Thursday, August 13, 2026
15 companies we cover report on this day. What to watch, the numbers so far, and who else in the supply chain has already reported.
The Buildout is a website built by one person using AI agents, and could have factual errors. Not investment advice.
Pioneer Pow (PPSI)
Before MarketThe bar: Q1 revenue is down 36.7%, backlog is down about 40% YoY, and several product milestones are still open. The real story tonight is whether the new-product pipeline (1.25-MW power block, PowerCore, PRYMUS) generates orders or just costs. A good quarter beats the estimates; a great one would show a concrete order or LOI for the AI-adjacent power block or a firmer PowerCore/e-Boost deployment schedule.
Applied Industrial Technologies, Inc. (AIT)
Before MarketThe bar: AIT enters tonight with accelerating organic growth (+6%), double-digit Engineered Solutions order growth, a 1.0 book-to-bill, and net leverage of ~0.3x with $172M cash. The real narrative question is whether the technology vertical is becoming a durable growth engine rather than a project-lumpy tailwind. A good quarter keeps the margin and tax promises; a great one extends the tech vertical order visibility and shows M&A accretion starting to show up.
X-Energy, Inc. Class A Common Stock (XE)
Before MarketThe bar: Q1 revenue already doubled and the regulatory/supply milestone cadence gives the story momentum, but XE is pre-commercial with no disclosed backlog or guidance. The real story tonight is whether management can convert exploration agreements and the FONSI into binding customer commitments and a more definitive Seadrift timeline. A good quarter extends the milestone streak; a great one shows first orders or a disclosed construction/funding path for Dow Seadrift.
Ideal Power Inc. (IPWR)
Before MarketThe bar tonight is qualitative: with zero revenue, the focus is on funnel momentum and milestone timing. Management has set visible targets — U.S. hyperscaler evaluation end-Q4, lead Asia prototypes Q4, Stellantis deliverables mid-2026 — so the quarter likely reads as good if those dates hold and the >$300M funnel remains intact. A great quarter would include a disclosed conversion of an LOI or prototype into a purchase order, not just another funnel increase.
Gorilla Technology Group Inc. (GRRR)
Before MarketThe bar: Q1 revenue already grew 55% YoY, cash is sharply higher, and the $2B India AI order with Supermicro gives the AI narrative a concrete anchor. Tonight's real test is not the headline beat but whether management reaffirms the delivery schedule and the 100-150MW capacity target with enough specificity to de-risk the second half. A good quarter shows the security base holding while AI revenue begins to appear; a great one shows a named customer and a clear path to the 60-70% AI revenue mix.
HIVE Digital Technologies Ltd. (HIVE)
Before MarketThe mining side is the settled part — FY2026 revenue already printed $297.8M (+158% YoY) — but tonight is really about HPC execution. A good quarter would confirm mining cash flow and another step up in HPC ARR; a great one would show the Bell/Cohere contract and Boden/Toronto capacity making the $100M ARR target look conservative. At 10.4x EV/EBITDA, near the top of the recent range, so the bar is narrative, not just numbers.
Legence Corp. Class A Common stock (LGN)
Before MarketWith $5.4B backlog, 1.2x book-to-bill, and FY26 guidance already raised, the bar tonight is that backlog and guide, with EV/EBITDA at 32.6x. The real story is whether AI-linked fabrication expands beyond the disclosed $175–190M quarterly revenue and whether Bowers integrates without margin dilution. A good quarter is a beat and raise; a great one would show 2029 fabrication discussions converting to orders while data-center organic growth stays around or above 30%.
GDS Holdings Limited (GDS)
Before MarketWith YTD bookings already above 340 MW versus a 500 MW full-year target and bookings-plus-reservations above 1 GW, the near-term bookings bar is set. The real story is whether the 600 MW backlog converts to billable capacity on schedule and whether the ~4 GW landbank translates into follow-on orders over the next 1–2 years. A good quarter confirms booking momentum; a great one adds confidence on the H2 2027 move-in step-up and a funding path for the RMB 30–50bn investment plan without added leverage.
AirJoule Technologies Corporation (AIRJ)
After MarketTonight's bar is largely qualitative: for a pre-revenue name, it is reiterating unchanged FY2026 spend guidance and showing tangible progress on Prime, TenX, and the hyperscaler evaluation. The real story is whether the first operational Prime converts from a demonstration into paid deployments — that conversion, not the headline revenue number, would change the narrative. A good quarter keeps every promised milestone intact; a great one quantifies Prime's performance and names a paying customer or narrows deployment timing for 2027 revenue.
NET Power Inc. (NPWR)
After MarketTonight's bar is not a revenue beat — NPWR remains pre-revenue — but evidence that Project Permian is moving from promise to contract. The near-term milestones are sequential and achievable, so a clean reaffirmation of H2 2026 FID should keep the narrative intact. A good quarter would update progress on the JDA, gas MOU, and long-lead commitments; a great quarter would include a signed offtake or material long-lead commitments that meaningfully de-risk FID.
KULR Technology Group, Inc. (KULR)
After MarketThe bar starts from Q1's 98% YoY revenue growth and gross margin expansion to ~29%, but the bigger test is whether the 10,000-packs-per-month facility ramp and customer diversification are progressing. The real story tonight is the transition from design-in and prototype work to volume production, with AI BBU revenue still a 2027 event. A good quarter beats on revenue; a great one shows the new capacity is producing at scale, customer concentration is easing, and gross margins are holding above the mid-20s.
Corvex, Inc. (MOVE)
After MarketThe bar is the tiny pro forma base, and the quarter has to hold up against it, but the real test is whether management can show the 52%-customer story is broadening. The narrative changes only with evidence of capacity expansion funding, customer diversification, or Token Factory progress. A good quarter matches the $3.65M pro forma run-rate; a great one adds a concrete commercial or capital marker that separates MOVE from a one-customer neocloud.
Bit Digital, Inc. (BTBT)
After MarketThe near-term bar depends on WhiteFiber's contracted backlog, and Q1's 13.7% QoQ revenue decline and cloud's 13.1% drop mean a simple beat is not the real test. The narrative changes if management can show signed backlog growth — Nscale milestones or Boosteroid conversion — and a credible funding path for the next HPC build. A good quarter holds revenue roughly stable; a great one proves the $865M contract is converting into visible revenue while the balance-sheet and ETH overhang stays contained.
Applied Materials, Inc. (AMAT)
After MarketThe Q3 guide of $8.95B ± $500M and $3.36 ± $0.20 is the bar; customers' rolling 8-quarter forecasts and management's >80% WFE-growth tie to the AI segments where AMAT holds #1 positions sit behind it. The real story tonight is whether the CY2026 >30% WFE growth and advanced-packaging >50% growth language gets reinforced, and whether 2027 remains 'another strong record year.' A good quarter hits the guide; a great one would show advanced packaging accelerating, Sym3 Z scaling past 250 chambers, and gross margin holding above 50%.
TSS, Inc. (TSSI)
After MarketThe bar: SI growth is accelerating, the OEM is funding next-gen capacity, and RPO of $113M provides unusually visible revenue. The real narrative is whether the AI-rack integration scale-up can keep outpacing procurement drag while preserving the structurally wider margin. A good quarter beats on SI and EBITDA; a great one confirms the $17M expansion signal and lifts confidence in the top end of the $20-22M outlook.