The Timken Company (TKR) | The Buildout — AI Infrastructure

——Mkt cap — · 52-wk —–— · YTD — · delayed
Updated Oct 19, 2026Q2 FY2026 reviewed
The Timken Company makes engineered bearings and industrial motion products used in automated factories, robots and data-center construction.
Q2 sales $1.26B
Up 7.5% y/y; organic growth of 4.4%.
IM margin up 500 bps
Industrial Motion margin 23.3% on record $454M sales.
80/20 at 60% of rev
Target 75% by Q3 2026; bottom-line benefit expected 2027.
AI revenue not sized
Management says it has some direct data-center content, unquantified.
The Buildout Takeaway
The story is a mix shift: faster-growing, higher-margin Industrial Motion now carries more of the company while bearings supply the steadier base, and announced portfolio actions are meant to make that shift structural. The open question is whether the AI-linked piece — automation and robotics, linear motion, lubrication — ever gets sized, because management does not report it.
24 analysts·14 Buy10 Hold0 Sell
Median target$144  Range $117–$160 · 9 estimates

FY2026: total sales up 5% to 6% · organic up 3.5% at midpoint · adjusted EPS $6.05 to $6.35 · adjusted EBITDA margin low 18% at midpoint · free cash flow $375 million to $400 million
Important: The Buildout is a data analytics platform. Content is generated by algorithms and AI agents using public filings, earnings transcripts, and market data. This is not personalized investment advice.
Our View

The Verdict

The Timken Company makes engineered bearings and industrial motion products: roller, ball, plain and housed bearings, plus linear motion, industrial drives, lubrication systems, precision gears, chain, couplings, clutches and seals. Those parts sit inside machines that move or turn — automated factory equipment, warehouse and medical robots, and the pumps, chillers, turbines and generators that data-center construction and electrification pull through. The analysis frames this as "physical AI," and management describes the company as "an advanced motion technology leader." Timken is not a compute, software or semiconductor business; its link to the AI buildout is physical and largely indirect.

Market Cap—
Revenue (TTM)$4.8B
Revenue Growth+5.5%
EBITDA Margin (TTM)16.2%
Net Debt$1.7B
Earnings Beats6 of 7
P/E (TTM)—
EV/EBITDA (TTM)—

What We Like

  • Industrial Motion posted two consecutive all-time quarterly sales records: $425 million in Q1 2026 and $454 million in Q2 2026, where organic growth was 8%.
  • Industrial Motion's Q2 2026 adjusted EBITDA margin was 23.3%, up 500 basis points year over year, and the Belts divestiture is expected to add more than 200 basis points on a pro forma basis.
  • Guidance was raised twice in two quarters; FY2026 adjusted EPS is now $6.05 to $6.35 and free cash flow is guided to $375 million to $400 million.
  • 80/20 engagement reached 60% of enterprise revenue in Q2 2026, with a 75% target by Q3 2026 and bottom-line benefit expected in 2027.
  • Net debt/adjusted EBITDA was 2.0x, described as the middle of the target range; the dividend was raised 3% to $0.36 and a new five-year, 10 million share repurchase authorization was approved.

What We’re Watching

  • 2H 2026 organic growth is implied at roughly 2.5%, a step down from the first half; management cites Middle East geopolitics, normal seasonality, tougher pricing comps and a Q3 Belts ramp-down.
  • The GAAP EPS outlook was cut to $3.75–$4.05 while adjusted EPS was raised to $6.05–$6.35; we found no explanation for the driver of that gap.
  • Q2 2026 included a non-repeating $8 million, or $0.08 per share, IEEPA tariff refund; management assumes no further refunds in 2H 2026.
  • Engineered Bearings adjusted EBITDA margin was 19.7% in Q1 2026, down from 20.9% a year earlier on higher operating costs, and 20.0% in Q2; the automotive OE exit's margin benefit is not expected until 2027.
Bottom Line

The thesis is strengthening on self-help. Two consecutive guidance raises, record Industrial Motion quarters, and portfolio actions with quantified margin benefits — Belts at more than 200 basis points pro forma, the automotive OE exit marked for 2027 — are all checkable, and the balance sheet is flexible at 2.0x net leverage with free cash flow guided up to $375–$400 million. The AI-linked vector is growing faster than the company but remains unsized, and management declined to give a 2027 margin bridge. The open question is whether 80/20 and the portfolio actions deliver the promised bottom-line benefit in 2027 — management says it does not expect volume declines related to 80/20 — and whether Engineered Bearings margins recover.

