Supply ChainTREND 3 — STRUCTURAL SHIFT

The Optical Rewiring of AI

Complete supply chain traced from raw earth to the finished 1.6T optical transceiver. Every company mapped. Every chokepoint flagged. Every gap identified.

70
Companies Mapped
29
In Universe
18
Missing
15
Foreign
8
Private
7
Chokepoints
Legend
In Universe (Have)
US-Listed Gap (Miss)
Foreign-Listed
Private
Faded chip = secondary exposure
⛏️Quartz / High-Purity Silica Sand
for fiber preforms & silicon wafers
Spruce Pine, NCQuartz Corp / Sibelco
⚠ CHOKEPOINTSpruce Pine, NC produces most of the world's ultra-high-purity quartz for semiconductor crucibles and fiber preforms. A single geographic location. Hurricane Helene (2024) temporarily disrupted supply.
⛏️Indium
for InP laser wafers & thermal materials
TECKTeck Resources (zinc/In byproduct)Korea ZincKRX: 010130
⚠ CHOKEPOINTChina controls ~50% of primary indium. Indium is a byproduct of zinc ore processing. Supply is inherently inelastic — you can't mine more indium without mining more zinc.
⛏️Gallium
for III-V compound semiconductors (lasers, TIAs)
AAAlcoa (potential Ga recovery)RIO— not in universe
⚠ CHOKEPOINTEXTREME — China produces ~80% of global gallium. Byproduct of bauxite/alumina processing. China imposed export controls on gallium effective Aug 2023, tightened Dec 2023. This is a first-order geopolitical risk for every laser diode on Earth.
⛏️Germanium
for photodetectors in silicon photonics & fiber dopant
TECKTeck Resources (Ge byproduct of Zn)UmicoreBrussels: UMI — largest Western Ge refinerYunnan GeSZA: 002428 — world's largest Ge producer
⚠ CHOKEPOINTEXTREME — China controls ~60-70% of germanium + export controls active. China imposed export controls on germanium in 2023. Germanium is essential for photodetectors in every silicon photonics chip and as a dopant in every meter of optical fiber.
⛏️Rare Earths (Erbium, Ytterbium, Yttrium)
for optical amplifiers & ceramic ferrules
MPMP Materials — only scaled US rare earth mineLynasASX: LYC — Australian processor
⚠ CHOKEPOINTEXTREME — China controls ~90% of rare earth processing. Erbium (for EDFAs), ytterbium, and yttrium (for zirconia ferrules) are all dominated by Chinese supply. Building non-Chinese separation capacity takes years.
⛏️Zircon Sand
for precision ceramic ferrules in MPO connectors
TROXTronox — US-listed mineral sandsIlukaASX: ILU — world's largest zircon producer
⛏️Copper
for PCB substrates, heat spreaders, cable
FCXFreeport-McMoRan — world's largest public Cu minerTECKTeck Resources
⛏️Phosphate Rock
electronic-grade phosphorus for InP
MOSMosaic Company
🧪Ultra-High-Purity Industrial Gases
PH₃, GeH₄, SiH₄, NF₃, specialty etch gases
🧪Specialty Chemicals, CMP Slurries, Photoresists, Metalorganic Precursors
ENTGEntegris — CMP slurries, filtration, advanced materialsJSRTokyo: 4185 — EUV photoresists (being privatized)TOKTokyo: 4186 — EUV photoresists
⚠ CHOKEPOINTHIGH — ~90% of EUV photoresist supply is Japanese. JSR, TOK, and Shin-Etsu dominate the EUV resist market. Every DSP chip in every transceiver depends on this supply chain.
🧪Electronic-Grade Polysilicon (9N-11N purity)
HemlockHemlock Semiconductor (JV: Corning/Shin-Etsu)WackerFrankfurt: WCH — major EGS producerDQDaqo New Energy — ramping EGS
🧪SiCl₄ and GeCl₄
precursors for fiber preforms
GLWCorning — makes own synthetic silica internallyHeraeusPrivate German — leading synthetic silicaUmicoreBrussels: UMI — high-purity GeCl₄
🧪High-Frequency PCB Laminates (low-Dk, low-Df)
ROGRogers Corp — specialty high-frequency laminatesPanasonicMegtron 6/7/8 series — dominant in HF laminate
🧪Zirconia Powder (for ceramic ferrules)
TosohTokyo: 5765 — near-monopoly in zirconia powder
⚠ CHOKEPOINTHIGH — Tosoh is near-single-source for zirconia. Every MPO/MTP fiber connector in every AI data center depends on precision zirconia ferrules. Tosoh dominates the raw powder market.
