Monolithic Power Systems, Inc. earnings recap

Q3 FY2026, reported October 29, 2026 · Beat 7 of last 7 quarters

Monolithic Power Systems, Inc. reported Q3 FY2026 revenue of $1.20B, a beat of 3.5% against consensus, and EPS of $8.19, a beat of 5.1%.

The Buildout is a website built by one person using AI agents, and could have factual errors.

Go to the full Monolithic Power Systems, Inc. company page →See the earnings preview →Monolithic Power Systems, Inc. is in the Silicon Design layer →
What this means for the buildout

MPS is scaling capacity on the assumption that AI data center power demand keeps compounding — $6 billion of annual revenue support today, $8 billion targeted for the second half of 2027 and a $10 billion objective — with the enterprise data growth floor raised to 150% year-over-year. The mix matters as much as the number: modules carry higher content per socket, DDR5 PMIC plus upcoming clock drivers and RCD extend the company into memory-adjacent sockets, and 800-volt GaN/SiC sampling positions it for the next data center power architecture transition. That combination of capacity commitment and content expansion is a useful forward indicator for the power delivery layer of the AI buildout.

Results vs consensus
EstimateActualvs est
Revenue$1.16B$1.20B+3.5%beat
EPS$7.79$8.19+5.1%beat
What was said

Revenue of $1.2 billion rose 22% sequentially and 63% year-over-year, the first quarter above $1 billion, with management pointing to growth across enterprise data, communications and the start of an automotive ramp in the second half. Enterprise data growth came from existing and new customers, a shift toward modules at ASIC customers and platform content gains, while communications accelerated as optical modules stacked on top of the switch business added earlier in the year. Storage and computing was a split picture: DDR5 PMIC was the largest growth driver and HDD/SSD storage grew healthily, offset by notebook weakness tied to downstream memory constraints, leaving the segment roughly flat to up a couple of points for the year. In automotive the company received first orders for 48-volt power solutions and expects 48-volt and zonal architecture design wins to drive 2027 growth. Separately, it started ramping robotics sensor and motor control products across multiple geographies, landed a first large data converter design win expected to ramp next year, and began sampling GaN-based 800-volt data center solutions. The company repurchased over $450 million of stock in the quarter, and channel inventory remains at the lean end of the 5- to 8-week range with internal inventory days declining as revenue ramps.

Key metrics
Quarterly revenue
$1.202B
+22% QoQ and +63% YoY; first quarter above $1 billion in company history
Capacity (annual revenue support)
$6B
Surpassed in Q3; $8B targeted for H2 2027, with a $10B roadmap
Enterprise data growth floor
150% YoY
Raised from the 130% floor set last quarter; 2027 percentage not yet guided
Communications growth
+43% QoQ
Optical modules plus the newer switch business; positioned as second-fastest growing end market in 2026
Gross margin
+10 bps QoQ
Q4 guide midpoint implies roughly another 10 bps, inside the 55%-60% target range
Management outlook

Management declined to quantify 2027 but framed the forward path as a continuation of the drivers it has been citing — customer diversification in enterprise data, module content gains, platform refreshes and, over time, potential GPU growth from agentic AI workloads — while raising the enterprise data growth floor to 150% year-over-year from 130%. Capacity was the loudest signal on the call: $6 billion of annual revenue support is in place, $8 billion is targeted for the second half of 2027 and $10 billion remains the longer-term objective, with management stressing that capacity stays ahead of the business and that the fabless model avoids a large step-up in capital intensity. Communications is expected to be the second-fastest growing end market this year, with the 1.6T optical transition carrying content as well as volume and additional switch sockets building into 2027, while automotive growth is expected to be led by 48-volt and zonal architecture design wins. Gross margin is expected to stay on the slow, methodical 10-20 bps per quarter expansion path — up 10 bps in Q3 with about another 10 bps implied at the Q4 midpoint — and OpEx is expected to run below the model range at current growth rates. GaN-based 800-volt solutions are sampling alongside silicon carbide, but management does not expect meaningful revenue until late 2027 and more in 2028, and reiterated that pricing is not a significant contributor to growth.

From the call

“During the quarter, our capacity surpassed $6 billion in annual revenue support. We expect to have $8 billion of capacity in place by the second half of 2027 on our way to $10 billion in support of our rapidly expanding business.”

on Capacity roadmap

“And I see this explosive growth period in the next few years. And even this year, you see the first 9 months, okay? And we don't see anything -- any signs of the slowdown.”

on Demand trajectory

“I think at this point, given what we've seen in Q3 and Q4, we're comfortable raising the floor from -- we were at 130% year-over-year. But to your point, I think we're comfortable with a floor of 150% year-over-year now going forward.”

on Enterprise data floor raised

What analysts asked

You talked about accelerated growth — can you elaborate, and given $8 billion of capacity and then $10 billion, when could we potentially see $10 billion of capacity in place?

Michael Hsing said the company sees an explosive growth period over the next few years and no signs of a slowdown. Tony Balow added that growth is broadening across end markets — automotive ramping in Q3 and robotics beginning to ramp — so confidence is not limited to the existing businesses.

You previously gave a floor of 130% for enterprise data and now look to be tracking toward 150% — what is the new floor, and any thoughts on 2027 growth for that segment?

Balow said the company is comfortable raising the floor from 130% to 150% year-over-year going forward, but it is too early to put a percentage on 2027. The structural drivers remain intact: customer diversification, module growth, content gains as new platforms roll out, and potentially stronger GPU growth from agentic AI workloads as a further tailwind.

How does storage and computing split now across SSD, HDD, DDR5 and PMIC versus the PC VCore piece, and is PC units tracking down about 20% in the second half consistent with what you are seeing?

Balow said DDR5 PMIC is the biggest growth driver, with healthy HDD and SSD storage growth and notebook weaker on downstream memory constraints — leaving the segment roughly flat to up a couple of points year-over-year, a tale of two cities. Hsing added that clock drivers and RCD products are lined up for revenue in 2027 or 2028, expanding the addressable market well beyond power management.

Potential supply chain impact
NVDADocumented largest customer historically; management again stressed no concentrated customers in enterprise data, so GPU platform refreshes and the pace of agentic AI workloads could shift module content per socket.
ADIAn analyst raised integrated voltage regulators and ADI's Empower acquisition; MPS declined to comment on other companies but said it has its own solutions ready — competitive positioning in AI data center power delivery may evolve.
RMBSMPS is ramping high-speed memory products and has clock drivers and RCD lined up for 2027-2028 revenue — a potential encroachment into memory interface adjacent sockets.
TXNMPS said it absorbs some cost increases and shares others with customers but that pricing is not a significant growth contributor — commentary that could read on the broader analog pricing environment.
ONBroad-based automotive, industrial and enterprise data power competition; MPS cited geographically diverse auto design wins and 48-volt/zonal architecture orders as 2027 drivers.
POWIOverlap in high-voltage AC-DC; MPS began sampling GaN-based 800-volt data center solutions alongside silicon carbide, though it does not expect meaningful revenue until late 2027 and more in 2028.
NXPIAutomotive semiconductor competitor; MPS's first 48-volt orders and expected zonal architecture design wins could signal a widening content opportunity in vehicle power architectures.
STMCompetes across automotive and industrial power; MPS described auto demand as geographically broad including China, Europe and the U.S., with China particularly active.