Next upBelts is expected to close in Q3 2026, which tests whether the more than 200 bps pro forma Industrial Motion margin lift arrives on time and how large stranded costs and the expected loss on sale turn out to be. After that, the next checkable milestone is 80/20 engagement at 75% of revenue by Q3 2026.
Last Quarter — Q2 FY2026

Earnings Beat

Timken reported Q2 2026 revenue of $1.26 billion, up 7.5% year over year, with organic growth of 4.4% and gross margin of 31.7%. Adjusted EPS was $1.83, up nearly 30%, and included a net $8 million, or $0.08 per share, IEEPA tariff refund. Industrial Motion set an all-time quarterly sales record at $454 million, up 14.6%.

MetricQ2 FY2026Q1 FY2026Q2 FY2025YoY
Revenue$1.3B$1.2B$1.2B+7.5%
Gross margin31.7%30.3%30.9%+80bps
EBITDA$144M$233M$205M−29.5%
EPS (GAAP)$0.41$1.40$1.12−63.1%
Adjusted EPS$1.83$1.67n/aUp nearly 30% y/y
Industrial Motion sales$454M$425Mn/a+14.6% y/y
Table shows reported figures; the text may discuss adjusted or continuing-operations numbers.
We don't see any signs today of slowdown… But I would call it robust. I would not call it a bounce back.— Lucian Boldea, CEO, Aug 6, 2026

Management tone: Management's tone stayed confident but deliberately tempered between the two calls. On the Q1 2026 call it raised guidance and called the order book "cautiously optimistic"; on the Q2 2026 call it raised guidance again, said it saw no signs today of slowdown, and still declined to call a cyclical boom — "I would call it robust. I would not call it a bounce back." It was candid about the non-repeating tariff refund, the deliberate aerospace investment cost and the 2H organic step-down to roughly 2.5%, and it pushed back on a channel narrative of a July 1 price increase: "we've not announced a price increase for July 1 this year."

Management Guidance

Management guided FY2026 total sales up 5% to 6%, organic up 3.5% at the midpoint, adjusted EPS of $6.05 to $6.35, adjusted EBITDA margin in the low 18% range at the midpoint, and free cash flow of $375 million to $400 million. The guide assumes no further IEEPA tariff refunds in 2H 2026, a $0.10 per-share headwind mostly for aerospace capacity investment plus higher logistics, pricing up more than 1%, Bijur Delimon adding 1% to revenue, currency of roughly 1%, and a Section 301 replacement for global tariffs it expects to be "a wash." It implies more than 30% incremental margin for the full year and 2H organic growth of roughly 2.5%, with Q3 sales up in both segments and adjusted EPS up year over year in both Q3 and Q4.

Business Trajectory

Trajectory

Revenue re-accelerated in 2026 after sequential declines in the second half of fiscal 2025: Q1 2026 sales were $1,231 million and Q2 2026 sales were $1,261 million, up 7.5% year over year. The computed signals show revenue accelerating, gross margin roughly stable, and operating and EBITDA margins expanding. The mix is doing the work — Industrial Motion grew 14.6% in Q2 while Engineered Bearings grew nearly 4%, and management says growth in the higher-margin segment shifts the company mix upward. Reported results also carry one-timers: Q2 included the $8 million tariff refund, and a $0.10 per-share headwind is budgeted for 2H 2026.

Revenue & Margin Trajectory
RevenueGross margin (29% to 32%)$0$500$1.0B$1.1B$1.3B$1.3BQ4'22Q2'23Q4'23Q2'24Q4'24Q2'25Q4'25Q2'26
RevenueGross margin (31% to 32%)$0$500$1.0B$1.1BQ4'24Q2'25Q4'25Q2'26
Most recent quarters shown (8 on phones, 16 on larger screens). Gross margin as reported; gaps mean the figure was not reported.
Share Price — 12 Months
$75$100$125$15052-wk high $146$113Oct '25Jan '26AprJulOct '26
YTD +34.5%. 52-week range $74–$146.
Share Price — 12 Months
$75$100$125$15052-wk high $146$113Oct '25Jan '26AprJulOct '26
YTD +34.5%. 52-week range $74–$146.
The Numbers

