Veralto Corporation (VLTO) | The Buildout — AI Infrastructure
The Verdict
Veralto is a group of operating companies that make the equipment and chemistry used to monitor, treat and protect water, and to keep packaged goods authentic and compliant. Its Water Quality segment sells water analytics, UV and membrane disinfection systems and treatment chemicals; its Product Quality & Innovation segment sells marking and coding, packaging-design software, traceability and color-management tools. In the AI buildout, its role is indirect: data-center cooling and process-water needs pull demand for water treatment chemicals and analytics, and AI also sits inside its compliance software as a feature rather than the reason customers buy.
| Market Cap | — |
| Revenue (TTM) | $5.7B |
| Revenue Growth | +6.2% |
| EBITDA Margin (TTM) | 24.4% |
| Net Debt | $1.3B |
| Earnings Beats | 7 of 7 |
| P/E (TTM) | — |
| EV/EBITDA (TTM) | — |
What We Like
- Q2 2026 adjusted EPS grew 19.4% on 7.6% total sales growth and 4.2% core growth.
- Guidance raised twice in two quarters: FY26 adjusted EPS moved from $4.10–$4.20 to $4.20–$4.28 to $4.35–$4.43.
- Both segments accelerated sequentially from Q1 to Q2 2026: Water Quality core +3.8% to +5.7% and PQI core -1.0% to +2.0%.
- A new cost optimization program carries $65M–$75M of annual savings by 2028, with ~50% of run-rate in 2027.
- About 60% of revenue is recurring, and the M&A flywheel added In-Situ, GlobalVision, Alfaa UV and Cleanwater1.
What We’re Watching
- Q2 2026 margin expansion leaned on a nonrecurring $16M IEEPA tariff refund worth 110 bps; ex-refund margins were only in line with guidance.
- PQI's second-half ramp depends on three building blocks at once, and PQI core growth was just +2.0% in Q2.
- Data-center revenue stays unsized — management declined twice — so the AI linkage remains optionality rather than a modeled driver.
- High-growth markets were relatively flat; China Water Quality shrank and Latin America had project timing delays.
The thesis is strengthening on the operating numbers: two consecutive guidance raises, both segments accelerating, a cost program adding a structural layer, and strong free cash flow. The risks are concentrated in PQI's cyclicality, margin quality flattered by a one-time refund, and an AI/data-center exposure that is real but too small to size. The open question is whether PQI's second-half ramp and the PQI-led fourth-quarter margin uplift land as promised.
Earnings Beat
Q2 2026 total sales grew 7.6% year-over-year to $1,474 million, with core sales growth of 4.2%. Gross margin was 61.2%, up from 60.0% a year earlier. Standouts: free cash flow of $328 million, adjusted EPS up 19.4%, and both segments accelerating sequentially from Q1. Q2 margin included a nonrecurring $16 million IEEPA tariff refund worth 110 basis points.
| Metric | Q2 FY2026 | Q1 FY2026 | Q2 FY2025 | YoY |
|---|---|---|---|---|
| Revenue | $1.5B | $1.4B | $1.4B | +7.5% |
| Gross margin | 61.2% | 60.1% | 60.0% | +120bps |
| EBITDA | $344M | $362M | $332M | +3.6% |
| EPS (GAAP) | $0.98 | $1.02 | $0.89 | +10.4% |
| Free cash flow | $328M | $170M | $323M | +1.5% |
| Core sales growth | 4.2% | 1.9% | n/a | — |
you could think of ChemTreat Solutions in there to be strong double-digit growth— Honeycutt, CEO, Jul 29, 2026
Management tone: Management's language tightened across the two 2026 calls. Earlier framing used the words steady and balanced; the Q2 2026 call added step change in 2027 and 2028, firing on all cylinders, and a flywheel of innovation that is accelerating. Management was candid that Q2 margin expansion was substantially a nonrecurring tariff refund, and it drew a clear line between one-time items and operating performance.
Management Guidance
Management guided FY26 adjusted EPS to $4.35–$4.43, a second raise representing 12%–14% growth year-over-year. Second-half 2026 core sales growth is guided to approximately 5%–6%, led by volume with pricing moderating slightly but still at or slightly above the high end of the 100–200 bps range. Full-year margin expansion is guided to 25–50 bps, with roughly 25 bps in Q3 and more than 50 bps in Q4, largely led by PQI. The cost program is expected to add a few million dollars in Q4 2026, about 50% of run-rate savings in 2027 and full run-rate in 2028. No further IEEPA refunds are included in the second-half guide.
Trajectory
Revenue has held in a narrow band across the last four quarters — $1.40B, $1.40B, $1.42B and $1.47B — with the latest print up 3.7% sequentially. Core sales growth accelerated from 1.9% in Q1 2026 to 4.2% in Q2, and management guides it to roughly 5%–6% in the second half. Gross margin expanded 110 basis points, but operating and EBITDA margins compressed, and Q2's adjusted operating margin leaned on a nonrecurring $16 million tariff refund worth 110 basis points. Trailing free cash flow conversion was 106% of net income.
The Model
The model projects next fiscal year's revenue of $5.93B and EBITDA of $1.50B (25.2% margin), then the following fiscal year's revenue of $6.38B and EBITDA of $1.68B (26.3%). The near-term anchor is management's guided second-half core growth of roughly 5%–6% plus a small fourth-quarter cost-program lift; the following fiscal year assumes the cost program reaches full run-rate in 2028 and the M&A flywheel keeps adding recurring-revenue assets.
| Metric | FY2025 | Next FY (E) | FY after (E) |
|---|---|---|---|
| Revenue | $5.5B | $5.9B | $6.4B |
| YoY Growth | — | +7.9% | +7.5% |
| EBITDA | $1.4B | $1.5B | $1.7B |
| EBITDA Margin | 24.6% | 25.2% | 26.3% |
Projections are the median of 5 independent model runs.
