Amrize Ltd earnings recap

Q3 FY2026, reported October 28, 2026 · Beat 0 of last 6 quarters

Amrize Ltd reported Q3 FY2026 revenue of $3.77B, a miss of 1.5% against consensus, and EPS of $1.02, a miss of 1.0%.

The Buildout is a website built by one person using AI agents, and could have factual errors.

Go to the full Amrize Ltd company page →See the earnings preview →Amrize Ltd is in the Construction layer →
What this means for the buildout

Amrize is a direct materials and roofing-systems supplier into the data center buildout, and this quarter gave concrete evidence of that: a 5-gigawatt campus in Texas taking cement, aggregates and ready-mix, plus Elevate PVC and TPO systems on data center and cold storage projects. Management also pointed to a pipeline of Building Materials project starts from last year's third and fourth quarters now converting into Building Envelope roofing demand, which could suggest the commercial mega project wave is moving from foundation work into envelope work. The offset is cost: petrochemical, freight and diesel inflation pushed Building Envelope price-over-cost positivity into 2027, so the buildout volume signal is arriving ahead of the margin signal.

Results vs consensus
EstimateActualvs est
Revenue$3.83B$3.77B-1.5%miss
EPS$1.03$1.02-1.0%miss
What was said

Revenue rose 2.2% to $3.77B, net income grew 3.3% to $558M and diluted EPS rose 4.1% to $1.02, with adjusted EBITDA slightly up year-over-year at $1.1B. Building Materials revenue increased 1.8% to $2.8B and adjusted EBITDA 2.7% to $938M, producing 30 bps of margin expansion as cement pricing turned positive (+1.8%) and aggregates pricing accelerated (+6.9%) while cement volumes fell 4.2% and aggregates volumes slipped 0.2% on weather in the Northeast, South and Central regions. Building Envelope revenue grew 3.6% to $929M on commercial roofing volumes and pricing across both commercial and residential, but adjusted EBITDA fell 14.6% as raw material and freight inflation outran price realization. The company spent $262M of CapEx in the quarter on cement plant expansions in Texas, Alberta and Quebec, terminal expansions and six aggregates quarry projects, closed Rapid Redi-Mix in Dallas-Fort Worth, and returned $1.1B to shareholders year-to-date, completing its $1B buyback authorization on October 28 at roughly 4% of share capital. Net leverage was 1.8x with $3.4B of total available liquidity.

Key metrics
Revenue
$3.77B
+2.2% YoY; price a $78M tailwind plus $23M of energy/fuel/freight surcharges, M&A added $77M, volumes a $69M headwind
Aggregates pricing
+6.9% YoY
Accelerated from +4% in Q2; broad-based across the geographic footprint after the April increase
Cement pricing
+1.8% YoY
Positive inflection versus the 0.2% decline reported last quarter; cement volumes -4.2% on weather
Building Materials adj. EBITDA
$938M
+2.7% YoY with margins up 30 bps on pricing, surcharges and ASPIRE savings, partly offset by freight and diesel inflation
Building Envelope adj. EBITDA
-14.6% YoY
Revenue +3.6% to $929M as commercial roofing volumes grew, but petrochemical raw material and freight inflation plus lower shingle volumes hit margins
Management outlook

Guidance was reset to ranges management describes as achievable under a variety of Q4 scenarios: full-year revenue of $12.2B-$12.4B and adjusted EBITDA of $2.95B-$3.05B. In Building Materials, cement pricing is expected to be positive in Q4 and flat to low single digit for the full year, aggregates pricing mid-single digit, and the segment is guided to remain price over cost positive in Q4. In Building Envelope, management expects the price-over-cost spread to improve sequentially in Q4 versus Q3 on pricing actions and surcharges, but the magnitude of year-over-year inflation has pushed expectations for price-over-cost positivity out to 2027. Q4 carries two headwinds: normal seasonal destocking weighing on shingle demand at the industry level, and a $36M net insurance benefit in the prior-year fourth quarter that will not repeat. ASPIRE remains on track for $80M of savings in 2026 and $250M through 2028, and capital allocation continues on three tracks: growth CapEx, bolt-on M&A and shareholder returns. Jan Jenisch framed 2027 as "a year of growth" with price momentum continuing, while flagging that the inflationary environment is the key variable outside management's control.

From the call

“In Hubbard, Texas, we are supplying cement, aggregates and ready-mix concrete for a new 5-gigawatt campus that represents the second largest data center under construction in Texas.”

on Data center demand

“I think you have seen that the cost inflation has accelerated from Q2 into Q3. Now very hard to predict what's going to happen next year. I think we're going to revisit that in more detail around the quarter 4. And fundamentally, we expect 2027 to be a year of growth for us.”

on 2027 outlook

“No, look, our strategy is not to import cement. I mean we have, as Amrize, a specific strategy to strengthen all our domestic supply chains.”

on Domestic supply chain

What analysts asked

With a lot of costs being absorbed this year, what pricing actions do you need in cement and aggregates to recover costs in 2027, and how confident are you in cost recovery in a softer, more volatile demand environment?

Jenisch said cost inflation accelerated from Q2 into Q3, that it is very hard to predict next year, and that the company will revisit the topic in more detail around Q4. He said the company fundamentally expects 2027 to be a year of growth with price momentum continuing, and that the open question is whether inflation stays at that level or relief comes.

On the Q4 guidance implication — do we need to think about negative price over cost in Building Materials in Q4, or is the price-over-cost challenge really centered on Building Envelope?

Jenisch said he is very confident for Building Materials, crediting the team's execution in Q3 on pricing, surcharges and cost mitigation, and pointed to the documentation guiding positive price over cost for the fourth quarter, which is what he expects.

Given the recent derating across the space and larger acquisitions by peers, how are you thinking about the M&A opportunity and pipeline health into 2027 — bolt-on in construction materials, or something larger and more transformative?

Jenisch pointed to a track record of successful M&A and said to expect more. He said PB Materials and Rapid Redi-Mix are both running above expectations, are EPS accretive this year, and together add more than 2% to sales and EBITDA, even if they would not qualify as a $1B deal. He described a solid pipeline of future M&A being worked daily and said he hopes to report more action in the months to come.

Potential supply chain impact
AMZNA documented customer relationship including a New York City distribution facility; continued warehousing and data center construction could support commercial roofing volumes, though this quarter's Envelope margin pressure came from cost rather than demand.
HUNA documented supplier relationship; management flagged petrochemicals-based raw materials as inflated in Q3 and a key drag on roofing margins, so chemical input pricing could remain a swing factor for Building Envelope profitability.
CRHA named principal U.S. competitor; Amrize's +1.8% cement and +6.9% aggregates pricing may signal a firmer pricing backdrop in overlapping inland markets, though management noted some market participants pricing more softly.
VMCA peer among the ten-largest U.S. aggregates producers; the acceleration in Amrize's aggregates pricing from +4% to +6.9% could be a read-across on industry pricing discipline, hedged by regional mix differences.
MLMA peer among the ten-largest U.S. aggregates producers; Amrize attributed soft aggregates volumes (-0.2%) to weather in the Northeast, South and Central regions, which may or may not have affected similarly exposed peers.
KNFA named competitor in some U.S. aggregates markets; the weather-driven volume softness Amrize described in Texas and other regions could be a shared regional demand signal for aggregates-exposed competitors.
RPMA named competitor in North American roofing products; Amrize reported residential roofing softness from low storm activity and weak existing home turnover, plus industry-level shingle destocking expected in Q4, which could pressure roofing peers similarly.