Ferguson plc (FERG) | The Buildout — AI Infrastructure

——Mkt cap — · 52-wk —–— · YTD — · delayed
Updated Sep 22, 2026Q4 FY2026 reviewed
Ferguson distributes plumbing, HVAC, flow-control, and water products that go into data centers, chip plants, and power generation.
Revenue +4.6%
June-2026 sales $8.8B; organic growth +3.8%.
HVAC +11%
Swung from -6% two quarters earlier.
Industrial +18%
Up on a +6% prior-year comparable.
Buybacks paused
FloWorks lifts leverage to ~1.8x from 1.3x.
The Buildout Takeaway
Ferguson's growth is increasingly tied to large capital projects — data centers, power generation, and industrial work — while the housing-linked side of the business is only starting to recover. It is not a chokepoint: the model's criticality read says the AI data-center buildout would not be delayed if Ferguson disappeared, because many distributors supply the same products.
15 analysts·11 Buy4 Hold0 Sell
Coverage is thin — only 1 price estimate, so no target is shown

FY2026: net sales growth mid-single-digits · operating margin 9.5%-9.8%.
Important: The Buildout is a data analytics platform. Content is generated by algorithms and AI agents using public filings, earnings transcripts, and market data. This is not personalized investment advice.
Our View

The Verdict

Ferguson is a distributor, not a manufacturer. It buys plumbing, HVAC, appliances, lighting, pipes, valves and fittings, and water and wastewater products from manufacturers, stocks them across a branch network, and sells them, with value-added services, to the contractors, engineers, and municipalities building and maintaining North American construction. Its role in the AI buildout is indirect: the mechanical, piping, flow-control, and water content inside data centers, semiconductor plants, and power generation projects is specified and bought locally, and Ferguson supplies it. Management frames the opportunity as large capital projects and the build-out across North America, not as an AI strategy.

Market Cap—
Revenue (TTM)$31.9B
Revenue Growth+3.7%
EBITDA Margin (TTM)10.2%
Net Debt$6.0B
Earnings Beats5 of 7
P/E (TTM)—
EV/EBITDA (TTM)—

What We Like

  • Large capital projects are a mid- to high-single-digit share of total Ferguson revenue and trending up, with data centers a bit over 50% of that bucket (CFO, December-2025 call Q&A).
  • The project-linked groups grow at multiples of the company average: commercial mechanical +15% and industrial +18% in the June-2026 quarter, against 4.6% company sales growth.
  • Management says backlog and open orders are building 'above what those growth rates were for the quarter' across commercial mechanical, industrial, and waterworks.
  • Full-year guidance was raised on execution, not market: revenue to mid-single-digits and the operating-margin floor to 9.5%-9.8%, with the CFO saying the market view had not changed.
  • FloWorks closed Aug 31, 2026 at a ~$1.6B enterprise value with ~$1B of 2025 revenue, lifting the company's stated addressable market from $340B to $400B.

What We’re Watching

  • HVAC's +11% growth was not split between organic and acquired; the materiality read calls this the single most important unresolved question from the call.
  • Q3 gross margin is guided 'a bit down' against last year's 31.3%, and contribution margin printed ~7% versus a stated 11%-14% target that management did not dispute or reaffirm.
  • First-half operating cash flow was $716M, down about $400M year over year, on working capital and tax timing; large-project inventory is expected to keep building.
  • FloWorks lifts leverage from 1.3x to ~1.8x and pauses buybacks until leverage returns to the low end of the 1x-2x range; the path back is unspecified.
Bottom Line

The thesis strengthened on execution but changed shape. Ferguson converted a mix-and-capability strategy into reported growth while simultaneously shifting capital allocation toward M&A — eight deals representing ~$1.4B of annualized revenue plus FloWorks — with leverage rising toward the top of its 1x-2x range and buybacks paused. The open question is whether the HVAC and residential improvement holds without the acquisition contribution, because that split has not been disclosed.