The Model

The model projects next fiscal year's revenue of $4,850 million with EBITDA of $902 million, an 18.6% margin, and the following fiscal year's revenue of $4,980 million with EBITDA of $986 million, a 19.8% margin. The near-term anchor is management's raised FY2026 guidance — total sales up 5% to 6% and adjusted EBITDA margin in the low 18% range at the midpoint — plus the expected Q3 2026 Belts close. The following fiscal year assumes the mix keeps shifting toward Industrial Motion and that 80/20 and the portfolio actions begin reaching the bottom line in 2027, which is when management expects that benefit.

Revenue & EBITDA Projections
REVENUE$4.6B$4.8B$5.0BFY25Next FY (E)FY after (E)EBITDA & MARGIN$796M$902M$986MFY25Next FY (E)FY after (E)
REVENUE$4.6B$4.8B$5.0BFY25Next FY (E)FY after (E)EBITDA & MARGIN$796M$902M$986MFY25Next FY (E)FY after (E)
Solid bars are reported actuals; outlined bars are model projections — not company guidance.
MetricFY2025Next FY (E)FY after (E)
Revenue$4.6B$4.8B$5.0B
YoY Growth—+5.9%+2.7%
EBITDA$796M$902M$986M
EBITDA Margin17.4%18.6%19.8%

Projections are the median of 5 independent model runs.

What Could Go Right — and Wrong

What good looks like
  • Industrial Motion holds mid-20s margins and adds the more than 200 basis points of pro forma lift from the Belts divestiture.
  • 80/20 delivers bottom-line benefit in 2027 without the volume declines management says it does not expect.
  • Aerospace capacity conversion turns the low-single-digit percentage headwind into revenue and margin expansion as the 6 to 9 month training curve rolls off.
  • The automotive OE exit restores Engineered Bearings margin expansion beginning in 2027, as management expects.
  • Management begins disclosing AI, data-center or automation/robotics revenue, making the physical-AI growth vector measurable.
What could go wrong
  • 2H 2026 organic growth falls short of the roughly 2.5% implied, if Middle East geopolitics or tariff uncertainty bites.
  • Industrial Motion margins revert as the tariff refund and favorable price mix normalize, and the 23.3% Q2 margin proves partly non-repeating.
  • The aerospace investment becomes a stranded cost if demand softens or the capacity ramp underdelivers.
  • The Belts close slips past Q3 2026, or stranded costs exceed the more than 200 bps pro forma margin lift.
  • The charges behind the widening GAAP-to-adjusted gap remain unexplained or grow beyond the current GAAP guide.
What’s Next

Looking Ahead

The next 12 months hinge on executing moves already announced rather than on new demand. Belts is expected to close in Q3 2026; 80/20 engagement is targeted at 75% of revenue by Q3 2026 with the bottom-line benefit in 2027; the automotive OE exit is expected to begin helping Engineered Bearings margins in 2027; and aerospace capacity is ramping through a 6 to 9 month training curve. Management has begun a footprint review under the new chief operating officer covering what management calls 120 factories and declined to give a 2027 margin bridge.

Catalysts
  • Q3 2026Belts divestiture close — Tests on-time close and the >200 bps pro forma Industrial Motion margin lift.
  • Q3 202680/20 at 75% of revenue — Checkable engagement milestone; bottom-line benefit targeted for 2027.
  • Q3 2026Q3 2026 results — Sales guided up in both segments; 2H organic implied near 2.5%.
  • 2027Automotive OE exit benefit — Expected to begin lifting Engineered Bearings margins.
Numbers

Financials

Annual Summary

MetricFY2024FY2025TTMYoY
Revenue$4.6B$4.6B$4.8B+0.2%
Gross Margin31.4%28.6%28.7%282bps
EBITDA$833M$796M$769M-4.4%
EBITDA Margin18.2%17.4%16.2%84bps
Net Income$353M$288M$259M-18.2%
Free Cash Flow$306M$406M$386M—
Net Debt——$1.7B—

Net Debt = total debt minus cash and short-term investments at Jun 30, 2026. A company’s own leverage measure can differ.