💿Indium Phosphide (InP) Wafers
the foundation of every laser diode
AXTIAXT Inc. — largest merchant InP supplier (CHINA FAB)SumitomoTokyo: 5802 — grows InP, mostly internalJX Nipponsubsidiary of ENEOS — InP wafers
⚠ CHOKEPOINTHIGH — AXT Inc. (AXTI) is the largest merchant InP supplier, manufacturing entirely in Beijing. US-listed company but China manufacturing. If US-China trade restrictions tighten, this is a first-order chokepoint for the entire optical transceiver industry. InP crystal growth is extremely difficult — very few companies can do it at scale.
💿Silicon-on-Insulator (SOI) Wafers
for silicon photonic ICs
SoitecParis: SOI — near-monopoly in photonics SOIShin-EtsuTokyo: 4063 — world's #1 silicon wafer maker
⚠ CHOKEPOINTHIGH — Soitec is effectively single-source for photonics-grade SOI wafers. The entire silicon photonics industry — including CPO — depends on SOI wafers. Soitec's Smart Cut technology is patented and unmatched.
💿300mm Silicon Wafers
for DSP chips, TIAs, drivers
Shin-EtsuTokyo: 4063 — #1 globally (~30%)SUMCOTokyo: 3436 — #2 globally (~25%)GlobalWafersTWSE: 6488 — #3SiltronicFrankfurt: WAF — #4
⚠ CHOKEPOINTMODERATE-HIGH — Japan (Shin-Etsu + SUMCO) = ~55% of global silicon wafers. Top 5 wafer makers control >95% of the market. Well-known oligopoly but no US-listed pure-play exists.
💿Fiber Preforms
the glass rod that becomes optical fiber
GLWCorning — #1 preform maker, proprietary OVD processPrysmianMilan: PRY — #2 globally (via OFS heritage)SumitomoTokyo: 5802 — VAD processYOFCHKSE: 6869 — world's largest fiber by volume (Chinese)
💿Photomasks
for DSP and photonic IC lithography
PLABPhotronics — US-listed photomask makerToppanTokyo: 7911DNPTokyo: 7912
💿High-Frequency PCB Substrates
TTMITTM Technologies — US high-end PCB/substrateROGRogers Corp — specialty laminates
⚙️III-V MOCVD Epitaxial Growth Equipment
the machines that grow laser layers
AixtronFrankfurt: AIXA — III-V MOCVD leaderVECOVeeco Instruments — US-listed, MOCVD tools
⚠ CHOKEPOINTHIGH — Aixtron + Veeco = duopoly in III-V MOCVD. Every InP laser wafer on Earth is grown in an Aixtron or Veeco reactor. Veeco is US-listed and NOT in our universe.
🧠DSP Chips (PAM4 encoding, FEC, CDR)
the brain of the transceiver
⚠ CHOKEPOINTEXTREME — All 1.6T DSPs are fabricated at TSMC (3nm/5nm). TSMC (TSM) is a single point of failure for every 1.6T transceiver DSP on Earth. Broadcom + Marvell together = ~90%+ of the merchant DSP market. And TSMC fabs are concentrated in Taiwan.
TIA + Driver ICs (transimpedance amplifiers, laser drivers)
🔭Drawn Optical Fiber (G.652/G.657 single-mode)
GLWCorning — #1 Western fiber maker, vertically integratedPrysmianMilan: PRY — #2 globally, US ops (Solon OH)YOFCHKSE: 6869 — #1 by volume (Chinese)SumitomoTokyo: 5802 — major fiber maker
🔧Semiconductor Fab Equipment
for DSP, TIA, SiPh fabrication
⚠ CHOKEPOINTEXTREME — ASML is sole source for EUV lithography. Every 3nm/5nm DSP chip requires EUV. ASML is the only company on Earth that makes EUV scanners. Dutch company, US ADR listed.
📦Module Assembly (pluggable OSFP / QSFP-DD transceivers)
COHRCoherent — vertically integrated, laser to moduleLITELumentum — modules & componentsAAOIApplied Optoelectronics — volume transceiver supplierInnolightSZA: 300502 — largest volume shipper to NVIDIAEoptolinkSZA: 300502 — Chinese module assembler
⚠ CHOKEPOINTMODERATE — Chinese assemblers (Innolight etc.) = 50-60% of global module volume. Innolight has captured enormous share supplying NVIDIA GPU clusters. US/Western alternatives exist but at lower volume. Geopolitical risk node.
🔍Test & Measurement
qualifying every optical link
KEYSKeysight Technologies — BER testers, optical scopes (NOT in universe)VIAVViavi Solutions — OSA, power meters, OTDR (NOT in universe)TDYTeledyne — high-speed oscilloscopes / LeCroy (NOT in universe)EXFOEXFO — fiber test, OTDR, BER (NOT in universe)