Next upThe next catalyst is the Q3 FY2026 earnings report, where management has said it will update guidance to include FloWorks and the new debt. That tests whether the raised margin range holds once the acquisition and its interest cost are inside the numbers.
Last Quarter — Q4 FY2026

Earnings Beat

In the quarter ended Jun 30, 2026, Ferguson reported net sales of $8.8B, up 4.6% year over year, with organic growth of 3.8%. Gross margin held at 31%, down 20 basis points against a tough prior-year comparison. Operating profit rose 2.9% to $932M. The standout was HVAC, up 11% on a 1% prior-year comparable after declining 6% two quarters earlier, and U.S. residential returned to growth at +2%.

MetricQ4 FY2026Q3 FY2026Q4 FY2025YoY
Revenue$8.8B$7.5B$8.5B+3.0%
Gross margin31.0%31.0%31.7%-70bps
EBITDA$992M$709M$1.0B−2.9%
EPS (GAAP)$3.43$2.13$3.51−2.3%
Table shows reported figures; the text may discuss adjusted or continuing-operations numbers.
We are really not seeing a change in the market and our market expectations for the full-year… Our view of the market really hasn't changed much. What has changed, to your point, is our performance for the first half has been a bit better than our expectations.— Bill Brundage, Chief Financial Officer, Aug 10, 2026

Management tone: The tone on the Aug 10, 2026 call was constructive and confident, but explicitly not a market call — the CFO attributed the guidance raise to company performance rather than a better market. Versus the December-2025 call, the tone improved on HVAC, residential, and inflation, and changed to a paused buyback pending deleveraging. Management answered quantitative questions directly, with one self-correction: the CEO revised a dual-trade statistic mid-answer from 'roughly two-thirds of the market' to about one-third of the customer base.

Management Guidance

For FY2026, management guides net sales growth to mid-single-digits (raised from low-to-mid single digits) and operating margin to 9.5%-9.8% (lower end raised). On shape, second-half revenue is expected to grow faster than the first half and Q3 growth 'a bit stronger than' Q2's rate, with Q3 gross margin 'a bit down' against the 31.3% prior-year figure and second-half SG&A growth similar to Q2 or a touch higher. Management still expects overall operating leverage for the year.

Business Trajectory

Trajectory

The model's trailing signals read revenue as accelerating, with gross margin stable and operating and EBITDA margins compressing. Reported growth moved from 3.6% in the March-2026 quarter to 4.6% in June 2026, but the mix underneath shifted toward project and water work: commercial mechanical +15% and industrial +18% against a 4.6% company average, while Fire & Fabrication fell 13% and Canada sales declined 1.9%. Gross margin has held at the top of a stated 30%-31% range, but operating margin is compressing against strong prior-year comparisons — 10.7% in the June quarter, down 10 basis points — and Q3 gross margin is already guided lower.

Revenue & Margin Trajectory
RevenueGross margin (30% to 31%)$0$5.0B$7.9B$8.8BQ2'23Q4'23Q2'24Q4'24Q2'25Q4'25Q2'26Q4'26
RevenueGross margin (30% to 31%)$0$5.0B$7.8B$8.8BQ2'25Q4'25Q2'26Q4'26
Most recent quarters shown (8 on phones, 16 on larger screens). Gross margin as reported; gaps mean the figure was not reported.
Share Price — 12 Months
$200$225$250$27552-wk high $272$227Oct '25Jan '26AprJulOct '26
YTD +1.8%. 52-week range $212–$272.
Share Price — 12 Months
$200$225$250$27552-wk high $272$227Oct '25Jan '26AprJulOct '26
YTD +1.8%. 52-week range $212–$272.
The Numbers

The Model

The model projects next fiscal year's revenue of $35.2B and EBITDA of $3.72B, a 10.55% margin. For the following fiscal year it projects revenue of $37.2B and EBITDA of $4.00B, a 10.75% margin. The near-term anchor is the raised full-year guide and the large-capital-project backlog management says is building; the following fiscal year assumes continued project and non-residential growth plus the FloWorks contribution, with margin drifting modestly higher.