What Could Go Right — and Wrong
- Second-half 2026 core sales growth of roughly 5%–6% arrives volume-led, confirming the mix shift away from price-led growth.
- PQI's three building blocks cooperate: digital workflow ACVs convert, marking and coding laps an easier Q4 comp, and packaging/color funnels recover.
- The cost program delivers about 50% of run-rate savings in 2027 and full run-rate in 2028, adding a second layer to the 30%–35% fall-through.
- Cleanwater1 closes and its ~25,000-unit installed base adds recurring revenue to Water Quality.
- ChemTreat Solutions keeps growing strong double-digit and management eventually sizes the data-center opportunity.
- PQI packaging and color weakness proves cyclical rather than nonrecurring, and the second-half PQI ramp slips.
- Component and memory inflation reaches Veralto's instrument costs beyond 'not material,' with an unnamed sole-source supplier exposure.
- High-growth markets stay flat, with China water funding stalled and Latin America project timing delayed.
- The cost program's back-end-loaded savings slip or restructuring disrupts operations.
- Rising debt from the $725M notes and the $465M Cleanwater1 deal lifts interest expense.
Looking Ahead
Over the next 12 months, the key tests are the guided second-half core acceleration to roughly 5%–6%, the PQI-led fourth-quarter margin uplift, and the first small cost-program contribution in Q4 2026. The Cleanwater1 acquisition, signed for $465 million, is pending with a close date not disclosed. Management also points to Trojan UV bookings that ship largely in Q4 2027 and to continued M&A from an active funnel.
- Q3 2026Q3 margin cadence — Tests the guided ~25 bps of margin expansion.
- Q4 2026Q4 PQI-led margin — Tests guidance for >50 bps expansion, largely led by PQI.
- Q4 2026First cost-program lift — Tests the 'few million' dollars of Q4 savings in the guide.
- Close pendingCleanwater1 acquisition close — Tests integration of a ~25,000-unit installed base.
- Q4 2027Trojan UV shipments — Long-cycle municipal bookings placed now ship as guided.
Financials
Annual Summary
| Metric | FY2024 | FY2025 | TTM | YoY |
|---|---|---|---|---|
| Revenue | $5.2B | $5.5B | $5.7B | +6.0% |
| Gross Margin | 59.6% | 60.0% | 60.2% | +33bps |
| EBITDA | $1.3B | $1.4B | $1.4B | +5.4% |
| EBITDA Margin | 24.8% | 24.6% | 24.4% | 14bps |
| Net Income | $833M | $940M | $988M | +12.8% |
| Free Cash Flow | $820M | $1.0B | $1.0B | — |
| Net Debt | — | — | $1.3B | — |
Net Debt = total debt minus cash and short-term investments at Jul 3, 2026. A company’s own leverage measure can differ.
Key Ratios (Trailing)
- P/E TTM—
- EV/EBITDA TTM—
- EV/Revenue TTM—
- Price/FCF TTM—
- Gross Margin (TTM)60.2%
- EBITDA Margin (TTM)24.4%
- Net Margin (TTM)17.3%
- ROIC23.5%
- FCF Conversion75.4%
- SBC / Revenue1.3%
The Company
Veralto is a group of operating companies whose stated purpose is 'Safeguarding the World's Most Vital Resources.' Its Water Quality segment sells water analytics, UV and membrane disinfection systems, and treatment chemicals used by public and private utilities and industrial customers, from source water to the consumer and back into the water cycle. Its Product Quality & Innovation segment sells marking and coding, packaging-design software, ingredient traceability and color management used by brand owners in consumer goods, food and beverage, pharmaceutical and industrial markets.
Veralto operates a decentralized model of individual operating companies under the Veralto Enterprise System, a continuous-improvement framework. It runs 60 facilities — 21 in the United States across 12 states and 39 outside, primarily in Europe — with about 17,000 associates. About 60% of revenue is recurring, and roughly 50% of water revenue comes from industrial applications, most of that in North America. The company describes a value-creation algorithm of mid-single-digit core sales growth with 30% to 35% fall-through, with a stated first bias toward M&A.
Business Segments
Competitive Landscape
Veralto describes its preference for sticky, razor-and-razorblade businesses where it sits inside the customer's operating environment; about 60% of revenue is recurring. In filings, Dover is a documented competitor in marking and coding through its Imaging & Identification segment, which competes with Veralto's Videojet. Xylem, Ecolab, Solenis and Mettler-Toledo also appear to be competitors, but those are not company-named.
- Dover (DOV)Documented competitor in marking and coding through Imaging & Identification.
- Xylem (XYL)Inferred competitor in water analytics and UV disinfection; also appears as a supplier of analyzers.
- Ecolab (ECL)Inferred competitor in industrial water treatment chemicals and data center cooling; also appears as a customer.
- SolenisInferred competitor in industrial water treatment chemicals.
- Mettler-Toledo (MTD)Inferred competitor in ultrapure water analytics for semiconductor manufacturing.
Supply Chain
Veralto sits upstream of water utilities and industrial water users, selling analytics, treatment chemicals and disinfection equipment. Its component suppliers are mostly inferred, and the 10-K flags sole-source supplier risk without naming any counterparty.
Related companies
See all Cooling companies → · How this layer works: Chapter 5, Cooling →
More on VLTO: Earnings recap