Constellation Energy Corporation earnings recap
Q3 FY2026, reported November 9, 2026 · Beat 5 of last 7 quarters
Constellation Energy Corporation reported Q3 FY2026 revenue of $9.55B, a beat of 3.4% against consensus, and EPS of $5.06, a beat of 29.7%.
The Buildout is a website built by one person using AI agents, and could have factual errors.
Constellation is converting the nuclear fleet into long-duration contracted infrastructure for data-economy load - more than 90 million MWh signed into the 2040s, with roughly 45% of clean baseload contracted beyond the PTC floor by 2032 - which shifts a large share of future cash flow away from spot power forwards. The uprate program (~1,200 MW for about $4.3B, with $5B of conditional DOE financing) and the Peak+ structure show a path to add firm capacity years ahead of new build by pairing existing sites with storage, demand response or new peaking supply. Progress on PJM co-location and interim transmission service could determine how quickly large loads actually connect.
| Estimate | Actual | vs est | ||
|---|---|---|---|---|
| Revenue | $9.23B | $9.55B | +3.4% | beat |
| EPS | $3.90 | $5.06 | +29.7% | beat |
Constellation reported Q3 GAAP earnings of $5.19 per share and adjusted operating earnings of $5.06 per share, $2.02 above the prior-year quarter, driven primarily by Calpine accretion in its seasonally strong summer months, with additional help from commercial performance and higher PJM capacity prices, partly offset by lower PTC revenue versus a year ago when more plants were in the PTC zone. The nuclear fleet ran a 97.2% capacity factor in the quarter and 99.2% across June through August with no unplanned outage days, and the Byron Unit 2 low-pressure turbine upgrade finished more than a week faster than the vendor's prior world record and under budget. Since the last call the company signed three additional long-term agreements totaling about 4,560 MW, including a 20-year PJM deal with an undisclosed investment-grade data-economy customer for 270 MW of unit-contingent energy and capacity under the new Peak+ offering. Capital deployment continued with roughly $3B of buybacks in about seven months, including $800M in Q3, and an agreement to acquire the 609 MW Rhode Island State Energy Center. Crane remains on track to restart in the second half of 2027, a year ahead of schedule and under budget, with first fuel assemblies and transformers on site and a favorable final environmental assessment from the NRC.
Management raised and narrowed full-year adjusted operating earnings guidance to $12.50-$12.80 per share, with CFO Shane Smith noting the low end now sits at the top of the guidance given at Q2 and $0.50 above the top of the original March range; 2027 and 2028 guidance plus a refreshed growth outlook through 2030 will come on the year-end call. The central message was duration: more than 90 million MWh is now under long-term agreements reaching into the 2040s, roughly 94 million MWh by the 2040s, with about 45% of the clean baseload fleet contracted beyond the PTC floor by 2032, and Joe Dominguez said more than 100 million MWh of existing clean generation remains available for further premium contracts. The newly disclosed uprate program adds ~1,200 MW at a total cost of about $4.3B, $3.0B of it incremental growth capital in 2028-2032, and a $5B conditional DOE loan commitment (30-year tenor at Treasuries plus 37.5 basis points, up to 80% of eligible costs, roughly $40M of annual pretax interest savings if fully used) supports as much as $6B of qualified investment. Dominguez also introduced Constellation Peak+, a product pairing existing nuclear energy with new capacity, storage or demand response, priced competitively against the $110-$130 per MWh levelized cost of a new combined-cycle plant, and said the first 270 MW PJM deal is one of several opportunities in the pipeline. Management reiterated that 2027 remains a good starting point for models because the deals struck this year ramp beginning in 2028, that it has locked in an incremental $0.25 of base earnings since March, and that a capital allocation and buyback update will come on or before the Q4 call.
“We are raising and narrowing full year adjusted operating earnings guidance to $12.50 to $12.80 per share. The low end of our newly revised range is equal to the top of our prior guidance, which we had significantly revised upward in the second quarter.”
on Guidance raise
“We still have a huge opportunity ahead of us with more than 100 million megawatt-hours of existing clean generation available for premium long-term agreements.”
on Remaining contracting runway
“Constellation's unparalleled ability to pair simpler and less risky capacity solutions with our large volume of clean energy is a compelling solution for all of our customers and where you are going to get a share of this market. This dog hunts, and we expect to have continued success going forward.”
on Peak+ product
How should we think about the economics of the newly announced Peak+ product, and how much of it becomes a template for future deals outside the uprate opportunities?
Dominguez said Peak+ can price existing nuclear clean megawatts well within the $110-$130 per MWh range versus a new build or renewables-plus-storage, while still delivering value above the PTC floor, and it avoids interconnection, construction and emissions-regulation risk. He declined to size the uptake, citing his prior mistake on projections, but pointed to the team's record of closing deals; Smith added that the $20-$50 per MWh sensitivity still applies as the next lever for contracting the existing fleet, with disclosure to follow at year-end.
With nuclear electrons increasingly scarce, does the $20 to $50 premium to PTC levels still apply on incremental deals, and could that range widen based on the attributes embedded?
Dominguez said that range remains the right sensitivity, with the PTC floor as the launching point and the floor itself escalating over time as inflation runs above prior expectations. On marketing clean attributes separately, he said the attributes are embedded in that range for now, though clients vary in how much they buy, and any attributes not sold are marketed to other clients - a dynamic Smith said shows up in the commercial margin rather than the contracted clean megawatt disclosures.
What is the expected process and direction for the PJM co-location proceeding and the show cause orders, including what PJM will propose?
David Dardis said compliance filings from the RTOs are expected within a couple of weeks with FERC action likely in the first quarter, and that FERC has been clear in supporting co-location and directing RTOs to accommodate it, including interim new transmission services. Dominguez added that FERC rejected PJM's earlier suggestion of a 2029 filing as too late, and that co-location avoids building massive transmission lines on sites that already have land and interconnection, leaving him cautiously optimistic for answers in the first half of the year.