Revenue & EBITDA Projections
REVENUE$31.9B$35.2B$37.2BFY26Next FY (E)FY after (E)EBITDA & MARGIN$3.3B$3.7B$4.0BFY26Next FY (E)FY after (E)
REVENUE$31.9B$35.2B$37.2BFY26Next FY (E)FY after (E)EBITDA & MARGIN$3.3B$3.7B$4.0BFY26Next FY (E)FY after (E)
Solid bars are reported actuals; outlined bars are model projections — not company guidance.
MetricFY2026Next FY (E)FY after (E)
Revenue$31.9B$35.2B$37.2B
YoY Growth—+10.5%+5.7%
EBITDA$3.3B$3.7B$4.0B
EBITDA Margin10.2%10.6%10.8%

Projections are the median of 4 independent model runs.

What Could Go Right — and Wrong

What good looks like
  • HVAC returned to +11% growth on a +1% prior-year comparable, reversing the -6% print from two quarters earlier.
  • Large-capital-project backlog converts, keeping commercial mechanical and industrial growth above the company average.
  • FloWorks adds flow-control and automation capability pointed directly at data centers, chip manufacturing, and power generation.
  • The residential recovery broadens beyond HVAC, with Ferguson Home and residential trade plumbing both turning positive.
  • Leverage returns to the low end of the 1x-2x range and buybacks resume.
What could go wrong
  • Contribution margin stays near 7% instead of returning toward the 11%-14% target, so operating margin falls short of the guide even if revenue lands.
  • Q3 gross margin declines more than the guided 'a bit down' against the 31.3% prior-year comp.
  • Residential rolls back over if the +2% and +11% figures were comp- and M&A-driven rather than share-driven.
  • A data-center or large-project deferral pushes revenue timing out; Waterworks already swung from +14% to +3%.
  • Working capital stays strained: operating cash flow down ~$400M year over year with large-project inventory still building.
What’s Next

Looking Ahead

The next twelve months turn on the Q3 FY2026 report — the first guide to include FloWorks, the new debt, and leverage of ~1.8x. Management has said second-half revenue will grow faster than the first half and Q3 growth will be a bit stronger than Q2's rate, and that large capital projects will be a tailwind over the next couple of years. The tests are whether backlog keeps building faster than revenue, whether the HVAC rebound proves organic, and whether leverage comes back down enough to restart buybacks.

Catalysts
  • Q3 FY2026Guidance update with FloWorks — First guide to include the deal, new debt, and ~1.8x leverage.
  • Q3 FY2026Q3 gross margin test — Guided a bit down against last year's 31.3%.
  • 2H FY2026Second-half revenue shape — Management expects Q3 growth a bit stronger than Q2's +4.6%.
  • End of yearHVAC inventory normalization — Seasonal HVAC inventory expected to come off by year-end.
  • Over the next couple of yearsLarge-project backlog converts — Management calls large capital projects a multi-year tailwind.
  • Not disclosedLSE listing cancellation — Intention announced Jun 16, 2026; effective date not disclosed.
Numbers

Financials

Annual Summary

MetricFY2025FY2026TTMYoY
Revenue$30.8B$31.9B$31.9B+3.7%
Gross Margin30.6%30.5%30.5%10bps
EBITDA$3.0B$3.3B$3.3B+9.4%
EBITDA Margin9.7%10.2%10.2%+54bps
Net Income$1.9B$2.0B$2.0B+9.9%
Free Cash Flow$1.6B$1.3B$1.3B—
Net Debt——$6.0B—

Net Debt = total debt minus cash and short-term investments at Jun 30, 2026. A company’s own leverage measure can differ.

