Terex Corporation earnings recap

Q3 FY2026, reported October 28, 2026 · Beat 6 of last 6 quarters

Terex Corporation reported Q3 FY2026 revenue of $2.20B, a beat of 1.7% against consensus, and EPS of $1.50, a beat of 4.9%.

The Buildout is a website built by one person using AI agents, and could have factual errors.

Go to the full Terex Corporation company page →See the earnings preview →Terex Corporation is in the Construction layer →
What this means for the buildout

The demand drivers behind the buildout remain intact and visible in orders: data centers, power and utility grid work supported Materials Processing's two-year-high backlog and drove utilities capacity additions of 250 trucks in the last 12 months with another 250 planned, plus new utility truck production at Fort Payne. The friction this quarter came from the supply side of that buildout — Waukesha ramp inefficiencies, freight inflation and the three-to-nine-month lag in passing costs through — rather than from demand, which is a useful read on where physical capacity and logistics, not order books, are the current constraint. Progress on the Aerials separation toward active engagement with strategic counterparties could reshape the access-equipment competitive landscape.

Results vs consensus
EstimateActualvs est
Revenue$2.16B$2.20B+1.7%beat
EPS$1.43$1.50+4.9%beat
What was said

Terex reported third-quarter sales of $2.2 billion, up approximately 12% year over year on a pro forma basis, adjusted EBITDA of $286 million at a 13.0% margin, and adjusted diluted EPS of $1.50. Pro forma orders rose 53% to $2.3 billion with growth across all four segments and book-to-bill of roughly 103%, lifting backlog to $7 billion. Materials Processing sales grew 11.3% to $434 million with margin up 530 basis points to 19.3% and backlog nearly doubling to a two-year high; Specialty Vehicles sales rose 8.1% to $657 million at a 16.0% margin; Aerials sales rose 32% to $709 million with margin down 180 basis points year over year but up 300 basis points sequentially; and Environmental Solutions sales fell 8% to $400 million with margin down 390 basis points to 15.3% on utilities ramp inefficiencies and refuse channel adjustments. Operating cash flow was $241 million and free cash flow $209 million, net leverage held at 2.3x, and the company repurchased $72 million of shares, paid $19 million of dividends and repaid $113 million of debt, while the board authorized a new $500 million repurchase program.

Key metrics
Pro forma orders
+53% YoY
Bookings of $2.3B with growth in all four segments; consolidated book-to-bill ~103%, above typical seasonality
Backlog
$7.0B
Bookings exceeded sales in Materials Processing, Specialty Vehicles and Environmental Solutions; MP backlog at a two-year high
Adjusted EBITDA
$286M (13.0% margin)
Up $35M / ~14% on a pro forma basis; margin 13.0% vs 12.8% pro forma prior year despite tariff and inflation headwinds
Materials Processing margin
19.3% (+530 bps)
Segment sales +11.3% to $434M on mobile crusher and screener demand; price/cost discipline and improved absorption
Free cash flow
$209M
Operating cash flow $241M on $32M capex; net working capital 15% of sales vs 18.1% pro forma a year ago
Management outlook

Management refined rather than reaffirmed its full-year outlook, trimming adjusted pro forma EBITDA to $930M-$960M from a prior $960M-$1B range and setting sales at $8.0B-$8.2B, or roughly 8% pro forma growth at the midpoint, with adjusted EPS of $4.80-$5.00. CFO Jennifer Kong-Picarello attributed about half of the EBITDA reduction to segment mix (Environmental Solutions' full-year sales outlook cut to flat from low single-digit growth, partly offset by Aerials moving toward mid-teens), roughly a quarter to higher freight costs, and the remainder to utilities ramp inefficiencies and the Capacity and Lay-Mor divestitures, which carry $125M-$150M of annualized revenue at mid-to-high single-digit EBITDA margins. Free cash flow guidance was raised to $360M-$400M on working capital efficiency, with capex of $145M, a 19% effective tax rate and approximately $180M of interest and other expense. Management framed the cost pressure as largely timing-related, expecting inflation and freight to be recovered through mitigation and customer surcharges with a three-to-nine-month lag, and expecting Waukesha ramp inefficiencies to persist through Q4 and normalize as the company exits into early 2027. On the aerial separation, Simon Meester said the company has moved from evaluating inbound interest to active engagement with multiple strategic counterparties but declined to name counterparties or set a timeline. Capacity work continues: first units from the expanded Brandon, South Dakota plant ship in Q4, Ocala, Florida begins in Q2 2027 with both at mature rates by end of 2027, and a further 250 utility trucks are planned for next year with Fort Payne now able to build utility trucks alongside refuse.

