG
Three segments: Sensors, Weighing Solutions and Measurement Systems.
→
NASA
DTS data loggers aboard Artemis II, measuring launch and reentry forces
SpaceX
DTS modules used in Dragon crew capsule testing
Blue Origin
DTS modules used on launch platforms
Humanoid robotics customers
<1% of revenue
Unnamed; Q2 FY2026 humanoid sales $320k, bookings ~$500k

Analysis updated Sep 22, 2026, reviewing Q2 FY2026. Prices delayed. Built with The Buildout’s published methodology. Not investment advice. No positions held. © The Buildout 2026.

More on VPG: Earnings recap