Tuesday, November 24, 2026
7 companies we cover report on this day. What to watch, the numbers so far, and who else in the supply chain has already reported.
The Buildout is a website built by one person using AI agents, and could have factual errors. Not investment advice.
Dycom Industries DY
Dycom builds fiber networks and data-center electrical systems, placing it in the construction layer of the AI infrastructure buildout.
Where the evidence pointsEstimates sit 3.1% below last quarter's revenue with EPS at $4.56, while backlog conversion and the FY27 outlook decide the read.
Analog Devices ADI
Analog Devices makes analog and power-management chips that control power and optical signals in AI data centers.
Where the evidence pointsAnalysts model $4.33B revenue and $3.90 EPS against a Q4 guide of $4.3B ±$100M and $3.86 ±$0.15; data center and OCS growth decide the read.
Nutanix NTNX
Nutanix sells hybrid multicloud software for running applications and AI across data centers and clouds, a layer in the AI infrastructure stack.
HP HPQ
HP makes personal computers, workstations and printers that bring AI computing to the edge.
Where the evidence pointsEstimates sit below last quarter, while four straight EPS beats and supportive AI peers frame the quarter; Personal Systems margin is the swing factor.
Dell Technologies DELL
Dell makes AI-optimized servers, storage, networking, and PCs, and integrates AI infrastructure into factory-built rack systems for data centers.
Where the evidence pointsRevenue is estimated at $49.32B, 5.0% above last quarter, while EPS is estimated at $6.60 versus $7.04; AI orders and backlog are the swing factor.
CleanSpark CLSK
CleanSpark owns and operates data centers and power assets, converting bitcoin-mining sites into powered AI and high-performance-computing hosting.
Where the evidence pointsEstimates sit at $130M revenue and −$0.35 EPS against $138M and −$0.89 last quarter, while the first AI tenant is the swing factor.
Autodesk ADSK
Autodesk sells subscription design software for construction, engineering and manufacturing firms that build physical infrastructure; it is an applied-AI platform, not a chip, server, cooling or power supplier.
Where the evidence pointsRevenue and EPS estimates sit near the middle of Q3 guidance, while billings, MaintainX's second-half contribution and EBA renewal timing decide the read.