From the call

“we initially anticipated a V-shaped recovery, and now it is going to be more of a U-shaped recovery. So that is why we feel good about ESG and utilities, for that matter, going into 2027 but it is just going to be pushed out by another quarter, and that is what it is driving the guide.”

on Refuse recovery timing

“Since our last update, we have made good progress advanced the carve out work and moved from evaluating inbound interest to active engagement with multiple strategic counterparties.”

on Aerials separation process

“We think a sustainable lead time for this industry is about 12 months, and we are well over 24.”

on Fire apparatus lead times and capacity

What analysts asked

Can you bridge Q4 margin progression by segment, and how much of the cost pressure is discrete to Q4 versus carried into 2027?

Jennifer Kong-Picarello said Aerials and Specialty Vehicles step down seasonally on holiday shipment timing and factory shutdowns, while Materials Processing and Environmental Solutions see higher Q4 revenue but MP faces unfavorable mix from more material handling and concrete. The outlook includes additional freight inflation incurred in Q3 and carried into Q4; inflation is described as a timing issue with mitigation and customer surcharges landing over a three-to-nine-month lag, and Waukesha ramp inefficiencies continuing through Q4 before normalizing entering 2027. Simon Meester added that MP and SV had some one-timers in Q3 so their margins should not be baselined, but all four segments are positioned for continued margin expansion in 2027, with Environmental Solutions especially helped by volume from a healthy backlog.

Q3 looked broadly in line, yet $30M-$40M has come out of the EBITDA guide entirely from Q4 — which segments are bearing that?

Jennifer Kong-Picarello said roughly 50% of the reduction is segment mix, with Environmental Solutions top-line growth cut from low single digit to flat and Aerials raised toward mid-teens; about 25% is higher freight incurred in Q3 and expected to continue in Q4, the biggest change versus prior guidance; and the remaining 25% is utilities ramp inefficiencies plus the Capacity and Lay-Mor divestitures.

How much carve-out work remains on Aerials, is the holdup deal structure or price, and does the $500M buyback authorization signal how Genie proceeds will be used?

Simon Meester said substantial carve-out work has been completed over roughly nine months on legal entities and tax structure but declined to characterize counterparties, structure or price, saying only that the process is disciplined and focused on value and certainty. Jennifer Kong-Picarello said it is too premature to read anything into the $500M authorization, calling it normal course of business alongside the $111M remaining on prior authorizations for $611M of total capacity, and said repurchases will continue opportunistically with or without an Aerials sale.

Potential supply chain impact
OSKTerex's refuse channel adjustments are described as largely behind it with ESG bookings at a seven-quarter high and a U-shaped rather than V-shaped recovery, which could be a directional signal for refuse body demand at Oshkosh's McNeilus business; Aerials bookings up 194% may likewise hint at access-equipment demand strength relevant to JLG, though competitive share shifts are not disclosed.
FSSESG bookings rose 36% to a seven-quarter high as refuse collection vehicle orders improved for a second consecutive quarter, which may indicate a broader municipal replacement cycle forming across refuse body competitors, though Terex attributed part of the improvement to its own channel normalization.
MECAerial bookings of $646 million (+194%) tied to national accounts on large infrastructure projects and a $852 million backlog could signal firmer MEWP demand across the category, though the concentration in large national-account projects may not read evenly across smaller MEWP competitors.
CATMaterials Processing bookings rose 41% with a notable increase in concrete equipment orders and a two-year-high backlog, which may point to improving construction equipment demand in adjacent categories where Caterpillar competes, including the material handling overlap cited in filings.
MTWThe documented crane overlap carries limited read-through now that Terex has exited the Cranes business via the earlier divestitures and is divesting Capacity and Lay-Mor; Materials Processing's material handling commentary is the closer adjacency, and any read to crane demand is speculative.