Key Ratios (Trailing)

Valuation
  • P/E TTM—
  • EV/EBITDA TTM—
  • EV/Revenue TTM—
  • Price/FCF TTM—
Profitability
  • Gross Margin (TTM)30.5%
  • EBITDA Margin (TTM)10.2%
  • Net Margin (TTM)6.4%
  • ROIC18.6%
  • FCF Conversion38.8%
  • SBC / Revenue0.3%
Reference

The Company

Ferguson is the largest value-added distributor serving the water and air specialized professional in the North American residential and non-residential construction market, a market the 10-K sizes at $340 billion — raised to $400 billion after FloWorks. It does not make what it sells; it buys plumbing, HVAC, appliances, lighting, pipes, valves and fittings, and water and wastewater products from manufacturers and sells them, with value-added services, to contractors, engineers, and municipalities. Its relevance to the AI buildout is indirect but real: the mechanical, piping, flow-control, and water content inside data centers, chip plants, and power generation projects is bought locally, and Ferguson is one of the distributors supplying it.

Ferguson operates two reportable segments: the United States, trading as Ferguson, and Canada, trading as Wolseley. The U.S. is the overwhelming majority — at Mar 31, 2026, segment assets were $15.9B in the U.S. versus $929M in Canada, plus $988M corporate. Distribution runs through a three-tier network: 10 U.S. regional distribution centers, 5 U.S. market distribution centers, and 1,519 U.S. branches, plus 1 Canadian regional distribution center, 1 Canadian market distribution center, and 227 Canadian branches. The U.S. business is tracked across eight customer groups, with Waterworks at 23% of U.S. revenue and Ferguson Home at 21% the largest.

Business Segments

United States (Ferguson)
Segment assets $15.9B at Mar 31, 2026
Sells plumbing, HVAC, appliances, lighting, PVF, and water and wastewater products to residential and non-residential customers.
Growth driver: Large capital projects and HVAC dual-trade buildout
Canada (Wolseley)
Segment assets $929M at Mar 31, 2026
Supplies plumbing, HVAC, and refrigeration products, plus water and wastewater treatment and PVF solutions to industrial customers.
Growth driver: Recovery in a weak residential market

Competitive Landscape

Ferguson's competitive position is described mainly through management's own framing: a multi-customer-group distributor that says it continues to outperform the markets and competes on branch density, product breadth, and early engagement with owners, engineers, and general contractors. Management argues that scarce trade labor and tight supply chains make early engagement more valuable, converting a constraint into a moat argument. The named competitor set appears to come from our map of likely supply-chain relationships and is not discussed on the calls.

  • Core & Main (CNM)
    Appears to be a waterworks and fire-protection distributor.
  • Dnow (DNOW)
    Appears to be a plumbing and HVAC distributor.
  • Appears to be an MRO and industrial distributor.
  • Watsco (WSO)
    Appears to be an HVAC/R distributor.
  • Home Depot (HD)
    Appears to be an MRO, plumbing, and HVAC facility-maintenance competitor.
These five names appear to be a directional competitive map, not confirmed competition; we found no quote naming them.

Supply Chain

Ferguson sits between manufacturers and contractors: it buys plumbing, HVAC, and water products — over 90% from branded manufacturers — and sells them through branches to builders, engineers, and municipalities. The filings name no suppliers and quantify no supplier dependence.

Supplier
CSWI
HVAC/R aftermarket parts, motors, capacitors, coils
Supplier
Pumps for HVAC, waterworks, and MRO
Supplier
Copper tube, brass fittings, valves
Supplier
Valves, hydrants, brass, repair, metering
Supplier
HVAC equipment (Trane and Mitsubishi brands)
Supplier
Zurn/Elkay/Wilkins water management products
→
Local branches and early project engagement
FERG
Two segments; a three-tier U.S. network of RDCs, MDCs, and branches.
→
Waterworks
23% of U.S. revenue
Largest U.S. customer group
Ferguson Home
21% of U.S. revenue
Declined 1% in the June-2026 quarter
Commercial/Mechanical
16% of U.S. revenue
Gained 2 points of mix; data-center project work
Industrial
7% of U.S. revenue
Grew 18% in the June-2026 quarter

Analysis updated Sep 22, 2026, reviewing Q4 FY2026. Prices delayed. Built with The Buildout’s published methodology. Not investment advice. No positions held. © The Buildout 2026.