Key Ratios (Trailing)

Valuation
  • P/E TTM—
  • EV/EBITDA TTM—
  • EV/Revenue TTM—
  • Price/FCF TTM—
Profitability
  • Gross Margin (TTM)28.7%
  • EBITDA Margin (TTM)16.2%
  • Net Margin (TTM)5.4%
  • ROIC8.6%
  • FCF Conversion50.1%
  • SBC / Revenue0.6%
Reference

The Company

The Timken Company designs and manages a portfolio of engineered bearings and industrial motion products and provides related services. Founded in 1899 by Henry Timken, it describes itself as "the world's leading authority on tapered roller bearings" and has carried that position into a broader product range. It reports in two segments: Engineered Bearings and Industrial Motion, with Engineered Bearings at about 64% of Q2 2026 sales and Industrial Motion at about 36%.

As of Dec 31, 2025, the company reported 88 plants performing manufacturing, assembly or repair services, in the United States and 43 other countries including China, India and Romania; the Q2 2026 call referred to 120 factories under review, and we found no reconciliation between the two counts. Headquarters and the largest technical center are in North Canton, Ohio. Sales run about 60% through original equipment manufacturers and 40% through distribution and direct-to-end-user channels, according to the Q1 2026 10-Q.

Business Segments

Engineered Bearings
$807M in Q2 2026, up nearly 4%
Roller, ball, plain, housed and mounted bearings, including Timken tapered roller bearings and rod ends.
Growth driver: Aerospace/defense and infrastructure demand
Industrial Motion
$454M in Q2 2026, up 14.6%
Linear motion, industrial drives, lubrication systems, chain, couplings, clutches and brakes, and seals.
Growth driver: Automation and robotics; linear motion

Competitive Landscape

The 10-K states that Timken "competes with a variety of domestic and foreign manufacturers of anti-friction bearings, including SKF Group and Schaeffler Group, and with a diverse group of domestic and foreign manufacturers of industrial motion products." A map of likely supply relationships adds Japanese precision-gearing competitors Nabtesco and Harmonic Drive. The evidence appears to support a hard-to-replace position in bearing-grade specialty steel and aerospace applications, alongside robust competition in industrial motion and robotics gearing. Timken's stated differentiators are self-help and mix; we found no sole-source disclosures in the materials we reviewed.

  • SKF Group
    Named in the 10-K as an anti-friction bearing competitor.
  • Schaeffler Group
    Named in the 10-K alongside SKF as an anti-friction bearing competitor.
  • Gates Industrial Corporation plc (GTES)
    The buyer of Timken's belts business under a definitive agreement announced May 1, 2026; also appears in our map of likely supply relationships as a belts competitor.
  • Nabtesco (6268.T)
    Appears in our map of likely supply relationships as a precision cycloidal reduction gear competitor; not discussed by the company.
  • Harmonic Drive (6324.T)
    Appears in our map of likely supply relationships as a precision strain wave gearing competitor for robotics; not discussed by the company.
SKF Group and Schaeffler Group are named in the 10-K; Gates is documented in the belts transaction; Nabtesco and Harmonic Drive appear only in our map of likely supply relationships, not in company filings.

Supply Chain

Timken sits upstream of motion systems and downstream of specialty steel. It buys bearing-grade alloy bars and tubing, then sells bearings and motion products to industrial, aerospace, power and HVAC equipment makers through OEMs and distribution. Only Gates, the buyer of its belts business, names Timken directly.

Supplier
MTUS
Specialty bearing-grade steel alloy bars and tubing (inferred from our map of likely supply relationships)
Supplier
Tata Steel
Steel input (inferred from our map of likely supply relationships)
→
Tapered roller bearing authority
TKR
Designs and manages engineered bearings and industrial motion products, and provides related services.
→
U.S. government and contractors
~8% of net sales
Disclosed concentration for the three months ended Mar 31, 2026 (7% a year earlier)
HVAC and data-center cooling
Our map of likely supply relationships lists Trane and Carrier for chiller and HVAC bearings (inferred)
Power and grid equipment
Our map of likely supply relationships lists GE Vernova, Siemens Energy, Baker Hughes, Flowserve, Ingersoll Rand, Parker-Hannifin and Emerson (inferred)

Analysis updated Oct 19, 2026, reviewing Q2 FY2026. Prices delayed. Built with The Buildout’s published methodology. Not investment advice. No positions held. © The Buildout 2026.

More on TKR: Earnings recap